As Per Drawing Item Nos Description Unit Nos L W H Quantity
As Per Drawing Item Nos Description Unit Nos L W H Quantity
As Per Drawing Item Nos Description Unit Nos L W H Quantity
Total 1,939.57
DEDUCTION
W03 M2 3 4.00 3.10 37.20
W04 M2 3 3.00 3.10 27.90
D05 M2 2 2.00 2.20 8.80
D04 M3 1 2.00 2.20 4.40
Total 78.30
Grand total 1,861.27
ZONE-5
1 Through grid C and between 116-121 M2 1 10.07 3.24 32.63
2 Through grid C and between 133-136 M2 1 7.40 3.24 23.98
3 Through grid A and between 144-146 M2 1 5.67 2.40 13.60
4 Through grid B and between 144-146 M2 1 5.66 2.49 14.09
5 Through grid D and between 144-146 M2 1 8.27 2.49 20.59
6 Through grid F and between 134-136 M2 1 8.00 2.49 19.92
7 Through grid G and between 116-119 M2 1 10.06 2.49 25.05
8 Through grid G and between 117-119 M2 1 9.40 3.24 30.46
9 Through grid G and 127 M2 1 0.85 3.24 2.76
10 Through grid G and between 127-140 M2 1 37.80 4.40 166.32
M2 1 12.89 4.40 56.71
11 Through grid G and between 143-146 M2 1 4.93 4.40 21.69
12 Through grid H and between 127-130 M2 1 10.35 4.40 45.54
13 Through grid H and between 138-140 M2 1 13.70 4.40 60.28
14 Through grid J and between 129-133 M2 1 13.21 4.40 58.12
15 Through grid K and between 138-141 M2 1 12.70 4.40 55.89
16 Through grid K and between 128-132 M2 1 8.90 4.40 39.17
17 Through grid L and between 127-131 M2 1 10.48 4.40 46.13
18 Through grid M and between 127-129 M2 1 7.07 4.40 31.09
19 Through grid N and between 116-127 M2 1 28.29 4.40 124.47
20 Through grid W and between 116-127 M2 1 28.30 4.40 124.52
21 Through grid N and between 127-128 M2 1 3.94 4.40 17.34
22 Through grid Q and between 127-128 M2 1 5.13 4.40 22.58
23 Through grid W and between 127-132 M2 1 14.70 4.40 64.68
24 Through grid V and between 132-134 M2 1 2.05 4.40 9.00
25 Through grid P and between 139-141 M2 1 3.49 4.40 15.34
26 Through grid J and between 134-138 M2 1 23.63 4.40 103.97
27 through grid between 127-128 and between G-L M2 10 2.00 2.20 44.00
28 through grid between 128-129 and between G M2 1 1.76 2.20 3.88
29 through grid 127 and between G-L 1 12.90 2.20 28.38
30 through grid 128 and G 1 1.30 2.20 2.86
31 Through grid 117 and between F-G M2 1 3.80 3.24 12.31
32 Through grid 119and between F-G M2 1 3.80 3.24 12.31
33 Through grid 119and between C-F M2 1 5.00 3.24 16.20
34 Through grid 130 and between F-G M2 1 4.28 4.40 18.81
35 Through grid 134 and between C-F M2 1 3.60 4.40 15.84
36 Through grid 135 and between C-F M2 1 4.00 4.40 17.60
37 Through grid 136and between C-F M2 1 3.60 4.40 15.84
38 Through grid 127 and between G-N M2 1 29.80 4.40 131.12
39 Through grid 127 and between N-Q M2 1 6.61 6.00 39.63
40 Through grid 118 and between N-Q M2 1 7.55 6.00 45.30
