DESIGN ASSUMPTION :
- WAVE HEIGHT : 4 M (BASED ON 100 YEARS R.P OPEN SEA WAVE AT JAMBI)
- WAVE RETURN PERIOD : 10 S
- SEA CURRENT VEL. : 1.5 M/S
- SEABED DEPTH : 17 M
- WAVE THEORY : AIRY WAVE THEORY
- SOIL CONDITION : SOFT CLAY (SOIL SPRING CONSTANT 8,140 KPA/M)
- DESIGN LIFE : 30 YEARS (ALLOWABLE STRESS IS 198 MPA → ABS WITH SF 3.0)
- DESIGN CODE : AISC 360, API WSD, DNV, ABS & SNI FOR SEISMIC REQUIREMENT
Page 1 of 4
CONCEPTUAL DESIGN OF PLEM STRUCTURE
(BASED ON DESIGN PIPING ARRANGEMENT)
SUMMARY OF DESIGN RESULTS OF STRUCTURE ELEMENT :
- MAX. STRENGTH RATIO : 0.852
- MAX. BEAM STRESS : 134.26 MPA < 198 MPA (OK)
- MAX. PLATE STRESS : - PRINCIPAL STRESS = 7.991 MPA (SHEAR & BENDING)
- VON MIS STRESS = 7.233 MPA (DISTORTION)
Max Top
(Principal Major Stress)
Stress)
N/ mm2
<= 0.155
0.645
1.13
1.62
2.11
2.6
3.09
3.58
4.07
4.56
5.05
5.54
6.03
6.52
7.01
7.5
>= 7.99
Y
X
Z
Load 1087
MAXIMUM PRINCIPAL STRESS OF STEEL PLATE (7.991 MPA< 198 MPA (OK))
Y
X
Z
Load 1087
MAXIMUM VON MIS STRESS OF STEEL PLATE (7.233 MPA < 198 MPA (OK))
Page 2 of 4
CONCEPTUAL DESIGN OF PLEM STRUCTURE
(BASED ON DESIGN PIPING ARRANGEMENT)
- MAX. PILE FORCE : - BEARING FORCE = 19.689 TON
- TENSION FORCE = 0 TON
- LATERAL FORCE = 2.570 TON
- MAX. DISPLACEMENT : - VERTICAL DISPL. = 19.697 MM
- LATERAL DISPL. = 17.917 MM
- MAX. WEIGHT : ≈ 38.97 TON
Page 3 of 4
CONCEPTUAL DESIGN OF PLEM STRUCTURE
(BASED ON DESIGN PIPING ARRANGEMENT)
SUMMARY OF DESIGN RESULTS OF PIPE ELEMENT (3 MM INTERNAL CORROSION ALLOWANCE) :
- MAX. PIPE STRESS : - 12” PIPE = 72.822 MPA < 198 MPA (OK)
All actual combined stress of the pipe have been below the allowable combined stress as per
ASME B31.4 Sect. A402.3.5 (322.67 MPa)