Wood + Composite Model

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

COPYRIGHT

NO PART OF THIS DOCUMENT MAY BE REPRODUCED,


TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

NO. REVISI TANGGAL

JUDUL PROYEK

#Project Name

ARSITEKTUR

LANTAI 1
-

STRUKTUR

MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

3D DENAH BANGUNAN 1:400

LAYOUT ID HALAMAN JML LEMBAR

-
LANTAI 2 ARS-001 1 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

G G

F F

UP
E E

D D
NO. REVISI TANGGAL

JUDUL PROYEK
C C

B B
#Project Name
A A
A1 A1
ARSITEKTUR

1 1a 2 3 4 5 6 7
STRUKTUR

MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

SITEPLAN 1:200

SITEPLAN
- Scale : 1:200
LAYOUT ID HALAMAN JML LEMBAR

ARS-002 2 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

E-03

C D
S-2 S-4

1 1a 2 3 4 5 6 7

985,20
61,00
375,00 549,20

G G

KITCHEN
GRANIT 40x40
BEDROOM FFL: ±0,00

250,00
GRANIT 40x40
FFL: ±0,00
340,00

DINING ROOM
GRANIT 40x40
FFL: ±0,00
F F

UP
NO. REVISI TANGGAL

200,00
1
2
3
4
5
6
7
8
9
E E
JUDUL PROYEK

11
18
17
16
15
14
13
12

10
A A
BATHROOM
S-1 GRANIT 20x20
S-1
E-04

E-02
FFL: ±0,00

50,00
972,20

WARDROBE

D D #Project Name

1.162,20
510,00

WARDROBE

220,30
ARSITEKTUR
RG. KELUARGA
B B
GRANIT 40x40
S-2 FFL: ±0,00
S-2
WARDROBE
C BEDROOM C
GRANIT 40x40
FFL: ±0,00

179,70
BATHROOM
GRANIT 20x20 STRUKTUR
FFL: ±0,00
B B
122,20

92,20
20,00

A A
TERAS

A1
GRANIT 40x40
A1 MEKANIKAL ELEKTRIKAL

170,00
FFL: ±0,00

365,80

383,30 165,40 318,00 126,30 DIGAMBAR GUNAWAN

993,00 DIPERIKSA

DISETUJUI
C D
1 1a 2 3 S-2 4 S-4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

E-01 DENAH LANTAI 1 1:100

FFL. ±0.00 RENCANA DENAH LANTAI 1


- Scale : 1:100 LAYOUT ID HALAMAN JML LEMBAR

ARS-003 3 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

E-03

C D
S-2 S-4

1 1a 2 3 4 5 6 7

979,20

369,00 296,00 314,20

G G

BEDROOM BEDROOM

244,00
FLOORBOARD FLOORBOARD
FFL: ±0,00
340,00
FFL: ±0,00

F F
WARDROBE WARDROBE

NO. REVISI TANGGAL

201,00
10,00

E E
JUDUL PROYEK

DOWN
A A
150,00

BATHROOM FOYER
S-1 GRANIT 20x20
S-1
FLOORBOARD
E-04

E-02
FFL: ±0,00 FFL: ±0,00

48,00
972,20

D
MINI KITCHEN
D #Project Name

1.156,20
ARSITEKTUR
B BEDROOM B
S-2 FLOORBOARD S-2
350,00

FFL: ±0,00 WARDROBE


C C

493,20
BEDROOM
FLOORBOARD
FFL: ±0,00

STRUKTUR
BATHROOM
B GRANIT 20x20 B
FFL: ±0,00
122,20

BALKON
GRANIT 40x40
FFL: ±0,00
A A

A1 A1 MEKANIKAL ELEKTRIKAL

170,00
BALKON
GRANIT 40x40
FFL: ±0,00

365,81

376,30 165,40 368,80 78,00


DIGAMBAR GUNAWAN
988,50
DIPERIKSA

DISETUJUI
C D
1 1a 2 3 S-2 4 S-4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

E-01 DENAH LANTAI 2 1:100

FFL +3.10 RENCANA DENAH LANTAI 2


- Scale : 1:100 LAYOUT ID HALAMAN JML LEMBAR

ARS-004 4 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

141,74

+5,90 +5,90
2 ROOF 2 ROOF

NO. REVISI TANGGAL


248,74

JUDUL PROYEK

+3,10 +3,10 +3,10


1 LANTAI 2 1 LANTAI 2
#Project Name

+1,58 ARSITEKTUR
329,00

±0,00 ±0,00 ±0,00


-0,19
0 LANTAI 1 0 LANTAI 1
1,00

STRUKTUR

MEKANIKAL ELEKTRIKAL
-3,10 -3,10
-1 FOOTING -1 FOOTING
7,00 61,00
175,00 200,00 164,20 125,80 259,20

1 1a 2 3 4 5 6 7

DIGAMBAR GUNAWAN
S-1 POTONGAN A - A
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR POTONGAN 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-005 5 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

7 6 5 4 3 2 1 1a

+5,90 +5,90
2 ROOF 2 ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10 +3,10
1 LANTAI 2 1 LANTAI 2
#Project Name

ARSITEKTUR

±0,00 ±0,00
0 LANTAI 1 0 LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL
-3,10 -3,10
-1 FOOTING 61,00 7,00 -1 FOOTING
259,20 125,80 164,20 200,00 175,00

7 6 5 4 3 2 1 1a

DIGAMBAR GUNAWAN
S-2 POTONGAN B - B
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR POTONGAN 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-006 6 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

A1 A B C D E F G

+5,90 +5,90
2 ROOF 2 ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10 +3,10
1 LANTAI 2 1 LANTAI 2
#Project Name

ARSITEKTUR

P-01

±0,00 ±0,00
0 LANTAI 1 0 LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL
-3,10 -3,10
-1 FOOTING -1 FOOTING
20,00
122,20 170,50 179,50 150,00 100,00 250,00
A1 A B C D E F G