41 Through grid 121 and between N-Q M2 1 3.84 6.00 23.01
42 Through grid 129 and between G-H M2 1 6.30 4.40 27.72
43 Through grid 128 and between H-K M2 1 7.50 4.40 33.00
44 Through grid 129 and between H-J M2 1 2.70 4.40 11.88
45 Through grid 131 and between H-J M2 1 2.20 4.40 9.68
46 Through grid 129 and between K-L M2 1 1.88 4.40 8.25
47 Through grid 132and between K-L M2 1 3.87 4.40 17.04
48 Through grid 135 and between G-H M2 1 8.48 4.40 37.33
49 Through grid 136 and between G-J M2 1 12.63 4.40 55.59
50 Through grid 139 and between G-H M2 1 6.40 4.40 28.16
51 Through grid 140 and between G-H M2 1 5.60 4.40 24.64
52 Through grid 146 and between A-G M2 1 10.39 4.40 45.71
53 Through grid 128 and between R-W M2 1 18.41 6.00 110.46
54 Through grid 127 and between T-W M2 1 16.12 6.00 96.73
55 Through grid 132 and between T-V M2 1 6.82 4.40 29.99
56 Through grid 134 and between U-V M2 1 6.15 4.40 27.06
57 Through grid 132 and between T-V M2 1 7.27 4.40 31.98
58 Through grid 144 and between A-B M2 1 4.80 4.40 21.10
Grid 146/G-J M2 1 11.25 6.00 67.47
Grid 146/L-P M2 1 17.58 6.00 105.47
Total 2,356.78
DEDUCTION
D06 M2 3 1.00 2.50 7.50
D07 M2 3 0.90 2.20 5.94
Opening M2 1 1.40 2.20 3.08
D09 M2 1 1.10 2.50 2.75
D11 M2 2 2.00 2.50 10.00
D05 M2 1 1.00 2.20 2.20
D10 M2 1 1.00 2.20 2.20
Opening M2 1 2.14 2.20 4.71
Opening M2 1 3.60 3.00 10.80
D M2 3 2.20 2.20 14.52
D05 M2 1 1.00 2.20 2.20
M2 1 1.00 2.20 2.20
M2 1 1.00 2.20 2.20
SD04 M2 1 3.00 4.60 13.80
W03 M2 1 4.00 3.10 12.40
W04 M2 1 3.00 3.10 9.30
Opening M2 1 1.40 2.20 3.08
D08 M2 9 0.80 2.10 15.12
D08A M2 2 0.90 2.10 3.78
D014 M2 1 1.00 2.20 2.20
D04 M2 2 2.00 2.20 8.80
Total 138.78
Grand total 2,217.99
MEZZ FLOOR
ZONE-1
Through grid G and between 2-28 M2 1 70.85 3.60 255.06
Through grid M and between 1-4 M2 1 10.12 3.60 36.42
Through grid Q and between 2-4 M2 1 6.15 3.60 22.13
Through grid N and between 5-29 M2 1 71.86 3.60 258.69
Through grid F and between 25-28 M2 1 4.61 3.60 16.59
Through grid 2 and between G-P M2 1 29.36 3.60 105.68
Through grid 4 and between P-Q M2 1 3.56 3.60 12.81
Through grid 25 and between F-N M2 1 32.45 3.60 116.80
Total 824.18
DEDUCTION
W09 M2 10 3.70 3.30 122.10
FD02 M2 3 2.00 2.50 15.00
W011 M2 2 1.70 4.55 15.47
Total 152.57
Grand total 671.61
ZONE-2
Through grid G and between 29-57 M2 1 80.02 3.52 281.26
Through grid N and between 29-57 M2 1 85.75 3.52 301.41
Toatl 582.67
DEDUCTION
W09 M2 10 3.70 3.30 122.10
Total 122.10
Grand total 460.57
ZONE-3
Through grid G and between 57-116 M2 1 80.13 3.52 281.66
Through grid B and between 64-81 M2 1 46.67 3.52 164.06
Through grid M and between 64-67 M2 1 8.06 3.52 28.32
