B.L.D.E.

A’s
V.P.Dr.P.G.HALAKATTI COLLEGE OF ENGINEERING & TECHNOLOGY, BIJAPUR

Department of CIVIL Engineering


1st Internal Assessment Test

Subject : Construction Management and Entrepreneurship Year : 2017/18


Subject Code : 10CV61 Sem : 6th sem
Max. Marks : 30 Date: 15/03/2018 Div : A & B

Note: - Answer any one full question from each part


PART - A
1. a) Preparation of network diagram based on event and activity . 8 Marks
b) For the activity duration marked in figure calculate LST, LST, LFT, EFT, FT, Critical path
and project duration. 7
Marks

2. a) Definition, Nature and Characteristics of Management. 5 Marks


b) Write the concept of activity on arrow and activity on node network. 5 Marks
b) Write a note on Bar charts/Gantt charts. 5 Marks
PART – B
3. a) What are factors affecting labour productivity. (any twelve) 6 Marks
b) The project activities, precedence relationship and durations are prescribed in the table.
To find critical path and project duration. 9 Marks
Activity Precedence Duration in day
P ---- 3
Q ---- 4
R P 5
S Q 5
T R, S 7
U R, S 5
V T 2
W U 1

4. a) What are types of equipment’s used for compaction. (any three) 6 Marks
b) Estimate the hourly production in bulk volume of a backhoe with a bucket capacity 1 m3
employed on excavation of foundation five meters deep in hard digging soil. Excavated earth is
to be dump in loaded in waiting dump truck. Placed at a angle 90 degree. The backhoe is
actually performed 45 minutes per hour. 9 Marks
B.L.D.E.A’s
V.P.Dr.P.G.HALAKATTI COLLEGE OF ENGINEERING & TECHNOLOGY, BIJAPUR

Department of CIVIL Engineering


1st Internal Assessment Test

Subject : Construction Management and Entrepreneurship Year : 2017/18


Subject Code : 10CV61 Sem : 6th sem
Max. Marks : 30 Date: 15/03/2018 Div : A & B

Note: - Answer any one full question from each part


PART - A
1. a) Preparation of network diagram based on event and activity . 8 Marks
b) For the activity duration marked in figure calculate LST, LST, LFT, EFT, FT, Critical path
and project duration. 7
Marks

2. a) Definition, Nature and Characteristics of Management. 5 Marks


b) Write the concept of activity on arrow and activity on node network. 5 Marks
b) Write a note on Bar charts/Gantt charts. 5 Marks
PART – B
3. a) What are factors affecting labour productivity. (any twelve) 6 Marks
b) The project activities, precedence relationship and durations are prescribed in the table.
To find critical path and project duration. 9 Marks
Activity Precedence Duration in day
P ---- 3
Q ---- 4
R P 5
S Q 5
T R, S 7
U R, S 5
V T 2
W U 1

4. a) What are types of equipment’s used for compaction. (any three) 6 Marks
b) Estimate the hourly production in bulk volume of a backhoe with a bucket capacity 1 m3
employed on excavation of foundation five meters deep in hard digging soil. Excavated earth is
to be dump in loaded in waiting dump truck. Placed at a angle 90 degree. The backhoe is
actually performed 45 minutes per hour. 9 Marks