DIGAMBAR GUNAWAN
S-3 POTONGAN C - C
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR POTONGAN 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-007 7 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

G F E D C B A1 A

+5,90 +5,90
2 ROOF 2 ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10 +3,10
1 LANTAI 2 1 LANTAI 2
#Project Name

ARSITEKTUR

±0,00 ±0,00
0 LANTAI 1 0 LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL
-3,10 -3,10
-1 FOOTING -1 FOOTING
20,00
250,00 100,00 150,00 179,50 170,50 122,20
G F E D C B A1 A

DIGAMBAR GUNAWAN
S-4 POTONGAN D - D
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR POTONGAN 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-008 8 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

+5,90
ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10
LANTAI 2
#Project Name

ARSITEKTUR

±0,00
LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL

1 1a 2 3 4 5 6 7

DIGAMBAR GUNAWAN
E-01 TAMPAK DEPAN
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR TAMPAK 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-009 9 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

A1 A B C D E F G

+5,90
ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10
LANTAI 2
#Project Name

ARSITEKTUR

±0,00
LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL

A1 A B C D E F G

DIGAMBAR GUNAWAN
E-02 TAMPAK SAMPING KANAN
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR TAMPAK 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-010 10 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

7 6 5 4 3 2 1 1a

+5,90
ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10
LANTAI 2
#Project Name

ARSITEKTUR

±0,00
LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL

7 6 5 4 3 2 1 1a

DIGAMBAR GUNAWAN
E-03 TAMPAK BELAKANG
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR TAMPAK 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-011 11 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

G F E D C B A1 A

+5,90
ROOF

NO. REVISI TANGGAL

JUDUL PROYEK

+3,10
LANTAI 2
#Project Name

ARSITEKTUR

±0,00
LANTAI 1
STRUKTUR

MEKANIKAL ELEKTRIKAL

G F E D C B A1 A

DIGAMBAR GUNAWAN
E-04 TAMPAK SAMPING KIRI
- Scale : 1:100 DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

GAMBAR TAMPAK 1:100

LAYOUT ID HALAMAN JML LEMBAR

ARS-012 12 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

985,20
61,00
375,00 549,20

P-1

G G
J-3 J-3 J-3a
KITCHEN
GRANIT 40x40
BEDROOM FFL: ±0,00

250,00
GRANIT 40x40

J-3a
FFL: ±0,00
340,00

DINING ROOM
GRANIT 40x40
J-3

FFL: ±0,00
F F

UP
NO. REVISI TANGGAL

200,00
1
2
3
4
5
6
7
8
9
E E
JUDUL PROYEK

11
18
17
16
15
14
13
12

10
P-1

P-2
BATHROOM WD3 WD4 WD5
J-2
GRANIT 20x20
FFL: ±0,00

50,00
P-1 OP
972,20

D D #Project Name

1.162,20
510,00

J-3d

220,30
ARSITEKTUR
RG. KELUARGA
GRANIT 40x40
WD-1 WD-1
FFL: ±0,00

C BEDROOM C
GRANIT 40x40
FFL: ±0,00
J-3

P-2

PJ-1

179,70
BATHROOM
GRANIT 20x20 STRUKTUR
FFL: ±0,00
B J-3c J-3c B
122,20

92,20
J-2
20,00

A A
TERAS

A1
GRANIT 40x40
A1 MEKANIKAL ELEKTRIKAL

170,00
FFL: ±0,00

365,80

383,30 165,40 318,00 126,30 DIGAMBAR GUNAWAN

993,00 DIPERIKSA

DISETUJUI

1 1a 2 3 4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

DENAH PINTU DAN JENDELALANTAI 1 RENCANA DENAH PINTU


- 1:100
DAN JENDELA

LAYOUT ID HALAMAN JML LEMBAR

ARS-013 13 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

979,20

369,00 296,00 314,20

G G
J-3 J-3 J-3

BEDROOM BEDROOM

244,00
FLOORBOARD

J-3
FLOORBOARD
FFL: ±0,00
340,00
FFL: ±0,00

J-3
F F

NO. REVISI TANGGAL

201,00
10,00

E E
JUDUL PROYEK

DOWN
P-1 P-1

P-2
150,00

BATHROOM FOYER
J-2
GRANIT 20x20 FLOORBOARD
FFL: ±0,00 FFL: ±0,00

48,00
P-1
972,20

D
MINI KITCHEN
D #Project Name

1.156,20
ARSITEKTUR

P-1
BEDROOM
FLOORBOARD
350,00

FFL: ±0,00
C C

493,20
BEDROOM

J-4
FLOORBOARD
J-3b

FFL: ±0,00

J-3b
STRUKTUR
BATHROOM
B GRANIT 20x20 B
FFL: ±0,00
122,20

P-1
BALKON

P-2
GRANIT 40x40 J-2
FFL: ±0,00
A A

P-4 MEKANIKAL ELEKTRIKAL


A1 A1

170,00
BALKON
GRANIT 40x40
FFL: ±0,00

365,81

376,30 165,40 368,80 78,00


DIGAMBAR GUNAWAN
988,50
DIPERIKSA

DISETUJUI

1 1a 2 3 4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

DENAH PINTU DAN JENDELALANTAI 2 RENCANA DENAH PINTU


- 1:100
DAN JENDELA

LAYOUT ID HALAMAN JML LEMBAR

ARS-014 14 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

Door Opening
ID OP P-1 P-2 P-4 PJ-1
JUMLAH 1 8 4 1 1

2D Symbol

280,00
225,00
80,00 75,00
NO. REVISI TANGGAL

JUDUL PROYEK

10,00 34,40 10,00

70,00
40,00
#Project Name

10,00
ARSITEKTUR
210,00

250,00

200,00

210,00

282,00
185,70
210,00

View from Side Opposite to

212,00
Opening Side

STRUKTUR

10,00
141,20 75,00 280,00
80,00
60,00 105,00 60,00
MEKANIKAL ELEKTRIKAL
225,00

KETERANGAN

Opening Door
- DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

PINTU DAN JENDELA LIST 1:1

LAYOUT ID HALAMAN JML LEMBAR

ARS-015 15 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.
All Openings Schedule
ID J-2 J-3 J-3a J-3b J-3c J-3d
JUMLAH 4 9 2 2 2 1
W x H Size 120,00x40,00 160,00x160,00 160,00x105,00 160,00x137,00 152,75x282,00 165,30x282,00

