Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Laporan Rincian Kerja Bulanan

Displai Obyek Nama Pelanggan Model Tipe Serial No.

01/04/2018 ~ 15/04/2018 Mr. PAESA PASINDO ENGINEERIN PC200 8 C71732

tidak Jam
Jam Jam
Jam beroperas i Kerja Jam Jam
Date Peta Operasi SMR (H) Digging Perjalan
Kerja(H) (engine Aktual Hoist (H) ATT(H)
(H) an(H)
hidup)(H) (H)
01/04/18 5.4 2804.1 0.8 4.6 1.3 0.5 1.1 0.0
02/04/18 8.7 2812.8 1.1 7.6 2.5 1.2 1.1 0.0
03/04/18 16.6 2830.4 2.9 13.6 4.8 2.2 1.5 0.0
04/04/18 17.5 2848.4 2.7 14.8 5.3 2.4 2.2 0.0
05/04/18 17.7 2864.9 3.9 13.8 4.9 1.9 1.9 0.0
06/04/18 13.4 2878.4 3.0 10.4 2.9 1.3 2.1 0.0
07/04/18 - - - - - - - - -
08/04/18 - - - - - - - - -
09/04/18 - - - - - - - - -
10/04/18 - - - - - - - - -
11/04/18 - - - - - - - - -
12/04/18 - - - - - - - - -
13/04/18 - - - - - - - - -
14/04/18 - - - - - - - - -
15/04/18 - - - - - - - - -

Waktu Total - 79.7 - 14.6 65.0 22.0 9.9 10.2 0.0

Data bahan bakar yang tertera adalah nilai-nilai referensi. Kemungkinan ada perbedaan dengan jumlah sebenarnya karena kondisi pengerjaan (bahan bakar, cuaca, pengerjaan, dan lain sebagainya)
* There can be difference between total and sum of each shown data because of truncation.

Nama Perusahaan Nama


PT. United Tractors PAESA PASINDO ENGINEERIN
ulanan
Nomor mesin
No. Kontrol SMR Terahir
pelanggan
PEX-06 2878.4 H

Kerja Pemakaia Dari


Jam Jam
Jam pada n Bahan Konsumsi
Breaker Lampu
Relief(H) pilihan bakar Bahan
(H) ECO(H)
Ekonomi (L/H) Bakar(L)
0.0 0.0 5.0 0.6 20.4 110.0
0.0 0.0 8.0 0.7 21.3 185.5
0.0 0.1 16.2 5.0 18.6 308.7
0.0 0.1 17.0 8.9 17.9 314.0
0.0 0.0 16.9 8.7 17.3 307.0
0.0 0.0 12.7 6.2 17.3 232.2
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

0.0 0.5 76.1 30.3 18.3 1457.5

aca, pengerjaan, dan lain sebagainya)

Alamat yang dapat dihubungi

You might also like