WEEKLY REPORT 27/2/17 TO 5/3/17

1 Total no of working days(as per permits)-07

2 Total no of manpower-1942

3 safe man hours (workers&staff)-16613

4 Induction conducted(workers)-

5 induction conducted(staff)-nil

6 Induction attendees(workers)-

7 Induction attendees(staff)-nil

8 tool box talk conducted-7

9 tool box talk attendes-1790

10 General work permits-07(PERMIT NO:76 TO82)

11 Height work permits-7(PERMIT NO:67 TO 73)

12 Hot work permits- 7 (PERMIT NO:43 TO 49 )

13 Night work permits-6(PERMIT NO :52 TO 57)

CHECKLISTS:

14 hydra-02

15 scissor lifts-02,reach truck,forklift

16 TightingMachines,Groutingmachines,cuttingmachines,grinding machines

17 Fire extinguisher-04

18 Generator-02

19 Main distribution board ,sub distribution board

20 safety belts

PREPARED BY: APPROVED BY: