Professional Documents
Culture Documents
Method Statement Pressure Grouting
Method Statement Pressure Grouting
Method Statement Pressure Grouting
METHOD STATEMENT
FOR PRESSURE GROUTING TO COLUMN/WALL GAP
2. Concrete Surface should be clean, sand and free from dust, loose
particles, cement laitance, oil, grease or any other contamination.
5. Install ∅50mm grout pipe inlet hose between column/wall gaps (1.5m
interval)
8. Pump-in the grout through grout pipe working from bottom upwards by using
grout pump. When grout overflows from the next higher in-let ports ,
seal off the first in-let port and transfer the grouting to the next
higher port .repeated the process until the grout has over-flown from
the highest breathing port .the grouting pressure is expected to be
between 10-20 p.s.i.(use hand pump to hold this pressure for at least 2
minutes)
9. The grouting port shall be capped when the grouting materials begin to
flow out from the highest port
10. Leaving the grouted areas to cure and remove formwork after a minimum of
24 hours.
11. Inspection by consultant after formwork removed.
Note: the method of statement is subject to change due to the access and site
condition
Base 1 Slab
500mm thk
Formwork
Outlet Hose
Inlet Hose to be connected
With grout pump
Column
Base2 Slab