Tabel Programming Ruang BLK

sifat ruang Area Nama Ruang Sirkulasi Ukuran Standar Jmlh Ukuran total
R. Kepala BLK 40% 117 1 163.8
R. Kepala TU 40% 25 1 35
R. Kepala seksi 40% 25 1 35
R. Staf 40% 70 1 98
Publik Kantor BLK R. Instruktur 40% 100 1 140
R. Aula 40% 500 1 700
R. Rapat 40% 20 1 28
R. Tamu 40% 49 1 68.6
Km / Wc 40% 12 2 33.6
Total Luasan Kantor BLK 1302
Kamar Peserta 40% 24 25 840
Kantin 40% 12 2 33.6
Semi Privat Asrama
Lobby 40% 114 1 159.6
Km / Wc 40% 12 4 67.2
Total Luasan Asrama putra 1100.4
Kamar Peserta 40% 24 50 1680
Kantin 40% 12 2 33.6
Semi Privat Asrama
Lobby 40% 114 1 159.6
Km / Wc 40% 12 6 100.8
Total Luasan Asrama Putri 1974
R. Baca 40% 20 2 56
R. Administrasi 40% 5 1 7
Publik Perpustakaan
Km / Wc 40% 12 2 33.6
R. Buku 40% 56 1 78.4
Total Luasan Perpustakaan 175
Gudang Bahan 40% 100 1 140
Privat Penyimpanan Gudang Peralatan 40% 100 1 140
R. Administrasi 40% 5 1 7
Lobby 40% 50 1 70
Total Luasan Penyimpanan 357
Kantin 40% 12 20 336
Publik Istirahat Gazebo 40% 12 20 336
R. Makan 40% 3 80 336
Total Luasan Istirahat 1008
R. Sholat 40% 350 1 490
Publik Masjid
R. Wudhu dan WC 40% 100 2 280
Total Ruang Masjid 450
R. Teori 40% 50 1 70
Workshop R. Praktek 40% 150 1 210
Semi Publik Tatabusana R. Alat 40% 80 1 112
Km / Wc 40% 12 2 33.6
Total Luasan Workshop Tata Busana 0
R. Pameran 40% 840 1 1176
Lobby 40% 100 1 140
Publik Pameran Km / Wc 40% 20 2 56
Administrasi 40% 10 1 14
Satpam 40% 12 1 16.8
Total Ruang Pameran 1402.8
R. Teori 40% 50 3 210
R. Komputer 40% 150 3 630
R. Alat / Gudang 40% 16 3 67.2
Workshop Tata Kantor 40% 80 2 224
Semi Publik Niaga Lobby 40% 30 1 42
R. Satpam 40% 12 1 16.8
R. Parkir 40% 200 1 280
Km / Wc 40% 12 2 33.6
Total Luasan Workshop Tata Niaga 1503.6 501.2 1002.4
R. Teori 40% 50 4 280
ruang praktik pola 40% 80 2 224 4m2 x 20
ruang praktik menjahit manual 40% 80 2 224 4m2 x 20
ruang praktik menjahit masinal 40% 80 2 224 4m2 x 20
ruang praktik peragaan busana 40% 300 2 840 15m2 x 20
Workshop
Semi Publik Tatabusana
Workshop
Semi Publik ruang penyimpanan dan instruktur 40% 24 1 33.6 4m2 x 6
Tatabusana
Km / Wc 40% 12 6 100.8
Lobby 40% 30 1 42
R. Satpam 40% 12 1 16.8
R. Parkir 40% 200 1 280
R. Alat / Gudang 40% 16 3 67.2
Total Luasan Workshop Tata Busana 2332.4 777.46667 1554.9333
R. RAPAT 40% 49 1 68.6
R. Teori 40% 50 10 700
R. Praktik mini bar 40% 80 2 224
R. Praktik Tata Hidang 40% 60 2 168
R. Praktik Kue Basah 40% 320 1 448
R. Praktik Kue Kering 40% 320 1 448
R. Alat / Gudang 40% 16 4 89.6
WORKSHOP TATA Perpustakaan 40% 16 1 22.4
SEMI PUBLIK BOGA Gudang Bahan 40% 100 1 140
Gudang Barang Penghapusan 40% 50 1 70
Toilet/wc 40% 31 6 260.4
Kantin 40% 80 1 112
R. Instruktur 40% 70 1 98
R. Tamu 40% 20 1 28
Musholla 40% 16 3 67.2
R. Parkir 40% 270 1 378
Total Luasan Workshop Tata Boga 3322.2 1107.4 2214.8
Publik Olahraga Ruang Olahraga - 4000 1 4000
R. Koki 40% 60 1 84
R. Kue 40% 120 1 168
Toko Kue 40% 20 2 56
Semi Publik Café and Cake R. Santai 40% 200 1 280
R. masak 40% 120 1 168
R. Makan 40% 100 1 140
Teras 40% 50 1 70
Total Luasan Café and Cake
Semi Publik Aula Aula Sosialisasi 40% 250 2 700
TOTAL KESELURUHAN 20593
PEMBANGUNAN JALAN (7% x 7 Ha) 21000
TOTAL KESELURUHAN PEMBANGUNAN (1 lantai) 41593
TOTAL KESELURUHAN PEMBANGUNAN (Lantai Bertingkat) 36821
LUASAN BANGUNAN YANG DIIZINKAN (KDB 60% x 7 Ha) 42000