Professional Documents
Culture Documents
Professional Charges Billing Total Profesional Exp Gasoline & Other Withholding 10% Bank Pay Cheque Required 508,872.70
Professional Charges Billing Total Profesional Exp Gasoline & Other Withholding 10% Bank Pay Cheque Required 508,872.70
TOTAL
Profesional Exp 107,000.00 138,000.00 125,000.00 370,000.00
Gasoline & Other 20,000.00 70,000.00 85,872.70 175,872.70
Withholding 10% 10,700.00 13,800.00 12,500.00 37,000.00
Bank Pay 116,300.00 194,200.00 198,372.70 508,872.70 Cheque Required 508,872.70/-
As Per Felma :
Felma Billing 205,000.00 520,000.00 210,872.70 935,872.70 As Per Felma Monthly Charges 35,000
545,872.70 As per Certification Monthly Charges 9,000
390,000.00 Deducted
March 2010 ending billing from contractors
Contractors Work Order Provision (Basic Value)
Ecophil Bio Gas Tank 1,192,937.46
Esalig Bio Gas Tank 632,500.00
Triple A TG Set 1,417,500.00
Triple A Steam Line Condensate Piping & Pipe Rack 991,973.85
AGP Chimeney 214,000.00
AGP Evaporation 369,619.75
AGP Fire Fighting 502,700.00
Double M Boiler Electrical 104,573.00
Double M Evaporation E & I 240,637.50
Double M Boiler Instrumentation 159,975.00
Double M Inst PDB 1 & 2 & Bio Gas 200,892.86
Electro Ferm, Dist CT Elec 162,496.44
Electro Ferm, Dist CT Inst 110,000.00
Electro Bulk & Receiver Elec 168,246.00
Electro Bulk & Receiver Elec Material 157,954.46
Union Galvasteel Roofing 947,927.68
San Julio Lime Ducting Support 115,245.55
San Julio Pipe Rack Bio Gas Near 515,254.23
San Julio Pipe Rack Bio Gas 94,174.45
San Julio Pipe Rack Bio Gas 164,448.30
San Julio Sludge Tank 389,736.20
San Julio Lime Dosing Tank 7,941.13
San Julio Wet Scrubber 106,539.34
Kuntel Pump Foun. Evaporation 144,584.82
Kuntel CPU 1,066,675.46
Kuntel MCC PCC Evaporation 442,607.48
Triple A Pipe Rack WTP 359,378.96
Triple A BO Install Ferm & Dist 82,960.00
Triple A Piping Ferm & Dist 492,923.20
Triple A Piping FT loops welding works 122,227.88
Triple A Piping Distillation CWS Line 30,774.65
Triple A Piping welding from JDES 361,873.05
Triple A WTP pefabricated piping 69,290.08
Triple A Wet Scrubber Equipment Install 368,469.13
A 12,509,037.91
Juntee Trading Other C. Charges B
Total (A + B)
rs
Remark
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo 248529.00
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bal billing as per wo
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill in prog. for cert.
Bill Balance
Dt 7 September 2010
EHN
Billing Basic 7,062,500.00
Vat 847,500.00
G Total 7,910,000.00
Withholding Tax 141,250.00
Debit Note -
Net Pay 7,768,750.00
Payment paid 6,977,250.00
Balance / Retention 791,500.00
EHN
Billing Basic 4,645,351.02
Vat 557,442.12
G Total 5,202,793.14
Withholding Tax 92,907.02
Debit Note -
Net Pay 5,109,886.12
Payment paid 4,518,160.00
Balance / Retention 591,726.12
Actual required retention 10% on 464,535.10
Difference 127,191.02
267,334.76
Pestano
175,487.30
Esalig 95,480.00
Double M
Liang Chi
EHN
TOTAL 538,302.06
Nut bolt & gasket we can adjust at site from available diff sizes stock
Double
1262944
Double M
1,559,048.99 7,062,500.00
187,085.88 847,500.00
1,746,134.87 7,910,000.00
30,320.69 141,250.00
- -
1,715,814.18 7,768,750.00
1,546,298.00 7,062,500.00 85,250.00 7,147,750.00
169,516.18 706,250.00
155,904.90 706,250.00
13,611.28 -
Dt 16 September 2010
512,006.50
Operating Expenses
Consultant Fee 1,214,328.87 1,214,328.87 -
Rent 326,900.00 326,900.00 -
Repair and Maintance 172,633.75 172,633.75 -