Through grid M and between 79-81 M2 1 8.04 3.52 28.25
Through grid M and between66-67 M2 1 2.50 3.52 8.79
Through grid M and between 77-80 M2 1 2.50 3.52 8.79
Through grid L and between 64-66 M2 1 7.40 2.20 16.28
Through grid L and between 79-81 M2 1 11.60 2.20 25.52
Through grid F and between 80-81 M2 1 2.50 3.52 8.79
Through grid Nand between 57-63 M2 1 18.44 3.52 64.83
Through grid Nand between 82-89 M2 1 19.41 3.52 68.21
Through grid 62 and between A-G M2 1 17.80 3.52 62.57
Through grid81 and between A-F M2 1 14.98 3.52 52.65
Through grid 64 and between L-M M2 1 6.15 3.52 21.62
Through grid 67 and between M-N M2 1 11.30 3.52 39.72
Through grid 66 and between K-N M2 1 6.80 3.52 23.92
Through grid 63 and between P-Q M2 1 2.95 3.52 10.37
Through grid 79 and between M-N M2 1 11.30 3.52 39.73
Through grid 80 and between L-N M2 1 5.85 3.52 20.58
Through grid 81 and between L-M M2 1 6.10 3.52 21.44
Total 996.08
DEDUCTION
W09 M2 4 3.70 3.30 48.84
FD01 M2 1 1.00 2.50 2.50
SD06 1 3.00 2.50 7.50
D06 M2 4 1.00 2.50 10.00
D07 M2 2 0.90 2.20 3.96
D08 M2 13 0.80 2.10 21.84
D08A M2 2 0.90 2.10 3.78
W23 M2 3 2.70 3.30 26.73
M3 3 2.70 3.30 26.73
D05 M2 1 1.00 2.20 2.20
Total 154.08
Grand total 842.00
ZONE-4
Through grid G and between 89-116 M2 1 77.40 3.52 272.06
Through grid N and between 89-116 M2 1 86.53 3.52 304.15
Total 576.21
DEDUCTION
FD01 M2 1 1.00 2.50 2.50
W09 M2 10 3.70 3.30 122.10
FD02 M2 1 2.00 2.50 5.00
129.60
Grand total 446.61
ZONE-5
ZONE-3
Grid through A and between 62-81 M2 1 52.30 7.00 366.10
Grid through A-B and between 79-81 M2 1 20.00 2.20 44.00
Grid through C and between 79-81 M2 1 4.20 7.00 29.40
Grid through E and between 79-81 M2 1 7.26 7.00 50.79
Grid through F and between 62-79 M2 1 45.50 7.00 318.50
Grid through G and between 57-89 M2 1 77.92 7.00 545.47
Grid through G and between 58-60 M2 1 4.60 2.20 10.12
Grid through G and between 58-60 M2 1 4.60 2.20 10.12
Grid through H and between 58-62 M2 1 10.32 7.00 72.22
Grid through G-J and between 57-58 M2 1 18.00 2.20 39.60
Grid through H and between 60-62 M2 1 4.60 2.20 10.12
Grid through J and between 60-62 M2 1 4.60 2.20 10.12
Grid through J and between 59-60 M2 1 3.02 7.00 21.12
Grid through J and between 57-62 M2 1 14.60 7.00 102.20
Grid through K and between 57-58 M2 1 5.18 7.00 36.24
Grid through M and between 57-59 M2 1 4.60 7.00 32.20
Grid through N and between 57-58 M2 1 4.40 7.00 30.80
Grid through Q and between 58-63 M2 1 13.54 7.00 94.77
Grid through S and between 58-63 M2 1 14.23 7.00 99.63
Grid through U and between 58-63 M2 1 13.49 7.00 94.42
Grid through J and between 81-89 M2 1 21.32 7.00 149.27
Grid through L and between 81-89 M2 1 21.32 7.00 149.27
