PERHITUNGAN JAM ALAT

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat

A Persiapan
1 Jalan Eksisting 12 km
a Pengukuran
Long Section WP 800 m' 1 hr 14.88 hr
Cross Section TS 25 m' 10 1 hr 47.60 hr
Material Gelam
Long 50 m' 1 m 238 btg
1190 btg
Cross 25 m' 0.5 m 4 btg 952 btg
Paku 119 kg
Upah
Juru Ukur 1 org 3.00 bln
Pembantu Juru Ukur 3 org 9.00 bln

b Pembentukan Badan Jalan 83,300 m2 Grader 350 m'/hr,lebar jln 7m 2450 m2/hr 350 m2/jm 1 unit 238.00 jm 0.0029 jm/m3
Vibro 300 m'/hr,lebar jln 7m 2100 m2/hr 300 m2/jm 1 unit 277.67 jm 0.0033 jm/m3

c Subbase course 26,400 m3 Grader 350 m'@3.5m' t=20cm 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 431.02 jm 0.0163 jm/m3
(Jam kerja alat 1 bln=200 jm) Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 502.86 jm 0.0190 jm/m3
WT Kap.mengikuti Vibro 52.50 m3/jm 1 unit 502.86 jm 0.0190 jm/m3

d Base course 9,900 m3 Grader 350 m'@3.5m' t=15cm 1225 m2/jm 4 pass 0.15 m 45.94 m3/jm 1 unit 215.51 jm 0.0218 jm/m3
(Jam kerja alat 1 bln=200 jm) Vibro 300 m' @ 3.5m' ,t=15cm 1050 m2/jm 4 pass 0.15 m 39.38 m3/jm 1 unit 251.43 jm 0.0254 jm/m3
WT Kap.mengikuti Vibro 39.38 m3/jm 1 unit 251.43 jm 0.0254 jm/m3

1 unit

e Penetration Macadam 44,000 m2 TWR 300 m' @ 3.5m' 1050 m2/jm 3 pass 350.00 m2/jm 1 unit 125.71 jm 0.002857 jm/m2
Batu 5/7 1 m 1.2 m 0.07 m 0.084 m3
Batu 2/3 1 m 1.2 m 0.03 m 0.036 m3
Batu 1/1 1 m 1.2 m 0.01 m 0.012 m3
Pasir 0.015 m3
Aspal 10 liter

f Saluran kiri/kanan
g Pemeliharaan Jalan 12 bln

2 Perbaikan Jembatan
a Jembatan Bentang 50m Class B 1 bh
b Plat Deck 1 set
c Tulangan Ø12 60kg/m3 5,100 kg
d Beton K350 85 m3
Page 2 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
B Road Construction
1 Clearing & Grubbing 178,569 m2 t=20cm 35713.80 m3
(jam kerja alat 1 hari = 7 jm) Dozer 3 hari @ 1 Ha(10.000m2) 476.19048 m2/jm 0.2 m 95.24 m3/jm 1 unit 374.99 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 595.23 jm 0.0033 jm/m2

2 Common Soil 376,078 m3


Galian daerah datar (80%) 300,862 m3 Dozer Kap.Dozer 95.20 m3/jm 95.2 m3/jm 95.2 m3/jm 1 unit 3,160.32 jm 0.0084 jm/m3

Galian tebing (Triming) (20%) 75,216 m3 Excav Kap.Excav 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,253.59 jm 0.0033 jm/m3

Loading to DT 376,078 m3 Excav Kap.Excav 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 6,267.97 jm 0.0167 jm/m3

3 Weathered Rock 11,806 m3 Excav Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 236.12 jm 0.0200 jm/m3
Exc.Breaker Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 236.12 jm 0.0200 jm/m3