Interest and Tax Penalty 100,157.92 100,157.92 -
Donation 65,500.00 65,500.00 -
Office Supplies 32,944.17 32,944.17 -
Tel & Postage 25,497.44 25,497.44 -
Travelling exps 20,508.54 20,508.54 -
Testing Charges 20,000.00 20,000.00 -
Fringe Benefit 11,431.14 11,431.14 -
Insurance 6,966.00 6,966.00 -
Depreceation expenses 4,821.47 - 4,821.47
Represntation and entertai 2,370.00 2,370.00 -
Legal Expenses 150.00 150.00 -
Provision for Gasoline 0 30000 (30,000.00)
1214328.87
326900
172633.75
100157.92
65500
32944.17
25497.44
20508.54
20000
11431.14
6966
4821.47
2370
150
2004209.3
rk 2008-2009
6083792.99
Tel + Postage
Travelling employee + others
4522727.50 2004209.3
Guest entetainment
1935000 1161000
232200 139320
1300320
6038417.97
6083792.99
45375.0200000005
2518518.20
2493339.67
25178.53
September 2010 Cash Required
Advance to Employee 82,000.00
Amit Ladkat 3,000.00
Pavan Raina 3,000.00
C Rama 3,000.00
Shailesh Bhide 3,000.00
Ramesh Chulaki 20,000.00 approved from mane sir
Advance to Triveni (Mr. Reddy) 20,000.00 request received
Sushil Kumar 20,000.00 request received
Bharat Bandkundri 10,000.00 request received
Telephone Exps. 3,750.00
Amit Ladkat 750.00
Pavan Raina 1,500.00
C Rama 750.00
Shailesh Bhide 750.00
Printing & Stationery 3,000.00
Postage & Courier 1,000.00
Other Emer Exps. / pur./ Tickets 20,250.00
TOTAL CASH REQUIRED 110,000.00
14880
8.5
126480
4.5
66960
66960
260400
31248
291648
259778.4
112.00 31869.6
100.00 28,455.00
3,414.60
31,869.60
Supplier Material
Bacolod Steel GI Corrougated Sheet
Bacolod Steel GI Corrougated Sheet
Bacolod Steel GI Corrougated Sheet
Liberty GI Corrougated Sheet
Pages
Page 1 to 2
Page 1 to 2
Page 1 to 3
Page 1 to 3
Page 1 to 3
Page 1 to 3
0.01
0.10
18,692.52 19,074.00 381.48 18,692.52
45,481.80 46,410.00 928.20 45,481.80
8,153.60 8,320.00 166.40 8,153.60
525.08 535.80 10.72 525.08
629.16 642.00 12.84 629.16
93.59 95.50 1.91 93.59
2,399.04 2,448.00 48.96 2,399.04
9,008.16 9,192.00 183.84 9,008.16
1,584.66 1,617.00 32.34 1,584.66
188.16 192.00 3.84 188.16
129.36 132.00 2.64 129.36
1,411.20 1,440.00 28.80 1,411.20
2,234.40 2,280.00 45.60 2,234.40
743.82 759.00 15.18 743.82
4,586.40 4,680.00 93.60 4,586.40
2,527.00 2,660.00 133.00 2,527.00
44.8688 0.45
44.8688 4.49
Material Description Size Qty In Length (6Mtrs)Rate Per Length Amount Remark
BI / MS Pipe Sch 3" (80 NB) 4 5,775.00 23,100.00
MS Plate 10 mm x 4' x 8' 1 9,200.00 9,200.00
MS Channel Bar 6" x 3" x 6M 12# 6 4,752.00 28,512.00
BI / MS Pipe Sch 2" (50 NB) 10 694.80 6,948.00
BI / MS Pipe Sch 1" (25 NB) 1 932.00 932.00
68,692.00
Transport 2,000.00
Total 70,692.00
Material Description Size Qty In Length (6Mtrs)Rate Per Length Amount Remark
BI / MS Pipe Sch 6" (150 NB) 5 8,658.15 43,290.75 Evaporation to dryer steam line
BI / MS Pipe Sch 2" (50 NB) 12 694.80 8,337.60 Evaporation to dryer water line
BI / MS Pipe Sch 1" (25 NB) 4 932.00 3,728.00 Steam to CIP
SS Pipe T 304 1 1/2" (40 NB) 3 4,675.00 14,025.00 New modification as per AEON
Total 69,381.35
Dis 2% 1,387.63
G Total 67,993.72
Bacolod steel transport charges for per trip 2000 P 112.00 33000.00
100.00 29464.29
3535.71
33000.00
Item Name Size Roxol Price Bacolod Price Remark
MS / BI Pipe Sea 6" (150 NB) 14,900.00 16,550.00 Roxol have 2 short qty
MS / BI Pipe Sea 8" (200 NB) 19,500.00 17,325.00
### 8658.15
86.5815 814,028.40
8571.5685 ###
TOTAL
7,200.00
7,200.00
7,200.00
21,600.00
7,200.00
2,330.00
9,530.00
7,200.00
2,330.00
9,530.00
7,200.00
2,330.00
9,530.00
73,910.00