Grid through N and between 81-89 M2 1 19.51 7.00 136.54
Grid through Between X' and between 57-89 M2 1 73.21 7.00 512.50
Grid through Between X' and between 57-89 M2 1 13.53 7.00 94.71
Grid through H and between 62-63 M2 1 2.20 7.00 15.40
Grid through 62 and between A-L M2 1 33.35 7.00 233.42
Grid through 57 and between G-K M2 1 15.35 7.00 107.42
Grid through 57 and between G-J M2 1 12.30 7.00 86.10
Grid through 58 and between G-K M2 1 16.11 7.00 112.77
Grid through 57 and between J-L M2 1 3.60 7.00 25.20
Grid through 59 and between J-L M2 1 5.91 7.00 41.37
Grid through 77 and between A-F M2 1 14.78 7.00 103.46
Grid through 67 and between A-F M2 1 15.40 7.00 107.80
Grid through 81 and between A-F M2 1 14.80 7.00 103.60
Grid through 63 and between G-K M2 1 16.90 7.00 118.33
Grid through 65 and between G-K M2 1 16.90 7.00 118.33
Grid through 68 and between G-K M2 1 16.90 7.00 118.33
Grid through 71 and between G-K M2 1 16.90 7.00 118.33
Grid through 74 and between G-K M2 1 16.90 7.00 118.33
Grid through 76 and between G-K M2 1 16.90 7.00 118.33
Grid through 79 and between G-K M2 1 15.35 7.00 107.42
Grid through 79 and between A-B M2 1 6.00 7.00 42.00
Grid through 80 and between A-B M2 1 6.00 7.00 42.00
Grid through 81 and between W-X' M2 1 4.10 7.00 28.70
Grid through 84 and between S-W M2 1 15.64 7.00 109.49
Grid through 86 and between S-W M2 1 21.68 7.00 151.73
Grid through 89 and between S-W M2 1 19.82 7.00 138.73
Grid through 89 and between G-Q M2 1 31.56 7.00 220.89
Total 5,326.78
DEDUCTION
D08 M2 34 0.80 2.10 57.12
W11 M2 16 1.70 4.63 125.94
D06 M2 4 1.00 2.50 10.00
FD03 M2 2 1.80 2.50 9.00
M2 2 1.80 2.50 9.00
W12 M2 5 3.40 3.90 66.30
W13 M2 8 2.70 4.63 100.01
W21 M2 2 2.70 0.80 4.32
D08A M2 1 0.90 2.10 1.89
opening M2 1 1.78 2.50 4.46
W14 M2 5 1.00 4.63 23.15
W19 M2 6 2.00 4.70 56.40
W18 M2 2 68.00
W17 M2 2 27.22
W17A M2 1 17.44
D07 M2 2 0.90 2.20 3.96
D05 M2 1 2.00 2.20 4.40
Total 588.60
Grand total 4,738.18
ZONE-4
1 Through grid G and between 89-116 M2 1 78.60 8.30 652.38
2 Through grid G and between 89-116 M2 1 90.07 8.30 747.56
3 Through grid G--J and between 90-91 M2 1 10.00 2.20 22.00
4 Through grid J and between 90-94 M2 1 10.00 2.20 22.00
5 Through grid G-J and between 93-95 M2 1 12.33 8.30 102.34
6 Through grid N and between 94-116 M2 1 71.98 8.30 597.43
7 Through grid X' and between 89-102 M2 1 40.74 8.30 338.17
8 Through grid W and between 103-116 M2 1 44.10 8.30 366.03
9 Through grid 93 and between U-W M2 1 10.20 7.10 72.42
10 Through grid 94 and between U-W M2 1 10.20 7.10 72.42
11 through grid 97 and between U-X' M2 1 14.10 7.10 100.11
12 through grid 99 and between U-X' M2 1 12.50 7.10 88.75