2D Symbol
120,00 160,00 160,00 160,00 152,75 165,30

70,00

70,00
40,00

105,00

137,00

282,00

282,00
120,00

160,00
View from Side
Opposite to Opening

212,00

212,00
Side
160,00

160,00

160,00

55,77 53,77 55,77


51,58 49,58 51,58 165,30
152,75

KETERANGAN NO. REVISI TANGGAL

JUDUL PROYEK

Opening Window
-
#Project Name

ARSITEKTUR
All Openings Schedule
ID J-4
JUMLAH 1
W x H Size 300,00x160,00

STRUKTUR
2D Symbol
300,00

MEKANIKAL ELEKTRIKAL

160,00
DIGAMBAR GUNAWAN
View from Side
Opposite to Opening DIPERIKSA
Side
DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

300,00

PINTU DAN JENDELA LIST 1:1

KETERANGAN LAYOUT ID HALAMAN JML LEMBAR

Opening Window ARS-016 16 32


-

06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
13,00 15,00
KAYU BALOK 6/12 COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,

13,00 12,00

36,00
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

+2,85
LISPLANK GYPSUM LISPLANK GYPSUM KAYU BALOK 6/12
FIN. CAT WEATHERSHIELD +2,85 FIN. CAT WEATHERSHIELD
LAMP
EX. MOWILEX EX. MOWILEX PLAFON GYPSUM 12 MM
FIN. CAT EMULTION
PLAFON GYPSUM 12 MM EX. MOWILEX
FIN. CAT EMULTION KOLOM KAYU BALOK 18/18 RANGKA HOLLOW CORE
EX. MOWILEX FIN. CAT CLEAR FINISH
RANGKA HOLLOW CORE
KOLOM KAYU BALOK 18/18
FIN. CAT CLEAR FINISH
KOLOM STRUKTUR BETON WALLGLASS FRAME KAYU

283,00
DI ACI KACA BENING 6MM
FIN. CAT WEATHERSHIELD EX. ASAHIMAS

282,00
EX. MOWILEX
WALLGLASS FRAME KAYU
DINDING FINISH BATA KACA BENING 6MM DINDING PLASTER
DI ACI EX. ASAHIMAS DI ACI
FIN. CAT CLEAR FINISH FIN. CAT WEATHERSHIELD
EX. MOWILEX
WALLGLASS FRAME KAYU
KACA BENING 6MM GRANIT 30X60 UNPOLISHED
EX. ASAHIMAS EX. INDOGRESS
GRANIT 30X60 POLISHED GRANIT 30X60 POLISHED
EX. INDOGRESS EX. INDOGRESS
GRANIT 30X60 UNPOLISHED
EX. INDOGRESS
±0,00

2,00 20,00
-0,01

12,00 3,00
-0,01 ±0,00
18,00 11,60
49,50 305,90
18,00 1,00 20,00 11,60 20,00 16,80
161,00 56,20 204,90 149,00
IE-01 03 S
IE-01 04 W - Scale : 1:50
- Scale : 1:50

6,20 13,00 15,00


KAYU BALOK 6/12

36,00
17,50 12,00 9,20 1,20 18,00 +2,85 LISPLANK GYPSUM
114,30 180,80 49,50 FIN. CAT WEATHERSHIELD

64,00
EX. MOWILEX
PLAFON GYPSUM 12 MM
18,00 6,20

RANGKA HOLLOW CORE


NO. REVISI TANGGAL

18,00
WALLGLASS FRAME KAYU
KACA BENING 6MM
EX. ASAHIMAS JUDUL PROYEK
KOLOM KAYU BALOK 18/18
FIN. CAT CLEAR FINISH

#Project Name
149,00

206,40
RG. TAMU
±0,00 GRANIT 30X60 POLISHED ARSITEKTUR
EX. INDOGRESS
GRANIT 30X60 UNPOLISHED
20,00

EX. INDOGRESS
N

3,00 5,40
RG. KELUARGA TERAS
373,50

W IE-01 E ±0,00 -0,01


S

20,40 11,60 STRUKTUR


194,80 102,60 72,90 256,20

IE-01 02 E
- Scale : 1:50
272,70

60,00 60,00 60,00

13,00 15,00
MEKANIKAL ELEKTRIKAL
12,00

LISPLANK GYPSUM
FIN. CAT WEATHERSHIELD
+2,85 EX. MOWILEX
77,20

KAYU BALOK 6/12


18,00 1,00 20,00

PLAFON GYPSUM 12 MM
RANGKA HOLLOW CORE
KOLOM KAYU BALOK 18/18 DIGAMBAR GUNAWAN
18,00

FIN. CAT CLEAR FINISH


T E RAS PIPA AIR HUJAN 3" DIPERIKSA
WALLGLASS FRAME KAYU
-0,01 KACA BENING 6MM DISETUJUI
282,00

EX. ASAHIMAS
DINDING PAPAN 2 X 24 JUDUL GAMBAR SKALA GAMBAR
RANGKA KAYU 5/7
161,00

161,00

FIN. CAT CLEAR FINISH


GRANIT 30X60 POLISHED
EX. INDOGRESS
GRANIT 30X60 UNPOLISHED TYPICAL DENAH RUANG
EX. INDOGRESS 1:50
TAMU
8,00 5,00 10,00

RG. KELUARGA
±0,00 -0,01
LAYOUT ID HALAMAN JML LEMBAR
3,50 12,00 18,00
302,00 49,50
18,00 11,60 18,00
WD-01 TYPICAL DENAH RG. TAMU
305,90 49,50 ARS-017.1 17 32
- Scale : 1:50
IE-01 01 N
- Scale : 1:50 06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

