ASME codes edition Is issued once in 3 years and addenda, once
a year - both on 1 July. Edition and addenda become effective
‘on 1* January of next year ( i.e. 6 months after issue).
ASME Sec VIII Div.1 is Unfired Pressure Vessel and is applicable fofoy
to pressures exceeding 15 psig, up to 3000 psig and diameters Intrcbehory
above 6.0”. Pump and turbine casings are excluded.
Thickness of cylindrical shell t= PR
SE-0.6P
Longitudinal weld is more critical because it is subjected to
double the stress than Circ. Weld.
‘Weld joint categories’ A,B,C,D - are based on joint locations in
the vessel and stress levels encountered. ‘weld Types’ ( type
1,2,3...etc) describe the weld it self.
Depths of 2:1 Ellip and hemisph. heads are D/4 and D/2
respectively. (D= Head diameter.)
Weld Joint categories:
Category A: - All fongitudinal welds in shell and nozzles.
- All welds in heads, Hemisph-head to shell weld joint
Category B: - All circumferential welds in shell and nozzles,
- Head to shell joint (other than Hemisph.)
Category C and D are flange welds and nozzle attachment welds
respectively.10.
11.
12.
13.
14.
Weld Types:
Type 1: Full penetration welds ( Typically Double welded)
Type 2: Welds with Backing strip.
Type 3: Single welded partial penetration welds.
Type 4,5,6 are various Lap welds ( rarely used)
For full penetration welds (type 1),
Joint efficiency, E= 190%, 85%, 70%,
For the radiography = Full, Spot, Nil respectively.
Radiography marking on name plates ( typically for Type-1 welds)
RT-1: (E=1) All butt welds - full length radiography.
RT-2: (E=1.0) All Cat. A Butt welds Full length , Cat B, spot.
RT-3: (E=0:85) Spot radiography of both Cat A and B welds
RT-4: (E=0.7) Partial / No radiography
For Welded Heads for E=1, all welds within the head require full
h radi ince th 1 Cat, :
length radiography (since they are all Cat, A welds)
For seamless heads , E=1, If a) head to shell weld is fully
radiographed ( if Cat A), and at least spot radiographed ( if Cat, B)
ari RZ
Compared to Cylindrical shell, thickness of 2:1 Ellipsoidal head is
approx. same as shell, Hemisph. head approx. half and Torisph head
is 77% higher.
MAWP is calculated for: Working condition (Hot & Corroded). Vessel
MAWP is always taken at the Top of the Vessel and is lowest of all part
MAWPs adjusted for static pressure.SATE
API 510 PREPARATORY COURSE
Points To Recall - Day 2.
Hydro-Test Is Standard Pressure test on Completed Vessels.
Hyd. Test Pr. = 1.3 x MAWP x stress ratio
Min Insp. Pressure (hydro) = test pr./1.3
Min. Test temp = MDMT + 30 deg.F
Max. Inspection W. = 120 deg. F
Temp
Pneumatic test is performed if Hydro is not possible due to design
or process reasons . Prior to the test, NOT as per UW-50 is
mandatory. Pneumatic Test pr = 1.1 x x Stress ratio,
Pressure should be Increased in steps (Total 6).
1* step - 50% of Test pr.
2" to 6 step - 10% of Test for
Insp. Pr. (pneumatic) = Test pr,/1.1
Pressure Gauge range should be about twice the Test Pressure,
However, in any case it shall not be lower than 1.5 times and not
higher than 4 times the Test Pressure.
Vessel MAWP represents the Maximum Safe Pressure holding
capacity of the vessel .vessel MAWP is Measured at top-most point.
And is lowest of vessel part MAWPs.
For vertical vessels, Hydrostatic pressure caused due to liquid with
specific gravity = 1,
1ft of height = 0.43 psig. Or 1 mtr of height = 0.1 Bar
43311.
12.
Total pressure at any point of Vertical vessel is given by:
Total Pr. = Vessel MAWP +(h x 0.433)
(h= height from top in ft.)