4 Embankment 50,673 m3
a Embankment (0-100) 36,329 m3 Vib.SF Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 807.32 jm 0.022222 jm/m3
WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 807.32 jm 0.022222 jm/m3

b Embankment (100-600) 14,345 m3 Vib.SF Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 318.77 jm 0.022222 jm/m3
Grader 350 m'@3.5m' t=20cm 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 234.20 jm 0.0089 jm/m3
WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 318.77 jm 0.022222 jm/m3
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 239.08 jm 0.016667 jm/m2
DT jarak angkut ± 300 m' 79 m3/jm 79 m3/jm 1 unit 181.58 jm 0.012658 jm/m2
Kapasitas 1 DT, 8 m3
0.3 km
t1(wkt berangkat) 0.010 jm
30 km/jm

0.3 km
t2(wkt pulang) 0.008 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.101 jm 6.05 mnt

60 mnt
1 jam kerja DT 8 m3 79.34 m3/jm
6.05 mnt
Asumsi rata-rata Kapasitas angkut DT 79 m3/jm

5 Bench cut 6,362 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 106 jm 0.016667 jm/m2
Page 3 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
6 Disposal 372,925 m3 Excav jarak angkut ± 5 km 21 m3/jm 21 m3/jm 1 unit 17,758 jm 0.0476 jm/m3
(clearing+excavation-embankment) DT Kapasitas 1 DT, 8 m3
5 km
t1(wkt berangkat) 0.167 jm
30 km/jm

5 km
t2(wkt pulang) 0.125 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.375 jm 22.50 mnt

60 mnt
1 jam kerja DT 8 m3 21.33 m3/jm
22.50 mnt
Asumsi rata-rata Kapasitas angkut DT 21 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.2 m3/jm 95.2 m3/jm 1 unit 3,917 jm 0.0105 jm/m3

6 Riprap (Ditch), U type & V type 10,777 m3 Molen

7 Pavement
a Penetration Macadam 102,761 m2 TWR 300 m' @ 3.5m' 1050 m2/jm 3 pass 350.00 m2/jm 1 unit 294 jm 0.002857 jm/m2
Batu 5/7 1 m 1.2 m 0.07 m 0.084 m3
Batu 2/3 1 m 1.2 m 0.03 m 0.036 m3
Batu 1/1 1 m 1.2 m 0.01 m 0.012 m3
Pasir 0.015 m3
Aspal 10 liter

b Base Coarse 15,414 m3 Grader 350 m'@3.5m' (4pass) 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 252 jm 0.0163 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 294 jm 0.0190 jm/m3
WT Kap.mengikuti Vibro 52.50 m3/jm 1 unit 294 jm 0.0190 jm/m3

c Subbase coarse 41,104 m3 Grader 350 m'@3.5m' (4pass) 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 671 jm 0.016327 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 783 jm 0.019048 jm/m3
WT Kap.mengikuti Vibro 52.50 m3/jm 1 unit 783 jm 0.019048 jm/m3

C Intake Weir
1 Clearing & Grubbing 22,899 m2 t=20cm 4579.80 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19048 m2/jm 0.2 m 95.24 m3/jm 1 unit 48 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 76 jm 0.0033 jm/m2

2 Common Soil 157,927 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 2,632 jm 0.016667 jm/m3
Loading m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 2,632 jm 0.016667 jm/m3

3 Weathered Rock 48,283 m3 Ex+JH Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 966 jm 0.02 jm/m3

4 Weak Rock 5,714 m3 Ex+JH Kap. Alat 40 m3/jm 30 m3/jm 30 m3/jm 1 unit 190 jm 0.03333 jm/m3
Page 4 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
5 Backfill 9,257 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 154 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 176 jm 0.019048 jm/m3

6 Disposal 207,247 m3 DT jarak angkut ± 500 m 71 m3/jm 71 m3/jm 1 unit 2,919 jm 0.0141 jm/m3
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
0.5 km
t1(wkt berangkat) 0.017 jm
30 km/jm

0.5 km
t2(wkt pulang) 0.013 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.113 jm 6.75 mnt

60 mnt
1 jam kerja DT 8 m3 71.11 m3/jm
6.75 mnt
Asumsi rata-rata Kapasitas angkut DT 71 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.2 m3/jm 95.2 m3/jm 1 unit 2,177 jm 0.0105 jm/m3