12,00

12,00
47,54

47,54
PLAFON GYPSUM 12 MM PLAFON GYPSUM 12 MM
FIN. CAT EMULTION FIN. CAT EMULTION
EX. MOWILEX EX. MOWILEX
RANGKA HOLLOW CORE RANGKA HOLLOW CORE
+2,50 SALURAN LIMBAR CAIR
PIPA PVC 3"

72,46

72,46
EX. MASPION

40,00
KUSEN KAYU
KACA BENING 5 MM
DINDING PLASTER DINDING PLASTER
DI ACI DI ACI
FIN. CAT WEATHERSHIELD FIN. CAT WEATHERSHIELD
EX. MOWILEX EX. MOWILEX
KERAMIK DINDING 25 X 25
KERAMIK DINDING 25 X 25
POLISHED
POLISHED

200,00
EX. INDOGRESS
EX. INDOGRESS

180,00
178,00
20,00 20,00

180,00
72,70 72,70 PINTU UPVC
GRANIT 20X20 UNPOLISHED
EX. INDOGRESS
16,80 7,40
12,00

GRANIT 20X20 UNPOLISHED


EX. INDOGRESS

-0,02

12,00
N 13,00 13,00 75,00
163,50

152,40
149,00

W IE-06 E
13,00 15,00
237,90
S

IE-02 03 S
- Scale : 1:50 IE-02 04 W NO. REVISI TANGGAL
15,00 23,30 20,00

15,00 23,30 20,00

WARDROBE - Scale : 1:50


JUDUL PROYEK

#Project Name
77,00
75,00

ARSITEKTUR
N
12,00

W IE-02 E
237,90

47,54

PLAFON GYPSUM 12 MM
S
FIN. CAT EMULTION
EX. MOWILEX
157,40

RANGKA HOLLOW CORE


+2,50 PLAFON GYPSUM 12 MM +2,50
FIN. CAT EMULTION
STRUKTUR
72,46

72,46
EX. MOWILEX
LAMP RANGKA HOLLOW CORE SHOWER KIT
EX. TOTO

DINDING PLASTER
DI ACI
20,00

13,00

FIN. CAT WEATHERSHIELD


SHOWER KIT EX. MOWILEX
EX. TOTO
KERAMIK DINDING 25 X 25
13,00 16,20 16,20 13,00 DINDING PLASTER POLISHED
MEKANIKAL ELEKTRIKAL
120,00 DI ACI EX. INDOGRESS
177,00

178,00
FIN. CAT WEATHERSHIELD
WATER CLOSED
EX. MOWILEX
EX. TOTO
KERAMIK DINDING 25 X 25

WD-02 TYPICAL DENAH KM/WC DAN FOYER POLISHED


EX. INDOGRESS
- Scale : 1:50 GRANIT 20X20 UNPOLISHED GRANIT 20X20 UNPOLISHED
EX. INDOGRESS EX. INDOGRESS

-0,02 -0,02
3,00

DIGAMBAR GUNAWAN

DIPERIKSA
13,00 13,00 15,00 13,00
152,40 237,90 DISETUJUI

JUDUL GAMBAR SKALA GAMBAR


IE-02 01 N IE-02 02 E
- Scale : 1:50 - Scale : 1:50
TYPICAL DENAH KM/WC DAN
1:50
FOYER

LAYOUT ID HALAMAN JML LEMBAR

ARS-017.2 18 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

25,00
PLAFON GYPSUM 12 MM PLAFON GYPSUM 12 MM
FIN. CAT EMULTION +2,85 FIN. CAT EMULTION

62,00

62,00
EX. MOWILEX EX. MOWILEX
RANGKA HOLLOW RANGKA HOLLOW
DINDING PAPAN 2 X 24 DINDING PAPAN 2 X 24
RANGKA KAYU 5/7 RANGKA KAYU 5/7

15,00

17,00
FIN. CAT CLEAR FINISH FIN. CAT CLEAR FINISH

64,33

62,33
KUSEN PINTU TYPE OP KUSEN PINTU TYPE OP
FIN. CAT CLEAR FINISH FIN. CAT CLEAR FINISH

64,33

64,33
BUILT IN WARDROBE BUILT IN WARDROBE
KAYU PAPAN TEBAL 2 CM KAYU PAPAN TEBAL 2 CM
FIN. POLITUR FIN. POLITUR
DINDING FINISH BATA DINDING FINISH BATA
DI ACI DI ACI
FIN. CAT CLEAR FINISH FIN. CAT CLEAR FINISH

