Bidder should prepare and submit method statement for all types of pipes. Including excavtion method,
trench preparation method, pipe welding method, inside/outside corrosion protection for welding seams
(steel pipelines), pipe laying method, backfill method, quality control process, method of crossing of
canyons (if necessary) and etc.
Method of Statement for DN 1016 pipe laying
Bidder Signature___________________________
Method of Statement for DN 711 pipe laying
Bidder Signature___________________________
Method of Statement for DN 530 pipe laying
Bidder Signature___________________________
HDPE Pipe DN315 PN10
Bidder Signature___________________________
HDPE Pipe DN450 PN10
Bidder Signature___________________________
WELLS FOR VALVE UNDERGROUND
Name
Position
Date
Sign
Bidder Signature___________________________