Professional Documents
Culture Documents
Method Statement For Diesel Generator
Method Statement For Diesel Generator
12
METHOD STATEMENT OF DIESEL Yay. Tarihi 18.07.2011
Rev. No. 00
GENERATOR
Rev. Tarihi --
KESİR MÜHENDİSLİK ELEKTRİK LTD ŞTİ. Sayfa No: 1/6
Contents
1. Purpose.................................................................................................................................... 2
2. Scope ....................................................................................................................................... 2
3. Definitions............................................................................................................................... 2
4. References ............................................................................................................................... 2
5. Responsibilities ....................................................................................................................... 2
5.1. Site Manager: ................................................................................................................... 2
5.2. Site Engineer: ................................................................................................................... 2
5.3. HSE Manager from PPR: ................................................................................................. 3
5.4. Supervising Engineer: ...................................................................................................... 3
6. IMPLEMENTATION ............................................................................................................. 3
6.1. General ............................................................................................................................. 3
6.2. Equipment List ................................................................................................................. 3
6.3. Transport, Storage ............................................................................................................ 4
6.4. Preparing Element Prior to Installation ...........................Error! Bookmark not defined.
6.3.1. Elements Cutting and Welding ....................................Error! Bookmark not defined.
6.5. Installation ........................................................................................................................ 4
7. HSE ......................................................................................................................................... 4
7.1. Personal protective equipment ......................................................................................... 4
7.2. Machinery......................................................................................................................... 4
7.3. Lifting operations ............................................................................................................. 4
7.4. Access and housekeeping ................................................................................................. 5
7.5. Manual handling ............................................................................................................... 5
7.6. Restriction ........................................................................................................................ 5
7.7. Fire prevention and protection ......................................................................................... 6
7.8. Emergency response ......................................................................................................... 6
1. Purpose
Purpose of this method statement is to define the sequence of GCB installation and safe execution of the
job.
2. Scope
The procedure applies for Diesel Generator transportation, handling, and installation at Electrical
Building where these activities will be performed.
3. Definitions
DG: Diesel Generator
4. References
Project HSE Manual
Drawings and design details
5. Responsibilities
5.1. Site Manager:
5.1.1. SM is the first responsible point to follow this procedure,
5.1.2. In cases when the staff do not apply or do not fulfill requirement of this
procedure SM will do required actions such as to inform people who are
unaware, to supply right material, machinery and equipment and/or to ensure
specific training to improve team’s ability.
5.1.3. To revise this procedure if it is necessary.
5.1.4. To assign responsible engineers and foremen, to coordinate all activities
5.1.5. To ensure training, informing and updating people who work to apply this
procedure regardless their position,
5.1.6. To coordinate with PPR.
5.2.6. To identify existing and predictable hazards or working conditions that are
hazardous, unsanitary, or dangerous to employees,
5.2.7. To take prompt corrective measures to eliminate or control hazards and
conditions.
5.2.8. To coordinate with Supervising Engineer from PPR.
5.2.9. To ensure that the staff involved in the activities has read and understand the
method statement.
5.2.10. To brief the staff involved about the healthy and safe performance of all
activities (toolbox talks).
5.2.11. To receive and/or define all standards including this Method Statement,
5.2.12. To obtain all the necessary standards,
5.2.13. To ensure maintenance compliance with this method statement.
6. IMPLEMENTATION
6.1. General
Energy is produced for Aux. Systems by DG.
Crane
Hand tools
6.4. Installation
Installation will be carried out in accordance with the last approved revision of the installation
projects. Request form for materials will be prepared. At the working area, DG will be placed in
a way that will not prevent safe access and egress. The assembly drawings will be checked on the
place of installation. Support of DG will be installed. DG will be lifted to place in accordance to
lifting operation section 7.3, crane will be used by competent person. DG will be placed and
installed in accordance to projects. According to the projects, grounding will be made after DG
erection will be done. After the works is done daily, working areas will be cleaned.
7. HSE
7.1. Personal protective equipment
PPE will be provided and used in accordance with the Project HSE Manual. Helmet, safety
glasses, high visibility vest, and safety shoes will be used at all the times. When personnel will
work at high places, they must use safety harnesses.
When work in dusty environment personnel will use dust protective half masks.
Hearing protection will be used where exposure levels exceed 85 dB.
7.2. Machinery
All machinery, equipment and tools will be maintained in good working order; will be inspected
regularly and color coded; and will be operated by competent persons. All necessary measures
will be in place in order to prevent environmental pollution. Guards will be in place to protect
workers from moving parts. Electrical tools will be double insulated and grounded connected to
ground fault circuit interrupters (GFCI).
All vehicles will have backing warning device. Banks man will guide vehicles in narrow work
places and when reversing. Vehicles will not pass, will not be positioned or parked close to
excavation edges.
Cranes will be set on even flat ground. Pads will be used under the outriggers feet where
necessary.
When work is close to excavation the lifting equipment will be positioned away from the
excavation edge according to the soil type and the weather conditions, in order to prevent earth
collapse. Working limits of the lifting equipment stipulated by the manufacturer will not be
exceeded. All lifting equipment will be stored in closed area away from wet and direct sunlight.
Lifting of DG will be carried out only with fabric slings with the proper safe working load limit.
The slings will be inspected and color-coded. Lifting operation shall be segregated from other
persons on site. All personnel and third parties will be kept out of any area where they might be
struck or crushed by a load or lifting equipment if it swings, shifts or falls. Operators of lifting
equipment will be able to see the full path of the load or have a signaler with an appropriate
means of communication to guide them. Operator will obey an emergency stop signal at all
times, no matter who gives it. The operator will not leave the operating controls while the load is
suspended.
Taglines will be used all time, it refers to load to be guided and controlled. Lifting equipment will
not be used in the open air where weather conditions could affect the integrity of the equipment or
expose persons to danger.
7.6. Restriction
No food or beverages to be consumed at jobsite
No smoking
No work without permit
List of attachments:
1. List of the staff involved in the job
2. Toolbox attendance sheet
3. Risk Assessment
4. Lifting Plan