Formwork Checklist

Location: Area: I.T.P No: Sheet No:

Contractor: Hookmally Ali Limited Contract: TMD Project/EPC

Section: Element:

Checklist Items S/C HAL MHI Owner

1) Shuttering material adequate to produce specified finish.

2) All necessary gridlines and datums marked.

3) Line and level of kickers checked.

4) Thickness and grade of plywood and grade of backing


timbers approved.
5) Precautions taken to prevent uplift.

6) All wedges driven tight.

7) Joints grout tight.

8) Special joints and water bars are as detailed.

9) Stop ends fixed.

10) Position of all box outs and built in items.

11) Box out and built in items securely fixed.

12) Final check of formwork line and level to be undertaken prior


to concreting.

For and on Behalf of Hookmally Ali Limited For and on behalf of Mitsubishi Heavy Industries
Accepted Not Accepted Accepted Not Accepted

Signed Signed

Print Name Date Print Name Date