Pittsburgh Light Rail Project North Shore Connector Overview Contracts 003 and 006 Tunnels and Station Shell

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Zick, P.

Pittsburgh Light Rail Project North Shore Connector Overview Contracts 003 and 006 Tunnels and Station Shell. 2008
Tunnelling Association of Canada Proceedings.

Pittsburgh Light Rail Project North Shore Connector Overview Contracts 003 and 006 Tunnels
and Station Shell

Paul Zick PE
Project Director
North Shore Constructors
Obayashi/Trumbull JV
503 Martindale
Pittsburgh, PA 15212

412-246-0325
paulz@obayashi-usa.com

Abstract:

The Port Authority of Allegheny County is extending its current light rail system from the Pittsburgh
downtown business district to the sports stadiums on the North Shore of the Allegheny River. A main
feature of the expansion is construction of twin 20 foot inside diameter precast segmental lined tunnels.
The tunnels are being constructed under the Allegheny River using a Slurry TBM. Tight site restrictions
required the tunnels to be constructed with an 8% grade. This paper will address some of the
project's construction challenges.

Keywords: urban environment; Allegheny River; Stanwix Street; 10th Street Bypass; support of
excavation; cement Bentonite; underpinning; precast segments; double chamber man lock; hydraulic jaw
crusher.