Professional Documents
Culture Documents
BOQ
BOQ
PROJECT
COAL HANDLING PLANT AND SILO LOADING DOC. NO. REV.0
ARRANGEMENT AT ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE CONCRETE BOQ OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 TO 003 JTP SM
TOTAL
LENGT WIDTH HEIGHT VOLUME OF NO. OF
ITEM NO DESCRIPTION VOLUME
H (m) (m) (m) ITEM (m )
3
PCE.
(m3)
EARTH WORK EXCAVATION
PILE CAP 23.65 18.65 2.075 915.225 1 915.23
CONCRETE-M25
RAFT 23.50 18.50 1.000 434.750 1 434.75
TOTAL CONCRETE (RAFT) 434.75
PEDESTAL
PD1 1.00 1.000 3.475 3.475 14 48.65
TOTAL CONCRETE (PEDESTAL) 48.65
PLINTH BEAM
PB1 17.00 0.30 0.600 3.060 3 9.18
PB2 5.50 0.30 0.600 0.990 1 0.99
PB3 11.50 0.30 0.600 2.070 2 4.14
PB4 12.50 0.30 0.750 2.813 2 5.63
PB5 3.00 0.40 0.400 0.480 1 0.48
PD2 0.30 0.450 0.300 0.041 2 0.08
TOTAL CONCRETE (PLINTH BEAM) 20.50
PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE RAFT - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 & 002 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 0 0 441 0 17704 0 0 0 m
Total weight 0 0 391 0 43729 0 0 0 kg
This schedule complies with BS 4466
* Specified in multiples of 5 mm ** Specified in multiples of 25 mm
REINF. BBS OF TRANSFER HOUSE-TH10
PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE PEDESTAL - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 & 002 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 0 10765 0 0 0 0 0 1798 m
Total weight 0 6642 0 0 0 0 0 11343 kg
This schedule complies with BS 4466
REINF. BBS OF TRANSFER HOUSE-TH10
PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE PLINTH BEAM - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-003 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 1020 0 207 414 366 23 0 0 m
Total weight 403 0 183 655 903 87 0 0 kg
This schedule complies with BS 4466
REINF. BBS OF TRANSFER HOUSE-TH10
PROJECT
COAL HANDLING PLANT AND SILO LOADING ARRANGEMENT AT DOC. NO. REV.0
ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE PLINTH BEAM - BBS OF TRANSFER HOUSE-TH10 DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-003 JTP SM
Length
Type No. of of each
and No. of bars in bar ** Shape A* B* C* D* E/R *
Member Bar mark size mbrs each Total no. mm code mm mm mm mm mm .
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
0 0 /0
SUMMARY
d 8 10 12 16 20 25 28 32 mm
Total length 472 0 127 147 132 0 0 0 m
Total weight 186 0 113 233 327 0 0 0 kg
This schedule complies with BS 4466
REINF. BBS OF TRANSFER HOUSE-TH10
PROJECT
COAL HANDLING PLANT AND SILO LOADING DOC. NO.
ARRANGEMENT AT ANANDA SIDING V & VI 01-CHP01-TH10-DC-CE-001
TITLE BOQ & BBS FOR TH10 CIVIL WORK - SUMMARY DESIGN CHECKED
DRG. NO. 01-CHP01-TH10-DS-CE-001 TO 003 JTP SM
DOC. NO.
01-CHP01-TH10-DC-CE-001
CHECKED
SM
TOTAL
44.12
17.98
3.10
-
65.20