B. Tech Civil Engineering (Iv Semester) Estimation Costing & Valuation CE1402 Tutorial Sheet No-1B

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

B.

TECH CIVIL ENGINEERING (IV SEMESTER)


ESTIMATION COSTING & VALUATION
CE1402
Tutorial Sheet No-1B

1. Draw a primary estimate of a building for 200 persons by


given details –plinth area rate Rs 1100 sq.m ,carpet area per
person =1.10 sq m, water rate 5 %,sanitation 6%,,
electrification 10 %, work charge establishment 5%,
contingency 2.5%.
2. Prepare a preliminary estimate of a multistory office
building having a carpet area of 2200 sq.m .35 % of the
built-up area will be taken up by corridors , verandahs ,
lavatories, staircases etc. And 1% of built-up area will be
occupied by walls. Assume plinth area rate to be Rs
2500/sq.m. Provide for water supply, sanitary fittings,
electrical installations, contingencies and other services.
(Water supply+ sanitary fittings+ electrical installations
=15%), (Contingencies and other services=10%)
3. Estimate the quantity of the following items of a two roomed
building from the given plan and section. Below plinth level
for .20m partition wall all data remain same. (Fig1)
a) Earthwork in excavation in foundation
b) Lime concrete in foundation
c) 1st class brick work in cement mortar (1:4) in
foundation and plinth
d) 2.5 cm cement concrete in DPC
e) 1st class brick work in cement mortar (1:6) in super
structure

Fig 1

B. TECH CIVIL ENGINEERING (IV SEMESTER)


ESTIMATION COSTING & VALUATION
CE1402
Tutorial Sheet No-1B

4. Draw a primary estimate of a building for 200 persons by


given details –plinth area rate Rs 1100 sq.m ,carpet area per
person =1.10 sq m, water rate 5 %,sanitation 6%,,
electrification 10 %, work charge establishment 5%,
contingency 2.5%.
5. Prepare a preliminary estimate of a multistory office
building having a carpet area of 2200 sq.m .35 % of the
built-up area will be taken up by corridors , verandahs ,
lavatories, staircases etc. And 1% of built-up area will be
occupied by walls. Assume plinth area rate to be Rs
2500/sq.m. Provide for water supply, sanitary fittings,
electrical installations, contingencies and other services.
(Water supply+ sanitary fittings+ electrical installations
=15%), (Contingencies and other services=10%)
6. Estimate the quantity of the following items of a two roomed
building from the given plan and section. Below plinth level
for .20m partition wall all data remain same. (Fig1)
f) Earthwork in excavation in foundation
g) Lime concrete in foundation
h) 1st class brick work in cement mortar (1:4) in
foundation and plinth
i) 2.5 cm cement concrete in DPC
j) 1st class brick work in cement mortar (1:6) in super
structure

Fig 1