ESTIMASI REKAPITULASI ANGGARAN SEMENTARA

PROYEK : PEMBANGUNAN KLINIK PRATAMA UKP RAWAT INAP


LOKASI : JAWA BARAT, JAWA TIMUR DAN JAWA TENGAH
PEKERJAAN : ARSITEK, STRUKTUR, MEKANIKAL ELEKTRIKAL TERMASUK FASILITAS DAN SARANA PENUNJANGNYA
PENGADAAN DAN PENGEMBANGAN SDM

TOTAL PEKERJAAN
No. ITEM PEKERJAAN
(Rp.)

A REKAPITULASI
I. BANGUNAN GEDUNG KLINIK 9.634.447.870,48

II. PARKIR DAN PAGAR GEDUNG 970.824.935,47

III. PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING (MEP) 664.591.235,60

IV. PEKERJAAN PENDINGIN UDARA / AC 924.384.000,00

V. PEKERJAAN TELEPHONE / FAX/IT 519.442.800,00

VI. PEKERJAAN BANGUNAN IPAL 334.530.000,00

VII. PENGADAAN GENERATOR DAN INSTALASINYA 353.310.000,00

VIII. PENYAMBUNGAN PLN 223.020.000,00

IX. PENGADAAN KENDARAAN OPERASIONAL 1.375.000.000,00

X PENGADAAN SEPEDA MOTOR 150.000.000,00

XII. PENGADAAN AMBULAN 854.910.000,00

XIII. PENGADAAN FURNITURE 1.077.930.000,00

XIV PENGADAAN ALAT KESEHATAN 3.500.000.000,00

XV PENGADAAN RUMAH DOKTER 5 Unit 2.494.700.000,00

XVI KONSULTAN PERENCANAAN 482.507.000,00

XVII KONSULTAN PENGAWASAN 356.828.000,00

XVIII PENGEMBANGAN SDM 7.750.000.000,00

SUB TOTAL 31.666.425.841,55

PPN 10 % 3.166.642.584,15

GRAND TOTAL 34.833.068.425,70

DIBULATKAN 34.833.068.000,00

Terbilang : Tiga puluh empat milyar delapan ratus tiga puluh tiga juta enam puluh delapan ribu rupiah