13 through grid 101 and between U-X' M2 1 14.10 7.10 100.11
14 through grid 103 and Between U-X' M2 1 10.10 7.10 71.71
15 through grid 109 and between U-W' M2 1 8.52 7.10 60.47
16 through grid 110 and between U-W M2 1 10.10 7.10 71.71
17 through grid 111 and between U-W M2 1 10.10 7.10 71.71
18 through grid 113 and between U-V M2 1 6.20 7.10 43.99
19 through grid 114 and between U-V M2 1 6.20 7.10 43.99
20 through grid 101 and between N-Q M2 1 7.66 7.10 54.41
21 through grid 112 and between N-Q M2 1 6.61 7.10 46.90
22 through grid 90 and between G-J M2 1 7.50 7.10 46.90
23 through grid 93 and between G-J M2 1 7.50 7.10 53.25
24 through grid 94 and between G-J M2 1 7.50 2.20 16.50
25 through grid 91 and between G-J M2 1 7.50 2.20 16.50
26 through grid 92 and between G-J M2 1 2.40 2.20 16.50
27 through grid 93 and between G-J M2 1 7.50 2.20 5.28
28 through grid 94 and between J-Q M2 1 23.69 8.30 62.25
Total 3,963.79
DEDUCTION
W12 M2 7 3.40 3.90 92.82
W13 M2 16 2.70 4.63 200.02
FD01 M2 1 1.00 2.50 2.50
FD04 M2 1 1.20 2.20 2.64
D06 M2 2 1.00 2.50 5.00
W14 M2 10 1.00 4.63 46.30
Total 349.28
Grand total 3,614.51
ZONE-5
Through grid G and between 116-141 M2 1 86.95 9.00 782.57
Through grid Between G-H and between 119-142 M2 1 85.19 9.00 766.67
Through grid H and between 118-122 M2 1 14.85 9.00 133.65
Through grid J and between 118-122 M2 1 13.20 9.00 118.80
Through grid P and between 139-144 M2 1 3.49 9.00 31.37
Through grid W and between 116-132 M2 1 52.09 9.00 468.82
Through grid H and between 119-122 M2 1 8.70 2.20 19.14
Through grid J and between 119-122 M2 1 8.50 2.20 18.70
Through grid V and134 M2 1 2.20 9.00 19.81
Through grid U and between 134-136 M2 1 6.15 8.60 52.90
Through grid Between G-H and between 142-144 M2 1 14.00 2.20 30.80
Through grid 118 and between G-H M2 1 28.60 9 257.40
Through grid 123 and between G-H M2 1 26.35 9 237.15
Through grid 118 and between G-H M2 1 2.60 9 23.40
Through grid 130 and between G-H M2 1 3.63 9 32.63
Through grid 133 and between G-K M2 1 9.70 9 87.30
Through grid 138 and between G-K M2 1 11.06 9 99.50
Through grid 135 and between G-J M2 1 7.92 9 71.31
Through grid 136 and between G-J M2 1 7.23 9 65.03
Through grid 137 and between G-J M2 1 7.45 9 67.09
Through grid 137 and between G-J M2 1 8.60 9 77.40
Through grid 127 and between G-L M2 1 14.00 9 126.00
Through grid 129 and between G-L M2 1 11.70 9 105.30
Through grid 132 and between G-L M2 1 12.40 9 111.60
Through grid 138 and between G-L M2 1 14.10 9 126.90
Through grid 139 and between G-L M2 1 14.10 9 126.90
Through grid 140 and between G-L M2 1 14.10 9 126.90
through grid144 and between L-P M2 1 14.04 9.00 126.32