If part MAWP and elevations are known, Vessel MAWP can be
calculated by {i deducting hydrostatic pressure from part MAWP.
Ext. pressure is worked out on basis of Geometric factor A (which
depends on L/Do and Do/t ratios) and factor B ( depends on A, )
ane
Allowable Ext. Pressure, Pa = 3(Do/t)
For values of A falling to left of material line in the material chart,
pa = 248
3(Do/1)
Name plate shows The Code stamping, MAWP, design temp.,
MDMT, and Extent of Radiography.
For the impact test requirement, UCS 66 curve. If MDMT-thickness
combination falls on or above the curve, impact testing is exempted
Additional Exemptions are given as per UG-20(f) and UCS=68 (c ).
ASME materials (SA) shall be used for code stamped vessel
fabrication instead of ASTM (A) materials.we
SAW
API 510 PREPARATORY COURSE
Points To Recall — Day 3
Reinforcement pad is not required, if the size of finished
opening is
— Not exceeding 2 3/8” for all thicknesses of vessel
— Not exceeding 3 1/2", if vessel thickness is < 3/8”
Reinforcement pad with OD = 2d and thk = vessel thk is always
safe (d= dia of finished opening)
Reinforcement Limit along vessel wall = 2d
Reinf. Limit normal to vessel wall = smaller of: 2.5 t or 2.5 tn
In reinforcement pad calculations, credit can be taken for area
available in shell and nozzle.
Fillet weld Throat dimension = 0.707 x leg of weld
Adequacy of weld sizes shall be checked as required by UW-16.
The nozzles construction shall be one of the Code acceptable
types.
The maximum permitted ovality tolerance (D max - D min)
shall not exceed 1% of nominal diameter of vessel. If there is
opening, then the tolerance can be increased by 2% x d (d =
diameter of opening) if measurement is taken within a distance
of ‘d’ from axis of opening.10.
it.
12.
13.
14,
15.
16.
The mis-match tolerances and the maximum allowable weld
reinforcement is more strict on longitudinal welds compared to
circumferential welds (UW-35).
Principle of reinforcement:
Area removed = Area compensated.
Compensation area shall be within reinforcement li
its.
For use as pressure parts, the plates shall be fully identified.
Maximum permitted under tolerance on plates is 0.01" (0.3
mm) or 6% of ordered thickness, whichever is less.
All Welding (including tack, seal etc.) shall be done using
Qualified procedures and welders
Mandatory Full Radiography is required for all welding with
thickness exceeding Table UCS-57, and also for lethal service
vessels and Unfired boilers with Design Pr. More than 50 psig.
PWHT is Code Requirement if thickness exceeds those given in
tables UCS-56 (given in notes under the tables). These tables
also give min. PWHT temperature and min. holding time
(soaking period) based on P-nos. and thickness respectively.
For Furnace PWHT, Loading Temperature shall not exceed 800
deg.F, heating rate 400 deg F/hr/inch of thickness, Cooling rate
500 deg.F /hr/inch of thickness. Still air cooling permitted
below 800 deg.F. During Soaking period, temp difference
between hottest and coldest part shall not exceed 150 deg.F
Min. Overlap for PWHT in multiple heats = 5 ft.SAN
API 510 PREPARATORY COURSE
Points To Recall - Day 4
1, API 510 Is applicable to Vessels that have been placed in
service, and It can not be adopted for New constructions.
2. Following are excluded from scope of API 510:
~> a. All mobile vessels
~> b. All exclusions of ASME Sec VIII Div, 1
>. Vessels not exceeding 5 cubic feet and 250
psi design pressure or 1.5 cubic feet and
600 psi design pressure
3. Alteration: It is change in component that has design
implications affecting pressure and/or temperature rating.
4. — Repair: It is restoring vessel suitable for operations at the
Present design conditions. Repairs do not change Pr-Temp
rating of vessel.
