The document lists 13 road improvement projects in Bali Province, Indonesia. It provides information on the project name, contract value, completion date, contractor, and technical specifications. It also includes tables with standard material specifications for aggregates and fillers used in road construction. The projects involve improving roads in various districts across Bali through widening, drainage and resurfacing works carried out by contractors between 2012-2013.
The document lists 13 road improvement projects in Bali Province, Indonesia. It provides information on the project name, contract value, completion date, contractor, and technical specifications. It also includes tables with standard material specifications for aggregates and fillers used in road construction. The projects involve improving roads in various districts across Bali through widening, drainage and resurfacing works carried out by contractors between 2012-2013.
The document lists 13 road improvement projects in Bali Province, Indonesia. It provides information on the project name, contract value, completion date, contractor, and technical specifications. It also includes tables with standard material specifications for aggregates and fillers used in road construction. The projects involve improving roads in various districts across Bali through widening, drainage and resurfacing works carried out by contractors between 2012-2013.
1 Peningkatan Jalan Carangsari - Br. Sangut, 2.080 18 April 2012
Lingkar Samuan - Carangsari, Carangsari K A = 6.2 dan Senapan - Anggunan di Kec. Petang ACBC
2 Peningkatan Jalan Kapal - Gaji di Kec. 2.165 23 MEI 2013
Kuta Utara PT.SINARBALI BINAKARYA K A = 6.3 ACBC
3 Peningkatan Jalan Pura Kulat di Kec. Kuta 2.165 19-Apr-12
Selatan PT. DHARMA NIAGA KARYA K A = 6.2 ACBC
4 Peningkatan Jalan Carangsari - Br. Sangut, 2.090 18 APRIL 2012
Lingkar Samuan - Carangsari, Carangsari dan Senapan - Anggunan di Kec. Petang K A = 6.3 PT. BAYU SEJATI ADI MANUNGGAL ACWC
5 PENINGKATAN JALAN KAPAL - GAJI 2.170 23 MEI 2013
DI KECAMATAN KUTA UTARA PT. SINARBALI BINAKARYA K A = 6.4 ACWC
6 Peningkatan Jalan dan Drainase Basangkase - 2.16125 Agustus 2013
Petitenget Kec. KUTA UTARA PT. TRIJAYA NASIONAL K A = 6.3 ACWC
7 Peningkatan Jalan Plaga - Tiyingan Kec. 2.162 13 JUNI 2013
Petang PT. PRAMANA ARTHA RAHARJA K A = 6.3 ACWC
8 Peningkatan Jalan Sibang Gede Angantaka 2.107 24 April 2013
Kecamatan Abiansemal PT. WANGUN JAYA K A = 6.3 ACBC 9 Peningkatan Jalan Tanah Ayu Blumbungan 2.088 13 Mei 2013 Kec. Abiansemal PT. ADI MURTI K A = 6.3 ACBC
10 Peningkatan Jalan Sibang Gede Angantaka 2.111
Kecamatan Abiansemal PT. WANGUN JAYA K A = 6.5 ACWC
11 Peningkatan Jalan Tanah Ayu Blumbungan 2.106 13 Mei 2013
Kec. Abiansemal PT. ADI MURTI K A = 6.5 ACWC
12 Peningkatan Jalan Darmasaba-Gerih 2.164 6 MEI 2013
Kec. Abiansemal PT. SANUR JAYA UTAMA K A = 6.2 ACBC
13 Peningkatan Jalan Darmasaba-Gerih 2.161 6 Mei 2013
Kecamatan Kuta Abiansemal PT. SANUR JAYA UTAMA K A = 6.3 ACWC GA KAB. BALI
b, II Medium Agg( 5- 10mm ) 2.382 2.489 c, III Coarse Agg( 15 - 25mm ) 2.415 2.571 d, FILLER SEMEN 2.404 2.518
a, I ABU BATU ( 0-5mm ) 2.433 2.548
b, II Medium Agg( 5- 10mm ) 2.409 2.519 c, III Coarse Agg( 10 - 15mm ) 2.377 2.496 d, IV Coarse Agg( 15 - 22mm ) 2.354 2.470 e, FILLER SEMEN 2.464 2.585
a, I ABU BATU ( 0-5mm ) 2.275 2.354
b, II Medium Agg( 5- 10mm ) 2.317 2.416 c, III Coarse Agg( 10 - 15mm ) 2.348 2.461 d, IV Coarse Agg ( 15 - 25mm ) 2.296 2.402 FILLER SEMEN 2.464 2.585
a, I ABU BATU ( 0-5mm ) 2.412 2.498
b, II Medium Agg( 5- 10mm ) 2.382 2.489 c, III Coarse Agg( 10 - 15mm ) 2.433 2.554 FILLER SEMEN 2.404 2.518
a, I ABU BATU ( 0-5mm ) 2.428 2.542
b, II Medium Agg( 5- 10mm ) 2.406 2.516 c, III Coarse Agg( 10 - 15mm ) 2.381 2.497 FILLER SEMEN 2.464 2.585
a, I ABU BATU ( 0-5mm ) 2.415 2.502
b, II Medium Agg( 5- 10mm ) 2.382 2.489 c, III Coarse Agg( 10 - 15mm ) 2.433 2.554 FILLER SEMEN 2.464 2.585
a. Batu Pecah ( 1" ) 2.305 2.407
b. Batu Pecah Medium (1/2") 2.315 2.434 c. Abu batu 2.330 2.457 d. Filler Semen a. Batu Pecah ( 1" ) 2.303 2.422 b. Batu Pecah Medium (1/2") 2.310 2.427 c, I ABU BATU ( 0-5mm ) 2.292 2.405 FILLER SEMEN
a. Batu Pecah (3/4") 2.309 2.420
b. Batu Pecah Medium (1/2") 2.315 2.434 c. Abu batu 2.330 2.457 d. Filler Semen
a. Batu Pecah (3/4") 2.309 2.420
b. Batu Pecah Medium (1/2") 2.315 2.434 c. Abu batu 2.330 2.457 d. Semen
I. ABU BATU ( 0-5mm ) 2.486 2.627
II. Medium Agg( 5- 10mm ) 2.317 2.450 III. Coarse Agg( 10 - 15mm ) 2.348 2.483 IV. Filer Semen 2.404 2.518
a, I ABU BATU ( 0-5mm ) 2.428 2.542
b, II Medium Agg( 5- 10mm ) 2.406 2.516 c, III Coarse Agg( 10 - 15mm ) 2.381 2.497 FILLER SEMEN 2.464 2.585