64,33

64,33
GRANIT 30X60 POLISHED GRANIT 30X60 POLISHED
EX. INDOGRESS EX. INDOGRESS

12,00

12,00
±0,00

7,40 15,00 15,00 7,40


166,30 42,80 42,80 166,30
NO. REVISI TANGGAL

IE-06 02 E IE-06 04 W
JUDUL PROYEK

- Scale : 1:50 - Scale : 1:50

#Project Name

ARSITEKTUR

BALOK 5/7

PLAFON GYPSUM 12 MM
+2,86 FIN. CAT EMULTION
EX. MOWILEX
75,60

RANGKA HOLLOW STRUKTUR


PLAFON GYPSUM 12 MM
FIN. CAT EMULTION DINDING PAPAN 2 X 24
EX. MOWILEX RANGKA KAYU 5/7

15,00
RANGKA KAYU RENG 2X3 FIN. CAT CLEAR FINISH
DINDING PAPAN 2 X 24
RANGKA KAYU 5/7
KOLOM KAYU BALOK 18/18

64,33
FIN. CAT CLEAR FINISH
FIN. CAT CLEAR FINISH

MEKANIKAL ELEKTRIKAL
DINDING PAPAN 2 X 24
RANGKA KAYU 5/7

64,33
BUILT IN WARDROBE
207,00

FIN. CAT CLEAR FINISH


KAYU PAPAN TEBAL 2 CM
FIN. POLITUR
KUSEN PINTU TYPE OP
FIN. CAT CLEAR FINISH

64,33
GRANIT 30X60 POLISHED GRANIT 30X60 POLISHED
EX. INDOGRESS EX. INDOGRESS DIGAMBAR GUNAWAN
12,00
±0,00 DIPERIKSA

DISETUJUI
7,40 2,30 7,00 7,00 18,00 20,00 7,00 7,00 7,00 14,60 7,40
135,20 58,70 58,70 JUDUL GAMBAR SKALA GAMBAR

IE-06 01 N IE-06 03 S
- Scale : 1:50 - Scale : 1:50 FOYER 1:50

LAYOUT ID HALAMAN JML LEMBAR

ARS-017.3 19 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

PLAFON GYPSUM 12 MM
FIN. CAT EMULTION
EX. MOWILEX
RANGKA HOLLOW CORE

50,80
KOLOM BALOK 18/18
13,00 7,40 5,80 7,40 DINDING PAPAN 2 X 24
113,10 232,30 RANGKA KAYU 5/7
FIN. CAT CLEAR FINISH

175,80
75,00
8,38
16,80 7,40 8,40

160,00
42,60

KACA BENING 5 MM

49,89
54,00

COFFE TABLE RANGKA KUSEN KAYU KELAS II

60,00

210,00
232,30

100,00
90,00
149,00

RAILING
STEEL CORE
FIN. CAT OIL BASED

BALOK 6/12

LANTAI PAPAN TEBAL 2 CM


FIN. MELAMIK

7,40 7,00 7,40 NO. REVISI TANGGAL


48,00 91,10 300,00 88,70 166,30
484,91 JUDUL PROYEK

E
217,70

IE-07 02
- Scale : 1:50
#Project Name
715,98
N

W IE-07 E

S
ARSITEKTUR
75,00

PLAFON GYPSUM 12 MM

50,80
FIN. CAT EMULTION STRUKTUR
7,40 26,30

EX. MOWILEX
RANGKA HOLLOW CORE
7,40

75,00
DINDING PAPAN 2 X 24
RANGKA KAYU 5/7
FIN. CAT CLEAR FINISH
165,38
169,62

MEKANIKAL ELEKTRIKAL

60,00
KOLOM BALOK 18/18

90,00
KITCHEN SET
KAYU KELAS II
FIN. CAT PLITUR DIGAMBAR GUNAWAN
365,81
DIPERIKSA
35,60 7,40
43,00 280,00
BALOK 6/12 DISETUJUI
368,80 LANTAI PAPAN TEBAL 2 CM
FIN. MELAMIK JUDUL GAMBAR SKALA GAMBAR
18,00 26,40
126,30 232,30
WD-07 TYPICAL RG. TIDUR UTAMA
- Scale : 1:50
IE-07 01 N GENERAL BEDROOM 1:50
- Scale : 1:50

LAYOUT ID HALAMAN JML LEMBAR

ARS-017.4 20 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

KOLOM STRUKTUR PLASTER


DI ACI
FIN. CAT WEATHERSHIELD
PLAFON GYPSUM 12 MM EX. MOWILEX
FIN. CAT EMULTION DINDING PAPAN 2 X 24
EX. MOWILEX RANGKA KAYU 5/7

175,80
RANGKA HOLLOW CORE FIN. CAT CLEAR FINISH
KOLOM KAYU 16/16
FIN. POLITUR
PINTU UPVC

RAILING DINDING
STEEL CORE FIN. BATU BATA LAPIS CLEAR POLITUR
FIN. CAT OIL BASED TV

210,00

200,00
LANTAI PAPAN TEBAL 2 CM
FIN. MELAMIK
100,00

20,00 20,00 7,40


180,00 75,00 197,70 165,80

NO. REVISI TANGGAL


IE-07 04 W JUDUL PROYEK
- Scale : 1:50

#Project Name

ARSITEKTUR

PLAFON GYPSUM 12 MM
FIN. CAT EMULTION

78,00
EX. MOWILEX
RANGKA HOLLOW CORE
DINDING PAPAN 2 X 24
RANGKA KAYU 5/7
FIN. CAT CLEAR FINISH STRUKTUR

KACA BENING 5 MM
SLIDING FOLDING DOOR

200,00
KUSEN KAYU KELAS II

MEKANIKAL ELEKTRIKAL
LANTAI PAPAN TEBAL 2 CM
FIN. MELAMIK

DIGAMBAR GUNAWAN
BALOK 6/12
280,00 DIPERIKSA
57,60 60,00 60,00 60,00 60,00 60,00
DISETUJUI
7,40 11,00
358,60
JUDUL GAMBAR SKALA GAMBAR

IE-07 03 S
- Scale : 1:50 GENERAL BEDROOM
1:50
(Lanjutan)

LAYOUT ID HALAMAN JML LEMBAR

ARS-017.5 21 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

985,70
61,50
924,20

G G

249,50
350,00

F F

E E

250,50
845,25
150,00

D D RABAT BETON
PASIR PADAT TEBAL 5 CM
1.156,45

1.156,45
URUGAN SIRTU PADAT

±0,00
175,00

20,00
NO. REVISI TANGGAL
345,25

RABAT BETON
-0,18
C C
JUDUL PROYEK

60,00
292,70

656,45
#Project Name
URUGAN TANAH KEMBALI
B B

75,00
126,95

PAS. PONDASI BATU GUNUNG


ARSITEKTUR

20,00
A A PAS. AANSTAMPING

5,00
PASIR PADAT TEBAL 5 CM
184,25

A1 A1

10,00 10,00 STRUKTUR


60,00
80,00

376,30 178,85 354,30 76,25 P-01 DETAIL PONDASI


- Scale : 1:25
985,70
MEKANIKAL ELEKTRIKAL

1 1a 2 3 4 5 6 7

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

DENAH PONDASI BATU KALI 1:100, 1:25

LAYOUT ID HALAMAN JML LEMBAR

DENAH PONDASI BATU KALI


- Scale : 1:100 ARS-018 22 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

+3,10 +3,10
1 LANTAI 2 1 LANTAI 2

PLAFON GYPSUM
FIN. CAT WEATHERSHIELD

155,00
EX. MOWILEX
RANGKA METAL HOLLOW
TREAD

90,00
PAPAN TEBAL 3 CM
BALOK KAYU
WOOD BASE
315,29

310,00
+1,58 RAILING STAINLESS STEEL
Ø2"

