OHT 56 RT Concrete Pouring On
OHT 56 RT Concrete Pouring On
Calculation:
Shaft diameter 6’, hole wide 19.5” (1.625’), depth 29.5” (2.45’)
Actual pouring 2 half bucket (1.5cy), waste from bucket was less than 1 cy.
The final concrete volume used is very close enough to the theoretical volume.
Contractor used the compressed air gun to clean the hole, and picture shown what it looks after
cleaning. Picture shown the acceptance cleanness.
Contractor used Gar-Bro Equipment Mod 440P Concrete bucket, (1.5cu yard volume), bring down the
concrete from a high land,