5. Authorized inspection agency: Any one of following:
a. Jurisdiction organization
b, Insurance company which under writes
insurance of pressure vessels
¢. Inspection organization of owner-user
d. Inspection organization under contract with
owner user
6. Repair Organization: Any one of following:
a. Holder of ASME certificate & appropriate
code symbol stamp.
b. Owner-user
c. Contractor under contract with owner-user
d. Organization authorized by jurisdictionOn-stream inspection means NDT inspection done on Vessel
without entering Inside vessel. This inspection Is basically to
know process side deterioration.
Re-rating: A change in either MAWP or temperature rating or
change in both.
9. Owner-User bears Ultimate responsibility for all
activities (inspection, Engineering, repairs etc.) under
API 510.
te 10. Authorised Inspector is responsible to Owner-User to:
a).
b).
°.
Determine that all work (inspection, repairs ,alteration)
is carried out as per requirements of API-510
By getting Involved In the actual activities performed
Evaluate & accept/reject results of NDT and other tests.
11. Modes of failure:
a.
Chemical corrosion: - uniform corrosion
~ pitting corrosion
Fatigue : - due to stress reversals
Creep:- At elevated temp. below Yield point.
Erosion: - Due to high fluid velocity,
turbulence & suspensions
Failure due to freezing of aqueous solutions.
Brittle failure - due to loss of impact strength
at lower temperature
Loss of ductility in Cr-Steels due to improper
PWHT or service at high temperature (>700°F)API 510 PREPARATORY COURSE
Points To Recall - Day 5
1. For new service, or for changed service, if corrosion rate
is not known, on-stream determination after 1000 hours
shall be made to establish or confirm corrosion rate.
2. MAWP = *"/easo.ct)
Where t = t acta: - 2x Cn
Cn = metal loss upto next inspection
3. For corrosion area of considerable size; thickness
averaging along most critical element shall not exceed
following length (1):
a. Vessel 1.D. < 60”.
b. Vessel I.D. > 60”.
| = D/2 or 20” use smaller value
= D/3\40" use smaller value
OR
‘The widely scattered pits, can be ignored if: q
“The min the auaikible @ the bottem of te pit Shall be holt the
a, No pit depth in greater than half wall thickness ‘4? seq sireof
excluding C.A.
b. Total pit arexdoes not exceed 7 square inches (refer Cede tor
within 8 inch diameter circle Cosredt Gate mert)
¢. Total sum along any line in circle does not
exceed 2 inches
For surface remote from weld, (weld E < 1), shell
thickness can be recalculated with E = 1. Shell area is
considered remote from weid if it lies on either side weld
beyond 1” or 2 times thickness (whichever Is greater).
For dished Heads, the Crown portion lies within circle
concentric to dish infer ci. = 0.8 x shell dia
With
For Ellipsoldal or Torispherical heads, crown portion thickness
can be recalculated considering crown as part of sphere of radius
equal to D, (for std, Torispherical) or Ki D (for Ellipsoidai).
For ellipsoidal head Ki depends on D/2h ratio (h=head
depth) For 2:1 Ellipsoidal Head, K1 = 0.9ANNE
API 510 PREPARATORY COURSE
Points To Recall - Day 6
1. Frequency of inspection:
a. External visual: 5 years or same as internal
(or on-s@am) inspection, use smaller duration
b. Internal / on-stream: Smaller of half remaining
life or 10 years, but if remaining life is < 4
years full remaining life up to max. of 2 years.
¢. For non-continuous service - external same as
(a) above but internal will be after 10 years of
actual exposed life for non corrosive, where as
for corrosive it will be smailer of half remaining
life or 10 years,
2. — Remaining life = Remaining C.A / Corrosion rate
Corrosion rate = metal loss over a period
period oF metal Toss
3. Pressure test -
Test at temp above MDMT + 30°F (thickness># 2”)
MDMT + 109F (thickness < 2”)
Perform Pneumatic test, if hydro is impractical
4. Inspection records shall have Devoe of information
a. Design & Construction (permanent) records —~
b. Running (progressive) inspection records “
c. Repair and alteration (modification) records
a Fitness for Service araly sis
\Snert ed RBI wilt be inducted5. For Vessels whose material is not known, MAWP can be
calculated assuming Stess value for A 285 Gr. C material
and Joint Efficiency equal to0.7. 283
6. Pressure relieving devices: Inspection interval not to
exceed 5 years normally but for clean non-corrosive
service may be 10 years.
