control of access and usually provided with grade NH-24 from Km. 0.000 to 27.500 which are
separators at location of intersections24. expressways PPP projects have higher financial
Expressways are constructed on a certain stretches prequalification limits as shown in Table 2.
of road because of high traffic demand along The project Six-Lane Eastern Peripheral
that route. Since there is a high traffic density, Expressway was first tendered in the year 2013.
the project will be profitable and of low traffic The prequalification limits of the project were set at
revenue risk profile. There will be large interest 59.45% financial capacity. Due to lack of response
among the private parties towards the project. The from private parties, the project was retendered in
prequalification limits can be set high in the PPP 2014 with the prequalification limits lowered to
projects involving Expressway. 55.45% financial capacity. NHAI retendered the
The projects Delhi-Meerut Expressway from bids five times but each time no private party came
Km 27.500 to Km 64.552 of NH-24; NH-58 and up. Finally, the implementation mode was changed
NH-235, Six-Lane Eastern Peripheral Expressway to EPC25. This case clearly indicates the setting
(NH No. NE-II) from km 0.00 to km 135.00 on of prequalification limits in accordance with the
NH-1 and NH-2, Delhi-Meerut Expressway of number of interested private parties.
Table 2 Projects Showing Extreme Deviation from the Conventional Prequalification Limits

Year Project State/States PQ Limits GQ EW GSDP


Rank
TC FC S1 S2
Projects with High Prequalification limits
2009 4-laning of Sambalpur –Baragarh 1. Orissa 200.00 25.00  14 16
Chhattisgarh/Orissa Border 2. Chhattisgarh
Section of NH 6
2011 Four Laning of Amravati- 1. Maharashtra 100.00 60.06  1 5
Maharashtra/ Gujarat Border 2. Gujarat
Section of NH-6
2013 Delhi-Meerut Expressway from 1. Uttar Pradesh 100.00 52.15  2
Km 27.500 to Km 64.552 of NH-
24; NH-58 and NH-235
2013 Six-Lane Eastern Peripheral 1. Haryana 100.00 59.45   12 2
Expressway (NH No. NE-II) from 2. UP
km 0.00 to km 135.00 on NH-1;
NH-2
2015 Delhi-Meerut Expressway of NH- 1. Delhi 100.00 32.69  9 3
24 from Km. 0.000 to 27.500 2. Uttar Pradesh
2015 Six Laning of Bihar- Jharkhand 1. Bihar 100.00 31.94  12 16
Border (Chordaha) to Barwa 2. Jharkhand
Adda Section of NH-2
Projects with Low Prequalification limits
2008 Four Laning of existing 2 lane of 1. Jharkhand 84.07 25.00  16
Hazaribagh-Ranchi Of NH-33
2008 Six Laning of Samakhiali- 1. Gujarat 62.08 25.00 5
Gandhidham Section of NH 8A
2008 Four Laning of Bijapur-Hungund 1. Karnataka 54.52 25.08 7
Section of NH-13