through grid144 and betweenG-J M2 1 11.95 9.00 107.51
through grid144 and betweenG-J M2 1 11.95 9.00 107.51
through grid143-144 and betweenG-H M2 1 8.45 2.20 18.59
Through 116 and between G-K M2 1 15.33 9.00 137.93
Total 4,682.89
DEDUCTION
W12 M2 5 3.40 3.80 64.60
W13 M2 13 2.70 4.60 161.46
FD4 M2 13 1.20 2.20 34.32
W14 M2 6 1.00 4.60 27.60
D08 M2 19 0.80 2.10 31.92
D08A M2 2 0.90 2.10 3.78
W11 M2 1 1.70 4.60 7.82
D06 M2 2 1.00 2.30 4.60
M2 2 1.00 2.30 4.60
Total 340.70
Grand total 4,342.19
FIRST FLOOR
ZONE-1
Through grid F and between 25-28 M2 1 4.80 3.00 14.40
Through grid G and between 25-28 M2 1 4.80 3.00 14.40
Through grid 25 and between F-G M2 1 3.20 3.00 9.60
through grid M and between 1-5 M2 1 10.32 3.00 30.95
through grid Q and between 1-5 M2 1 10.39 3.00 31.18
through grid 1 and between M-P M2 1 7.01 3.00 21.02
Total 121.55
DEDUCTION
D12 M2 1 1.00 2.20 2.20
W16 M2 3 1.20 1.10 3.96
D04 M2 1 2.00 2.20 4.40
Total 10.56
Grand total 110.99
ZONE-3
Through grid Q and between 67-79 M2 1 27.90 8.41 234.64
Through grid 67 and betweenQ-X' M2 1 31.23 8.41 262.64
Through grid 79 and betweenQ-X' M2 1 31.23 8.41 262.64
Through grid X' and between 67-79 M2 1 18.90 8.41 158.95
Total 918.88
DEDUCTION
W18 M2 2 60.86
W17 M2 3 40.20
101.06
Total 817.82
101.06
ZONE-4
Through grid F and between 107-109 M2 1 4.80 3.10 14.88
Through grid 109 and between F-G M2 1 2.20 3.10 6.82
Through grid G and between 107-109 M2 1 4.52 3.10 14.00
Total 35.70
DEDUCTION
D12 M2 1 1.00 2.20 2.20
W16 M2 1 1.20 1.10 1.32
Total 3.52
Grand total 32.18
ZONE-5
Through grid 130 And between E-G M2 1 4.25 3.00 12.75
Through grid G And between 128-110 M2 1 5.44 3.00 16.32
Total 29.07
DEDUCTION
D12 M2 1 1.00 2.20 2.20
W16 M2 1 1.20 1.10 1.32
Total 3.52
Grand total 25.55
Boundary wall
ZONE-1
through grid A and between 1-29 M2 1 62.53 1.85 115.68
ZONE-2
through grid A and between 29-57 M2 1 86.62 1.85 160.24
ZONE-3
through grid A and between 57-89 M2 1 90.00 1.85 166.50
ZONE-4
through grid A and between 89-116 M2 1 75.46 1.85 139.61
ZONE-5
through grid A and between 116-144 M2 1 101.10 1.85 187.04
Grand total 769.07
986.54
15,240.65
3,468.55
9,905.73
Grand total of block work 29,601.47
435.00
30,036.47
PARAPET WALL
ROOF FLOOR
ZONE 3
47 Grid 62/A-G m2 1 19.20 1.00 19.20
48 Grid 81/A-G m2 1 16.40 1.00 16.40
49 Grid 62-81/A m2 1 53.54 1.00 53.54
50 Grid 130-144/G m2 1 52.80 1.00 52.80
51 Grid 144/G-J m2 1 12.05 1.00 12.05
Grid 114-119/C m2 1 18.80 0.80 15.04
Grid114/C-G m2 1 8.00 0.80 6.40
Grid 119/C-G m2 1 6.34 1.00 6.34
Road of Excellence m2 -
upto11 Tekret m2 -
.02.201
Shea Gabin m2 53.46
8
Victory m2 172.94
Dadabhai construction m2 1,346.23
Cement block
2,774.85
477.30
269.20
1,305.01
129.36