266,80
197,33 117,97

155,00

17,22 3,00
24,67 3,00

±0,00 ±0,00
0 LANTAI 1 0 LANTAI 1

1 1
86,50

UP

2 2
NO. REVISI TANGGAL

61,00 259,20 JUDUL PROYEK


1

192,60
12,00
188,80

2 POTONGAN 2 - 2 #Project Name


- Scale : 1:50
11
18

17

16

15

14

13

12

10

ARSITEKTUR
90,30

STRUKTUR

7,40
+3,10 +3,10
1 LANTAI 2 1 LANTAI 2
50,00

42,60

155,00
MEKANIKAL ELEKTRIKAL
26
3,6
8

307,00
RAILING STAINLESS STEEL
Ø2"

222,00 90,30 DIGAMBAR GUNAWAN

155,00
312,30 DIPERIKSA
0 DISETUJUI
4,6
24
STR-01 DETAIL TANGGA JUDUL GAMBAR SKALA GAMBAR
- Scale : 1:25
±0,00 ±0,00
0 LANTAI 1 0 LANTAI 1

DETAIL TANGGA KAYU 1:25, 1:50

LAYOUT ID HALAMAN JML LEMBAR

225,00 90,30 ARS-019 23 32


1 POTONGAN 1 - 1
- Scale : 1:50 06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

985,20
61,00
175,00 200,00 290,00 259,20

G G
W-2 W-2 W-2 W-2

350,00
F F
W-2 W-2 W-2

UP
NO. REVISI TANGGAL

1
2
3
4
5
6
7
8
9
E E
JUDUL PROYEK

11
18
17
16
15
14
13
12

10
K-1 K-1 W-2
150,00
992,20

D
W-2 W-2
D #Project Name
K-1 K-1 W-2 W-2 W-2
W-1 W-1
179,50

ARSITEKTUR

C C
K-1 K-1
170,50

STRUKTUR
B B
W-2 W-2 W-2
122,20

W-2
20,00

A A
K-1 K-1
W-1 W-1
A1 A1 MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

1 1a 2 3 4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

DENAH STRUKTUR LT. 1 LANTAI 1 RENCANA DENAH


- Scale : 1:100 1:100
STRUKTUR

LAYOUT ID HALAMAN JML LEMBAR

ARS-020 24 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
1 1a 2 3 4 5 6 7 NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

+5,90 +5,90
2 ROOF 2 ROOF

+3,10 +3,10
1 LANTAI 2 1 LANTAI 2

±0,00 ±0,00
0 LANTAI 1 0 LANTAI 1

7,00 61,00
175,00 200,00 164,20 125,80 259,20
NO. REVISI TANGGAL

JUDUL PROYEK

A1 A B C D E F G

#Project Name
1 1a 2 3 4 5 6 7

GRID PORTAL ARAH X GRID G ARSITEKTUR

- Scale : 1:100

+5,90 +5,90
2 ROOF 2 ROOF

STRUKTUR

+3,10 +3,10
1 LANTAI 2 1 LANTAI 2 MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

±0,00 ±0,00 DIPERIKSA


0 LANTAI 1 0 LANTAI 1
DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

PORTAL 1:100

20,00
122,20 170,50 179,50 150,00 100,00 250,00 LAYOUT ID HALAMAN JML LEMBAR

A1 A B C D E F G
ARS-021 25 32
GRID PORTAL ARAH Y GRID 3
- Scale : 1:100 06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

