Object: Technical information and offer about our concrete fibres production lines
A) Stand to can contain 40 spools of round wires diameter 1,20 mm having a max weight of KG. 35 each
one. (On request is possible to have different spools stand for bigger spools on customer request).
B) Motorized flattening wire group with manual flattening adjustment able to give a little flattening to all the
40 round wires simultaneously that permit to have enough traction power to unwind the spools and at the
same time to can have a better control of the wires. The flattening is also necessary to can be sure that all
the wires will have the same identical diameter dimension to avoid sliding of the single wires under the
feeding rollers.
C) production press "high speed" at two columns guides having the following characteristics:
- Main guide of die based in two columns, (instead on a central ram like the standard presses).
- Eccentric mechanical movement positioned near the floor, (instead on the top of press like the standard presses).
-Low barycentre and monolithic box body of the press suitable to avoid any vibration and deformation during the
staples stamping and reducing considerably the work noise, (about a 30% less respect a standard press).
All the complete line is controlled by:
A) General panel control served by PLC with programmable touch screen having a colour display indicating
all the possible alarms of the machine with the relative solutions, with all the electronic component of
last generation.
. In the press is besides assembled an electronic wires feeding controlled by brushless motor able to feed the press at
very high production speed.
Tecnical information:
E 100 F
E 200 F
SALES CONDITIONS
DELIVERY TIME: 6 -7 months from the receiving of the first 30% of payment on order.
IN THE PRICES ARE INCLUDED:
• All the manuals for use and maintenance in English language including spare parts list and electrical schemes.
• The packages of the machines and the charge on truck ready for the shipment. Where are utilized wooden boxes
they will be certified by fumigation treatment ISPM 15 – FAO / FITOK
• The CE certification.
• The certification of one year warrantee
• The training in our plant for the 2 – 3 days necessary to have all the technical information and to have the
instruction for the production. Our Company will pay the hotel and the food for one or 2 your technicians
during the 2-3 days of training, at your cost the trip to our plant.
To can start the machine and to can make the training, the customer will have to ship us the 40 or 50 spools of
round wire necessary to test the machine. The sending of the material for the test will be at full customer’s
charge and the wire on spools must to arrive in our plant at least 2 months before the final delivery date.
All the line is guaranteed by our Firm for a period of one year from the final invoice date, for all the commercial
parts assembled in our lines will be valid the manufacturer’s warrantee conditions that will not shortest of one year.
The warrantee will not cover the parts brokered for the following reasons:
- Mistakes of the operators working on the line.
- Material utilized for the production not conforming.
- Overvoltage in the electrical feeding line
- Lightning or others atmospherically matters.
- Modifications applied by the customer without our previous written authorization.
Our Firm is not responsible of eventual economical damages that our customer can have for “production failure”
during the eventual line stop for reparation.
VALIDITY PERIOD OF THIS OFFER: 3 months from the date of the present.
Always at your complete disposal, and hoping in a your kind interest in our offer, I am sending you my best regards.
Thank you.
Mirco Sarti
Best regards
Mirco