Boq Boring Dan Sondir Kantor

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KOP CV/PT (JIKA PERUSAHAAN)

RENCANAN SONDIR & BORING KANTOR BPR DAN GUDANG DI SENTANI

Spesifikasi : Sondir 2.5 Ton = 9 Titik


Deep Boring 120 m = 2 Titik
UNIT PRICE AMOUNT
No ITEM PEKERJAAN UNIT QTY
(RP.) (RP.)

1 Transport alat ( Jayapura - Sentani PP ) pp 2 Rp -


2 Transport lokal ls 1 Rp -
3 Fee For Supervision ls 1 Rp -
Sub Total I Rp -

4 PERLENGKAPAN DAN UPAH


4,1 survey lokasi borring dan sondir ls 1 Rp -
4,2 setting alat bor 4 titik titik 2 Rp -
4,3 setting alat sondir titik 9 Rp -
4,4 borring @ 30 meter x 2 titik m 60 Rp -
4,5 Standart Penetration Test (SPT ) kali 30 Rp -
4,6 U.D Sampling @ 4 sample x 2 titik sample 8 Rp -
4,7 penyondiran titik 9 Rp -
4,8 Core Box, tabung sample, BBM dan Pengiriman sample ke lab titik 2 Rp -
Sub Total II Rp -

5 LABORATORIUM MEKTAN
5,1 Index Properties set 8 Rp -
-Natural Moisture Content
-Spesific Grafity
-Atterberg Limit (Plastik Limit & Liquid Limit)
-Density Test/ Unit Weight
-Grain size distribution
5,2 Engineering Properties set 8 Rp -
-Consolidation Test
-Direct Shear Test
Sub Total III Rp -

6 LAPORAN
6,1 Analisa Laporan & Recomendasi pondasi
a Analisa Laporan & Recomendasi pondasi (boring) titik 2 Rp -
b Analisa Laporan & Recomendasi pondasi (sondir) titik 9 Rp -
Sub Total IV Rp -
TOTAL HARGA Rp -
PPN 10 %
JUMLAH TOTAL Rp -

catatan : belum termasuk pajak


Jayapura, …………………….
Pelaksana

nama lengkap (CV / PT)