7. Authorization for repairs/alteration of vessels constructed
as per:
a. ASME Sec. VII, Div. 1: Repairs — API
inspector
b. Alterations — API inspector and P.V.
Engineer
c. Sec. VII, Div. 2: Repairs & Alterations —
API inspector & P.V. Engineer
8. If PWHT Is impracticable, materials under P No. 4 (gr 1,
2, 3) and P No. (gr 1, 2) shall be repair welded as
follows (If impact testing is not required).
a. Preheat to 30P°degrees F for a distance 4”
or Mt on either side of groove (t = weld
metal thickness)
b. Welding process shall be SMAW, GMAW, or
eae
G Control interpass temperature not to exceed
600 degrees F10.
in.
12.
13.
14.
If impact testing is required and PWHT is impracticable,
the materials under P No. 1, 3, 4 shall be welded as
follows:
a. Adopt SMAW/GMAW/GTAW process — with
temper bead $Phaif bead technique
b. — Requalify the procedures as per table 7-1 o-f API-S10
€. Use low Hydrogen Electrodes. Carry out Sith eee et
Hydrogen bake out treatment if required
(Electrodes designation > H4)
For all other materials other than 8 and 9 above, PWHT
shall be carried out after repair if it was carried out
originally as per code of construction.
The welding area of weld preparation before welding, and
the completed weld shall be checked by PT or MT.
Pressure test is required after repair/alterations, if
Authorised Inspector thinks it necessary. Pressure Test
is normally requiéd after Alteration and Major Repairs.
Insert patches must be with full penetration welds. Fillet —Ee0hs
patches shall be approved by P.V. Engineer. Normally a
fillet patch equivalent to reinforced openi ing. is okay.
Re-rating calculations shall be done by Pressure Vessel
Engineer, and New Stamping or New Name plate
showing Rerating ( New MAWP , temp, ) shall be
attached to vessel.
eeAPI 510 PREPARATORY COURSE
Points To Recall - Day 7
Procedure qualifications give suitability of weld for required
mechanical properties (i.e., strength, ductility), while Performance
qualifications show ability of the welder to make sound weld.
Tension test gives Tensil Value, while bend test shows ductility and
soundness. Radiography also indicates soundness.
Thus, Proc. Qual.: Tension test + Bend test
Perf. Qual.
: Bend test or Radiography
Tensile test for procedure qualification is passed if failure is in:
a. Weld metal at strength>= Base metal SMTS or
b. Base metal at strength>= 95% of base metal SMTS.
Bend test crack shall not exceed 1/8” in any direction. Radiography
criteriaJare more strict than radiography for job.
feqnitjohn
P - Numbers represent parent metal classification of similar
composition and properties, i.e., similar strength and ductility.
F - numbers give similar usability aspects of filler material.
A - numbers give similar chem. comp. In “As welded” condition.10.
11.
12.
13
Essential variables (EV), if changed require new procedure wes
qualification. Non-essential variables (NEV) may be changed
without new procedure qualification. =
Supplementary essential variables (SEV) are considered as (EV)
only if there is impact strength requirement. Otherwise they are
“non-essential” variables.
EV and SEV are included in PQR document. EV,SEV and NEV are
included in WPS document.
PQR document gives data used in PQR test and test results, and
cannot be revised.
WPS gives parameters to be used in production job, and must be
within ranges qualified by the PQR test.
WPS may be revised within the EVs qualified. The NEVs can always
be revised without affecting validity of PQR.
For performance, 1G is flat, 2G is horizontal, 3G is vertical and 4G
in. Pipe 5G qualifies 1G,,3G and 4G, but pipe 6G
qualifies all positions.
is overhead posi
ASME Sec. V is NDT procedure/methods code and is applicable only
if it is referenced by the Reference code (Construction Code). The
extent of NDT and acceptance standards are stipulated in
Reference Code.14.
