Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 14

PART

ITEM
DESCRIPTION /
NO.
NUMBER

CORPO GRUPPO LAMA


1 COMPATTO DISTANZA
LAMA 55 OFFSET 74

2
PART IMAGE IF ANY
DENSITY CNC
MATL QTY.
(KG/M3) LATHE

8 1

8 1
MACHINING OPERA

CNC CONV. CONV.


DRILLING
MILLING MILLING LATHE

6
NING OPERATION
HEAT
WC/SPAR BENCH
CG TREATME
K WORK
NT
RAW MATERIAL (m

PLATING DIA THICKNESS

Dia 10 60

Block
Block
Dia
MATERIAL (mm)

WIDTH LENGTH WEIGHT (KG)

70 90 #NAME?

OPERATIONS
CNC Lathe
CNC Milling
Conv. Milling
Conv.Lathe
Drilling
CG
Sparking/Wire cutting
Bench work
Heat treatment
surface plating
CMM/ Hour
MATERIAL
MATERIAL COST /PART
COST/KG CONSIDERING
30% REJECTION

400 #NAME?

400 0

PER HR. COST


300
500
200
200
100
200
250
100
60

1000
MACHINING INSPECTION (CMM) (3
COST/PART HRS/PART)

3000 3000

3000 3000
SPL. TOOL/FIXTURES
COST (REAMER, PLUG UNIT COST
GAUGE)

1000 #NAME?

4000 10000
OTHER OVER HEADS
EG:TRANSPORTATION, UNIT PRICE
PACKING

You might also like