Professional Documents
Culture Documents
Item 1: Turning Circles: 1.0 Location
Item 1: Turning Circles: 1.0 Location
1.0 Location
Gate No 2, adjacent to refuse shed.
1.1 Description
It was observed during early days of operation that trucks are failing to turn at the
junction of Road 2 and the Access Road therefore the turning radius was deemed
insufficient.
1.2 Recommendation
Increasing the turning radius to 10m.
1.3 Procedure of work to be done
Demolishing a part of the boundary wall (wall between two adjacent brick columns
close to the junction).
Removal of the existing Kerbing on the curve.
Clearing the area that will be part of the road.
Construction of 2 base layers.
Laying of hollow mountable kerbing.
Asphalt surfacing.
2.0 Location
Junction of road No2 and road No 5 (Supermarket entrance).
2.1 Description
It was observed during early days of operation that trucks are failing to turn at the
junction of Road 2 and Road 5 therefore the turning radius was deemed insufficient.
2.2 Recommendation
Increasing the size of the turning circle. Taking off part of the island opposite the
supermarket entrance to allow for the expansion.
4.0 Location
Access road perpendicular to Bulawayo road.
4.1 Description
Road pavement affected by groundwater ingress.
4.2 Recommendation
Drainage.
4.3 Procedure of work to be done
Construction of a Vee Drain along the access road, on the western side of the road
that will discharge to the outfall area.