For RT (Art.2):
a. Backscatter Control:
Light image of 8 on dark background —Unacceptable
b. Density Limitations:
Min 1.8 for x Ray / 2.0 for G-Ray
Max 4.0 for x / G Ray
Density Variation = —-15 % to + 30%
Anat
Double wall viewing (DWDI)- —_up to 3.5" dia. O0
Penetrameter ( IQI ) Selection :
- As per Table T-276. Thickness includes weld
reinforcement, But not backing.
- Penetrameter should be placed on Source
side. Film side (with letter F) is permitted if
there Is no acess tplace IQI on source side
- At least one penetrameter image shall appear
on each film ( with 2T hole for Hole-type or
Designated wire for wire type)API 510 PREPARATORY COURSE
Points To Recall - Day 8
For PT (Art.6) :
a.
Control of Contaminants:
Sulphur or (chlorine+ fluorine) shall not exceed 1%
Standard procedures(penetrant time,Developing time
etc.) are applicable for temp. range 10 °C to 52 °C,.
New procedure shall be qualified for outside this range.
Penetrants are Colur(visible) type and Fluoroscent type.
Each of these have 3 types of penetrants
Water Washable, Post Emulsifying, Solvent Removable.
PE type may be - Lipopholic, Hydro-pholic,
Penetration Time, Developing time, Table T-672
Final interpretation within 7 to 60 minutes.
For MT ( Art.7):
a. Yoke Type: Electromagnet or Permanent Magnet.
Suitable for Surface defects.
b. Prod Type: Electro-magnet wear’
Suitable for Surface/ Sw-surface Defects
c. Examination Medium: Dry powder or Wet Powder
Dry Powder Suitable for higher temperatures.
d. For Electromagnets: Equipment Ammeters shall be
checked anually with a Master Ammeter. 3 Readings
to be taken and should be within +- 10% of full scale.
e. Lifting Power of Yokes
+ AC shall have lifting power of at least 4.5 Kg /folbs
+ OC shall have lifting power of at least 18.1 K9 /40 lox
= Weight too shall be checked prior to first use
f. Min. two examinations on each area, the second is
perpendicular to first
g. Prod Spacing - Not exceed 8” and not less than 3"3. SE-797UT Measurement:
a. Pulse- Echo method can be adopted up to 200 deg. F.
Not suitable on Coarse-Grain Castings.
b. Apparatus : - 3 types ~ CRT read out
- CRT + direct read out
- Direct thickness read out
c. Search Units: 3 types
- Straight beam contact type
- Delay line type. (delay block to minimize dead
zone). Suitable for Low thickness
- Dual element type. (two crystals in one unit).
Low roof angle used for higher thickness range and
vice-versa. Low thicknesses measurements require
Vee-error correction.
d. High thickness measurement:
Use of multiple echo is made by using thinner
calibration block. The second last back-echo coinsides to
zero, the last echo to the end of screen,the screen is
thus calibrated to thickness of the calibration block.
e. While taking measurement for high temperature
condition a positive error of 1% per 55 deg C (100 deg F)
will results. Hence temperature correction is necessary.
f. CRT read out is recommended when reflecting surface is
corroded or rough . sels
4. Acceptance Criteria is to be applied to indications and not
actual size of discontinuity.
5. Spot radiography of Pressure vessels (as per ASME Sec. VIII
Div.1) is 1% .(1 spot of Ginches per 5Oft) If the spots in spot
radiography are ok complete weldlength represented by that
weld is accepted. For every unaccepted spot, take 2 more
spots. Both additional spots shall be ok. Otherwise reject weld
6. UT is permitted only if RT cannot be performed on the
closing weld. PT shall be done for MT only if MT cannot be
done (i.e. non magnetic material)
®7. API 576 provides practical guidelines to meet API 510
requirements for pressure relieving devices. (PRDs) It does not
cover training requirements
8. Inspection of PRDs is essential for :
a. protection of equipments and safety of personnel,
b. to determine condition of device itselfzaae-
9. __ Inspection frequency
a. Inspection and shop maintenance - normal
frequency Is 5 years (max) but may be up to 10
years for clean, non-corrosive, non-fouling medium
b. Visual on-line survey — 5 years max
10. Safety valve is pop-opening valije, used on gases and vapors.
Relief valve is “proportional opening” valve used on liquids.