G G
W-2 W-1 W-2 W-1 W-2 W-1 W-2

W-1

W-1

W-1

W-1

W-1
W-1
W-1

W-1

W-1
W-1

W-1
W-1

W-1
F F
W-1 W-2 W-1 W-2 W-1
W-2

W-1 NO. REVISI TANGGAL

W-1

W-1
E E

W-1

W-1

W-1
JUDUL PROYEK

DOWN
K-1 B-1 K-1 W-1 W-2 W-2

W-1
B-1

B-1
W-1

W-1
B-1 W-1 W-1
#Project Name

W-1

W-1

W-1
W-1 W-2 W-2
D D
K-1 K-1 W-1 W-2 W-2 W-2
W-1 W-1

W-1
ARSITEKTUR
W-1

C W-1 C

W-1
K-1 B-I K-1
W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1

W-1
STRUKTUR
B-I

B-I
W-1
B B
W-2 W-2 W-2 W-1

W-1
W-1 B-I
A W-1 A
K-1 K-1
W-1 W-1
A1 A1 MEKANIKAL ELEKTRIKAL

W-1

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

1 1a 2 3 4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

DENAH STRUKTUR LANTAI 2 RENCANA DENAH


- Scale : 1:100 1:100
STRUKTUR

LAYOUT ID HALAMAN JML LEMBAR

ARS-022 26 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

1 1a 2 3 4 5 6 7

G G
W-2 W-2 W-2

F F
W-2 W-2 W-2

NO. REVISI TANGGAL


E E
JUDUL PROYEK
K-1 W-2 W-2

D
W-2 W-2
D #Project Name
K-1 W-2 W-2 W-2
W-1 W-1

ARSITEKTUR

C C
K-1 K-1

STRUKTUR
B B
W-2 W-2

A A
K-1 K-1
W-1 W-1
A1 A1 MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

1 1a 2 3 4 5 6 7 JUDUL GAMBAR SKALA GAMBAR

DENAH STRUKTUR ATAP RENCANA DENAH


- Scale : 1:100 1:100
STRUKTUR

LAYOUT ID HALAMAN JML LEMBAR

ARS-023 27 32
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

2 Ø 12
2 Ø 12 2 Ø 12

20,00

20,00

20,00
Ø 6 - 15 Ø 6 - 15 Ø 6 - 15

2 Ø 12 2 Ø 12
2 Ø 12
15,00 15,00
20,00

KOLOM TYPE K-1 BALOK SLOOF TYPE S-1 BALOK TYPE S-1
SKALA. 1:25 SKALA. 1:25 SKALA. 1:25

15,00
90,00

Ø 10 - 15
Ø 10 - 15
35,00 20,00 35,00
35,00

Ø 10 - 15

277,70
Ø 10 - 15
90,00
20,00

A A NO. REVISI TANGGAL

JUDUL PROYEK
35,00

#Project Name
6 Ø 10

15,00
6 Ø 10

15,00 15,00 ARSITEKTUR


150,40

8,00 12,00
15,00 15,00
150,40
STRUKTUR

WD-003 DETAIL PLAT LANTAI


- Scale : 1:50
170,00

MEKANIKAL ELEKTRIKAL
208,00

KOLOM K-1

DIGAMBAR GUNAWAN

6 Ø 10 DIPERIKSA

6 Ø 10 DISETUJUI

JUDUL GAMBAR SKALA GAMBAR


30,00

2Ø8
3,00 5,00

DETAIL PENULANGAN
1:25, 1:50
STRUKTUR
LANTAI KERJA BETON K 100
TEBAL 50 MM
PASIR PADAT TEBAL 30 MM

10,00 10,00 LAYOUT ID HALAMAN JML LEMBAR


90,00

32
110,00
ARS-024 28
DETAIL PONDASI PLAT
- Scale : 1:25 06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

2 2

3
2 KITCHEN BEDROOM BEDROOM
FLOORBOARD FLOORBOARD
GRANIT 40x40
BEDROOM FFL: ±0,00
FFL: ±0,00 FFL: ±0,00
GRANIT 40x40
FFL: ±0,00

DINING ROOM
GRANIT 40x40
FFL: ±0,00

UP

DOWN
1
2
3
4
5
6
7
8
9
BATHROOM FOYER
GRANIT 20x20 FLOORBOARD

11
18
17
16
15
14
13
12

10
FFL: ±0,00 FFL: ±0,00
BATHROOM
GRANIT 20x20
FFL: ±0,00
2 MINI KITCHEN

2 3 2

2
2
3 BEDROOM
2

FLOORBOARD
RG. KELUARGA FFL: ±0,00
GRANIT 40x40
FFL: ±0,00
BEDROOM
BEDROOM FLOORBOARD
GRANIT 40x40 FFL: ±0,00
FFL: ±0,00

2 BATHROOM NO. REVISI TANGGAL


BATHROOM GRANIT 20x20
GRANIT 20x20 FFL: ±0,00 JUDUL PROYEK
FFL: ±0,00
BALKON
GRANIT 40x40
FFL: ±0,00

#Project Name
WD-07
TYPICAL RG. TIDUR UTAMA
TERAS BALKON
GRANIT 40x40 GRANIT 40x40
FFL: ±0,00 FFL: ±0,00 ARSITEKTUR

RENCANA TITIK LAMPU LT. 1 RENCANA TITIK LAMPU LT. 2


- Scale : 1:100 STRUKTUR
- Scale : 1:100

MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

ID 3D Left Side View Symbol Description Quantity DIPERIKSA


DISETUJUI
CL-02 1
JUDUL GAMBAR SKALA GAMBAR
Symbol Description Quantity

10A 1-gang power point 4


CL-03 4
RENCANA ELEKTRIKAL 1:100, 1:1
10A 1-gang switch 13

LED 1x13 WATT 12


2 10A 2-gang power point 6
LAYOUT ID HALAMAN JML LEMBAR
3 10A 3-gang power point 3
WL 3

2 10A split switch 4


ARS-025 29 32
WL-02 1
TV antenna jack point. 1 06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

KITCHEN BEDROOM BEDROOM


GRANIT 40x40
BEDROOM FLOORBOARD FLOORBOARD
FFL: ±0,00
GRANIT 40x40 FFL: ±0,00 FFL: ±0,00
FFL: ±0,00

DINING ROOM
GRANIT 40x40
FFL: ±0,00

UP

DOWN
1
2
3
4
5
6
7
8
9
BATHROOM FOYER

11
18
17
16
15
14
13
12

10
GRANIT 20x20 FLOORBOARD
BATHROOM FFL: ±0,00 FFL: ±0,00
GRANIT 20x20
FFL: ±0,00 MINI KITCHEN

BEDROOM
RG. KELUARGA FLOORBOARD
GRANIT 40x40 FFL: ±0,00
FFL: ±0,00

BEDROOM BEDROOM
GRANIT 40x40 FLOORBOARD
FFL: ±0,00 FFL: ±0,00
NO. REVISI TANGGAL

BATHROOM BATHROOM JUDUL PROYEK


GRANIT 20x20 GRANIT 20x20
FFL: ±0,00 FFL: ±0,00

BALKON
GRANIT 40x40

#Project Name
FFL: ±0,00

WD-07
TYPICAL RG. TIDUR UTAMA
TERAS ARSITEKTUR
BALKON
GRANIT 40x40
GRANIT 40x40
FFL: ±0,00
FFL: ±0,00

STRUKTUR
RENCANA DENAH INSTALASI PIPA LT. 1 RENCANA DENAH INSTALASI PIPA LT. 2
- Scale : 1:100 - Scale : 1:100
Mekanikal Plumbing
Name 2D Symbol Quantity

