Professional Documents
Culture Documents
Npe SD Sqe Pip Ax4303 0009 Pad Leak Test
Npe SD Sqe Pip Ax4303 0009 Pad Leak Test
SUBCONTRACTROR
Work No:-
SUBPT.ATA Doc. No.: NPE-SD-PIP-PRC-AX4303-000 Page : 1 of 1
PROJECT ORIGINATOR
RECEIVED DATE
DATE
Rev ISSUE PURPOSE PREPARE CHECKED APPROVED AUTHORIZED
ISSUED
NPE PROJECT
U/G PIPING WORK (Package-3)
PAD LEAK TEST PROCEDURE
Client Work No: Project Doc. No: Security Level 2
SUBCONTRACTROR
Work No:-
SUBPT.ATA Doc. No.: NPE-SD-PIP-PRC-AX4303-000 Page : 2 of 7
Revision History
Rev.0 FOR APPROVAL
NPE PROJECT
U/G PIPING WORK (Package-3)
PAD LEAK TEST PROCEDURE
Client Work No: Project Doc. No: Security Level 2
SUBCONTRACTROR
Work No:-
SUBPT.ATA Doc. No.: NPE-SD-PIP-PRC-AX4303-000 Page : 3 of 7
TABLES OF CONTENT
1.0. GENERAL 4
2.0. OBJECTIVE 4
2.1. Scope 4
3.0. REFERENCE 4
3.1. Code and Standard 4
4.0. DEFINITION 5
5.0. CONFLICT 5
SUBCONTRACTROR
Work No:-
SUBPT.ATA Doc. No.: NPE-SD-PIP-PRC-AX4303-000 Page : 4 of 7
1.0. GENERAL
Purpose of this procedure is to describe the process to perform Coating and Wrapping
Construction Works of underground pipe for New Project PE at PT.CHANDRA ASRI
PETROCHEMICAL
2.0. OBJECTIVE
The purpose of this procedure is to establish the criteria for Pad Leak Test used in the
project follow the applicable codes, standards, and project requirement to ensure that
pressure test are conducted safely and effectively.
2.1 Scope
This Procedure covers the Pad Leak Test for NPE PROJECT
400 KTA NEW SWING PLANT HDPE LLDPE AND mLLDPE, Anyer, Banten.
3.0. REFERENCE
The following applicable section of the latest edition of standards, including addenda and
referenced documents project's specification shall form an integral part of this
specification. Where the requirement of the subject is defined by two or more references,
the more stringent reference shall govern.
SUBCONTRACTROR
Work No:-
SUBPT.ATA Doc. No.: NPE-SD-PIP-PRC-AX4303-000 Page : 5 of 7
4.0. DEFINITION
The following words and terms shall have the meanings hereby assigned to them,
unless noted otherwise.
5.0. CONFLICT
If any conflict exists between this specification and other Technical Requirements and the
applicable codes and standards, it shall be submitted in writing to Employer for resolution.
For the implementation of the necessary pipe work testing tool as follows:
Testing tools: pressure tools, pressure gauge, manifold and proper hand tools.
Accessories: venting valve, pressure flexible hose.
Pressure test by using air inlet connection in the pressure with a pressure of 0.5
bar maximum, then spray with soapy water.
NPE PROJECT
U/G PIPING WORK (Package-3)
PAD LEAK TEST PROCEDURE
Client Work No: Project Doc. No: Security Level 2
SUBCONTRACTROR
Work No:-
SUBPT.ATA Doc. No.: NPE-SD-PIP-PRC-AX4303-000 Page : 6 of 7
1) After All visual Items clear, preparation Internal testing prior conducting official
testing.
2) Pre-Leak Test before Random witness by Owner, ATA shall be carry out
internal test and prior inspection by IKPT.
3) Testing in the pressure with a pressure of 0.5 Bar, then spray with soapy
water.
4) Acceptance