Safety relief valves can function both ways , Back-pressure
correction is done on balanced safety relief valves ,
11. After the valve is removed from service, first action is to
check its relieving pressure (pop pressure) in the “as received”
condition. Subsequently, carry out detailed visual examination,
dismantling, cleaning, and lapping of valve seat. Set the pop at
desired pressure and confirm the same at least once. Carry out
leak test.
12. Leak test is carried out (at 90% of relieving pressure) by
monitoring air bubbles appearing per minute under head of ¥2"
and comparing with acceptance chart.API 510 PREPARATORY COURSE
Points To Recall - Day 9 & 10
The chloride salts in Crude, in the presence of water (or during
steam stripping) produces HCI acid which can attack the steel and
in presence of H2S, the HCI is regenerated continuing the
corrosion of steel equipments
Fe+2HCl --> FeCl2+ 2H.
FeCl: + 4@24,S--> lq 2HcI OLS ete.
‘Atomic Hydrogen can cause Hydrogen Induced Cracking (HIC) and
Hydrogen Blistering (HB) At high temp (> 800 degrees F) In 2
addition to HIC and HB, the steel becomes spongy as Methane gas
formation takes place by combining Hydrogen with free Carbon
which is coming from decomposition of Cementite.
2S will cause RBIBnd §ildue to formation of Atomic Hydrogen
during sulphide corrosion of steel (Fe + H2S --> FeS + @# and
H:S also SENERRONE in Cf above.
Erosion is caused due to high velocity flow of solid suspensions in
liquids and gases or liquid suspensions in gases. R.O.E. varies as
Cube of velocity.
Inte lal if of aan SS. is ed di te
Intergranular corrosion S. is caus jue to
it
Chromium carbide precipi 1a aeiapeiniibltisise cc2 the
areas close to grain boundries stainiesS
Ay 12.7,
Vessel inspections are for The safety, continuity, reliability.
Graphitization in Carbon Steels takes place due to prolonged
exposure in 825 to 1400 deg. F ae in decomposition
of Steel into Ferrite Crystals and /Graphite Nodules. In-situ
Metallography is used to detect the Graphitization
External inspection of Pr. Vessels and Exchangers should start
with ladders, platforms, stairways connected to or bearing on
vessel.
External surfaces of vessels shall be examined for not only for
corrosion but also for leaks, cracks, buckles, etc.
L
g2sF10.
1.
12.
13.
18.
19.
20.
21.
If any settling is seen on vessel, nozzles and adjacent shell area
shall be inspected for distortion and cracking.
Hammer test shail be followed by suitable NDT.
Grounding connection resistance shall not exceed 25 ohms but 5
ohms is normally preferred.
In presence of acidic co rodents (PH < 7) hydrogen blistering is
expected above and below (close to) liquid level.
Auxiliary equipments ( Pr. gauges, sight glass, safety vaives etc.
may be visually inspected while in service. Undue vibrations shall
be arrested by providing additional supports or qualified
engineer should determine if these could lead to fatigue failure.
First step for Internal inspection Is review of previous records.
For Heavy wall vessels at high pressure, major concern is crack
damage particularly at the welds ( Weld & HAZ)
0 ce idic PLAC) hydros istering ts
a {close to) liquid Yeuef.
Laminations run siant while cracks run normal to surface.
‘Spark testing is effective method for breaks/leaks in paint, glass,
plastic and rubber lining.
UT is the primary means of obtaining thickness measurements.
Other methods like profile radiography, Step-wedge comparison
radiographs, Corrosion buttons, test holes and depth drilling are
some other methods tetl tale
pH = 7 represents Neutral fluid . pH > 7 indicates Basic while
PH < 7 indicates Acidic fluid.
depth awl ns