Operational Phase - Quality Management
Operational Phase - Quality Management
5.1
development, etc.
5.2
(c) empowered authority
and responsibility necessary and sufficient empowerment is an
efficient and effective management mechanism
to enable the Environmental Team to prevent,
correct and stop any unfavourable or unforeseen
environmental impacts; and
5.3
For a complete EMS, Project Proponent/Operator may refer to "A Simple Guide to Set
Up An EMS"” published by EPD and available from CEM Section , EPD, HK
Government; or, make reference to the comprehensive EMS prescribed in ISO 14000
series (International Organization for Standardization, Case Postale 56, CH-1211
Geneve 20, Switzerland).
.
The environmental protection conditions, including, all statutory limits for project
operation, all EIA/EA study recommendations and requirements, ACE conditions and any
endorsed public comments related to the operational phase of the development project shall
be clearly defined in the Operational Phase EM&A Manual. The various measures for
implementation by the Project Proponent/Operator shall be in a tabulated format for easy
reference (see attached checklist proforma, in the form of an Implementation Schedule at
Appendix E1).
The EIA/EA study is the means to document the prediction and assessment of a
project's environmental performances during, inter alia, its operational phase. It is vitally
important for the EIA/EA study to not only identify and quantify the predicted environmental
scenario arising from a projects implementation; but also to put forward the means and
mechanisms to forewarn, prevent, minimize and stop any potential adverse impact
throughout the duration of the project, by reference to a checklist of resource requirements.
On the basis of this information, the Project Proponent/Operator shall cost the environmental
protection items and provide the necessary and essential resources in a timely and efficient
manner. For projects which the Project Proponent might not be the project operator or there
is a transfer of ownership, it is the responsibility of the Project Proponent (originator) to
ensure continuity for the undertaking of environmental protection requirements as per Section
5.4.
5.6 Documentation
(NB. submit as part of the EIA/EA study and update as necessary 3 months prior to
5.4
the commissioning of project operation with the agreement of the Director of
Environmental Protection)
Table of Contents
Appendices
Table of Contents
5.5
(ii) Brief Project Background
(iii) Description of Site
(iv) Monitoring and Audit
- parameters undertaken;
- methodology and protocol;
- location, frequency and duration;
- approved laboratory analysis;
- instrumental calibration;
- monitoring result audit.
(v) Data Analysis and Presentation
(vi) Basis for Ambient Environmental Conditions and Action/Limit Levels
(vii) Revision of EM&A Manual
(viii) Conclusion and Observation
Appendices
(NB. submit within 10 working days subsequent to the reporting period. This
applies to monthly, quarterly and annually reports)
Table of Contents
5.6
- monitoring result audit.
(viii) Data Analysis and Presentation
(ix) Environmental Audit
(x) Recommended Mitigation Measures
(xi) Report on Non-compliance, Complaints, Notifications of Summon and
Successful Prosecutions
Appendices
5.7