Professional Documents
Culture Documents
Chap 0.1 Brief Introduction
Chap 0.1 Brief Introduction
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
1. Coagulant preparation and dosing
• Solid dosing: less applied due to the high demand of dosage control
and mechanic facilities;
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
1. Coagulant preparation and dosing
1) Coagulant dissolution and dosing process
Water
Solution tank A
Water
Dissolution Quantitative Dosing
Reagent Stirring
tank control equipment equipment
Stirring
Solution tank B
Water
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
1. Coagulant preparation and dosing
1) Coagulant dissolution and dosing process
Water
Solution tank A
Water
Metrical equipment
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
1. Coagulant preparation and dosing
1) Coagulant dissolution and dosing process
Dosing
equipment
Flow meter
Metrical equipment
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
1. Coagulant preparation and dosing
1) Coagulant dissolution and dosing process
Dosing
equipment
Dosing before pump
Metrical equipment
Pump dosing: metering/ centrifugal pump
Injection equipment Coagulant dosing
Dosing by water injection
Dosage box
Pipe injection
Liquid lifting equipment
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
2. Mixing facilities
Basic requirement: Mixing between reagent and water should be rapid and uniform.
Mixing facilities High efficiency; no mixing facilities;
Power saving; Wide application.
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
2. Mixing facilities Reagent
Pipe Mixing unit
Pipe
Raw
water
Mixing facilities
Static mixer
Pump mixing
Mechanical mixing
Simple structure
Mixing rapidly
Lower mixing efficiency when
flow rate in pipeline is too small
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
2. Mixing facilities
Mixing facilities
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Basic function: Benefit floc formation from fine particles in raw water.
Flocculation facilities
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Flow to sedimentation tank
Influent Influent
pipe pipe
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Water head loss of hydraulic baffled flocculation tank:
Flow rate at the corner of
corridor i Flow rate in corridor i
v ic2 v i2 n
=h ∑ ξ mi + 2 li
i =1 2g Ci Ri
Local resistance coefficient Total length of corridor i
Local head
in theloss
corner Frictional head loss
vi —— Flow rate in corridor i, m/s;
vic —— Flow rate at the corner of corridor i, m/s;
mi —— Number of corners in corridor i;
ξ —— Local resistance coefficient at the corner: for reciprocating corridor (180°turning), ξ=3;
for rotary corridor (90° turning), ξ=1;
li —— Total length of corridor i, m;
Ri —— Hydraulic radius of flow section in corridor i, m;
Ci —— Flow rate coefficient, correlated with hydraulic radius Ri and rough coefficient σ;
清华大学环境学院 calculated by Manning formula Ci=R-6/σ or check the hydraulic calculation table.
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Main design parameters of hydraulic baffled flocculation tank:
• Usually more than 2 tanks; flocculation time: 20~30 min;
• Flow rate decreased along the corridors: initial 0.5~0.6 m/s, terminal 0.2~0.3 m/s;
• Distance between corridors gradually broadens from origin to terminal, to decrease flow
rate gradually;
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Flocculation facilities
Based on baffled flocculation tank,
vertical flow;
Influent Effluent
Hydraulic baffled
flocculation tank Improved flow conditions;
Hydraulic folded plate
flocculation tank Flocculation time: 10~15 min;
Mechanical Reduced tank volume;
flocculation tank
Combined Difficult for installation and maintenance;
flocculation tank
High cost for folded plate.
Influent Effluent
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Influent
Influent
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Horizontal shaft
type mechanical
flocculation tank
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Stirrer: propeller plate (commonly used)/impeller type
v b2
dFi = CD ρ dA
2
dFi —— Flow resistance for a propeller plate with square dA, N;
Cd —— Resistance coefficient, determined by propeller plate width-
height ratio;
ρ —— Water density, kg/m3;
vb —— Flow rate relative to propeller plate (propeller plate rotating
linear velocity), m/s.
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Stirrer: propeller plate (commonly used)/impeller type
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology
3. Flocculation facilities
Stirrer: propeller plate (commonly used)/impeller type
Plate
Flocculation facilities
Hydraulic diaphragm
flocculation tank
Hydraulic folded plate influent
flocculation tank
Mechanical Combination of mechanical and hydraulic baffled flocculation tank;
flocculation tank
Combined Mechanical stirring intensity can be adjusted when water quality and
flocculation tank quantity changed;
Once mechanical stirring device breaks down, hydraulic baffled
flocculation tank still works.
清华大学环境学院
Water and Wastewater Treatment Engineering
Physicochemical Technology