BASIN 1

MEKANIKAL ELEKTRIKAL

FLOOR DRAIN 4

RL-23 2
DIGAMBAR GUNAWAN
MP MEP Wye Schedules
DIPERIKSA
MEP System Preview Picture Quantity
SHOWER CABIN 1 DISETUJUI

| Limbah Cair 2 JUDUL GAMBAR SKALA GAMBAR

MP Mekanikal Bend tyee Bend Schedules SHOWER KIT 2

MEP System Preview Picture Quantity MEP System Preview Picture Quantity RENCANA MEKANIKAL
1:100, 1:2, 1:1
PLUMBING
| Limbah Cair 1 | Limbah Cair 13 SINK 1 1

LAYOUT ID HALAMAN JML LEMBAR

| Limbah Padat 2 | Limbah Padat 11 SINK 2 1

ARS-026 30 32
| Saluran Air Bersih 9 | Saluran Air Bersih 66 WATER CLOSED 4

06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
COPYRIGHT
100,00 NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
12,50 TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
15,00 12,50 45,00 15,00 WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

B
SIRKULASI UDARA Ø 3/4"
LUBANG KONTROL HANDLE BESI BETON Ø 10 MM
SIRKULASI UDARA PVC Ø 3/4"
PVC Ø 4"

5,00
175,00 PVC Ø 4" IJUK TEBAL 10 CM

10,00
15,00 100,00 15,00 30,00 15,00 PEMERINTAH
20,00 30,00 20,00 KABUPATEN LUWU TIMUR

C
120,00

15,00
10,00 45,00 10,00 100,00 10,00 DINAS PERUMAHAN, KAWASAN PERMUKIMAN
25,00 MUKA AIR MAXIMUM DAN PERTANAHAN

10,00
12,50

10,00
PVC Ø 4"
PROPINSI SULAWESI SELATAN

155,00
100,00
70,00

128,60
A

45,00

25,00

75,00
A Kabupaten Luwu Timur

55,00
Kecamatan Wotu
-

12,50

10,00
15,00

Volume

10,00
Pekerjaan :

15,82
15,00 145,00 15,00 55,00 10,00 100,00 10,00
175,00

C
GAMBAR RENCANA
PEMBANGUNAN RUMAH DINAS
LUBANG KONTROL
KEJAKSAAN NEGERI LUTIM
B

15,00 70,00 15,00


100,00 Lokasi : Kec.Wotu

DENAH SEPTIC TANK Perencana :


- 1:25 POTONGAN B - B
COMMANDITAIRE-VENNOOSCHAP
- 1:25
CV. BINTANG SEMBILAN TIMUR RAYA
KONSULTAN PERENCANA,PENGAWASAN
NO. REVISI TANGGAL

JUDUL PROYEK

LUBANG KONTROL SIRKULASI UDARA PVC Ø 3/4"


PINTU KONTROL PINTU KONTROL
PVC Ø 4"
PVC Ø 4" TANAH URUG #Project Name
120,00 FEBRIANTY ARIEF, ST.
7,50 45,00 70,00 45,00 7,50 10,00 45,00 60,00 60,00 Team Leader
ARSITEKTUR
HANDLE BESI BETON Ø 10 MM Diperiksa/ Disetujui :

33,50
45,00 PEJABAT PEMBUAT KOMITMEN
15,00 15,00 15,00 (PPK)
10,00

10,00 10,00

12,40
56,20

HANDLE BESI BETON Ø 10 MM


46,20

5,00
STRUKTUR
MUKA AIR MAXIMUM

10,00
7,32
5,10
105,00
133,23

10,00
145,00

PVC Ø 4"
130,00

38,80

MUHAMMAD YUSUF, ST
SLOPE 0,2 % NIP : 19910102 201503 1 003
175,00

85,00
PVC Ø 4"

MEKANIKAL ELEKTRIKAL
88,80

KERIKIL Diketahui :
IJUK TEBAL 10 CM

84,00
10,00

KEPALA DINAS
SLOPE 0,5 % PERUMAHAN, KAWASAN PERMUKIMAN DAN
PERTANAHAN
112,5
4 KAB. LUWU TIMUR

10,00
20,00
15,00 15,00

15,00 15,00 15,00 DIGAMBAR GUNAWAN


10,00

45,00
14° DIPERIKSA
10,00 15,00 30,00 10,00 100,00 10,00
DISETUJUI

POTONGAN C - C JUDUL GAMBAR SKALA GAMBAR


15,00 100,00 15,00 30,00 15,00
175,00 - 1:25 Ir. H. ZAINUDDIN, M.S.i
NIP. 19631010 199303 1 016

RENCANA SEPTIC TANK 1:1


Nama Gambar Skala Gambar

POTONGAN A - A
- 1:25 LAYOUTSEPTIC
RENCANA ID HALAMAN
TANK JML LEMBAR
1:100

ARS-027
ID Gambar 31
No. Gambar
32
Jumlah Gambar

GSPublisherEngine 0.0.100.100
ARS-018 18
18
06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100
GSPublisherEngine 0.0.100.100
COPYRIGHT
NO PART OF THIS DOCUMENT MAY BE REPRODUCED,
TRANSMITTED, OR RECORDED IN ANY FORM OF OTHERWISE
WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECTS.

NO. REVISI TANGGAL

JUDUL PROYEK

GENERIC PERSPECTIVE STRUKTUR


- -
#Project Name

ARSITEKTUR

STRUKTUR

MEKANIKAL ELEKTRIKAL

DIGAMBAR GUNAWAN

DIPERIKSA

DISETUJUI

JUDUL GAMBAR SKALA GAMBAR

3D VIEW 1:500, 1:250

LAYOUT ID HALAMAN JML LEMBAR

MEKANIKAL PLUMBING ARS-028 32 32


-

06 Oktober 2017D:\Data Project\220. PT. KASMAR\WOOD + COMPOSITE MODEL.pln

GSPublisherEngine 0.0.100.100

You might also like