D Intake
1 Backfill 7,460 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 124 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 142 jm 0.019048 jm/m3

E Diversion Works
1 Perataan (include Disposal) 2,866,053 m3 Dozer

1 Common Soil 339,167 m3 Vibro Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 7,537 jm 0.022222 jm/m3
(Embankment with compaction) WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 7,537 jm 0.022222 jm/m3

2 Embankment 2,526,886 m3 Vibro Kap. Alat 45 m3/jm 45 m3/jm 45 jm 1 unit 56,153 jm 0.0222 jm/m3
(With Compaction) WT Kap. Alat 45 m3/jm 45 m3/jm 45 jm 1 unit 56,153 jm 0.0222 jm/m3

F Connecting Channel
1 Common Soil 75 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1 jm 0.016667 jm/m3
DT jarak angkut ± 0.5 km 71 m3/jm 71 m3/jm 1 unit 1 jm 0.014085 jm/m3
Page 5 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
G Sandtrap
1 Clearing & Grubbing 22,899 m2 t=20cm 4579.80 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19048 m2/jm 0.2 m 95.24 m3/jm 1 unit 48 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 76 jm 0.0033 jm/m2

2 Common Soil 106,060 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,768 jm 0.0167 jm/m3
Loading m3 Excav Kap. Alat 60 m3/jm 0 m3/jm 60 m3/jm 1 unit 1,768 jm 0.0167 jm/m3

3 Weathered Rock 66,278 m3 Ex+JH Kap. Alat 60 m3/jm 50 m3/jm 50 m3/jm 1 unit 1,326 jm 0.0200 jm/m3

4 Weak Rock 36,989 m3 Ex+JH Kap. Alat 60 m3/jm 30 m3/jm 30 m3/jm 1 unit 1,233 jm 0.0333 jm/m3

5 Backfill 13,968 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 233 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 266 jm 0.019048 jm/m3

6 Disposal 199,939 m3 DT jarak angkut ± 1 km 56 m3/jm 56 m3/jm 1 unit 3,570 jm 0.0179 jm/m3
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
1 km
t1(wkt berangkat) 0.033 jm
30 km/jm

1 km
t2(wkt pulang) 0.025 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.142 jm 8.50 mnt

60 mnt
1 jam kerja DT 8 m3 56.47 m3/jm
8.50 mnt
Asumsi rata-rata Kapasitas angkut DT 56 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.20 m3/jm 95.2 m3/jm 1 unit 2,100 jm 0.0105 jm/m3
Page 6 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
H Waterway
1 Clearing & Grubbing 390,801 m2 t=20cm 78160.20 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19048 m2/jm 0.2 m 95.24 m3/jm 1 unit 821 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,303 jm 0.003333 jm/m2

2 Common Soil 2,751,729 m3 Excav


Galian daerah datar (80%) 2,201,383 m3 Dozer Kap.Dozer 95.20 m3/jm 95.2 m3/jm 95.2 m3/jm 1 unit 23,124 jm 0.008403 jm/m3

Galian tebing (Triming) (20%) 550,346 m3 Excav Kap.Excav 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 9,172 jm 0.003333 jm/m3

Loading to DT 2,751,729 m3 Excav Kap.Excav 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 45,862 jm 0.016667 jm/m3

3 Weathered Rock 279,023 m3 Ex+JH Kap. Alat 60 m3/jm 50 m3/jm 50 m3/jm 1 unit 5,580 jm 0.02000 jm/m3

4 Embankment 652,725 m3
a Embankment (0-100) 60,503 m3 Vib.SF Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 1,345 jm 0.022222 jm/m3
WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 1,345 jm 0.022222 jm/m3

b Embankment (100-600) 99,915 m3 Vib.SF Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 2,220 jm 0.022222 jm/m3
Grader 350 m'@3.5m' t=20cm 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 1,631 jm 0.016327 jm/m3
WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 2,220 jm 0.022222 jm/m3
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,665 jm 0.016667 jm/m2
DT jarak angkut ± 300 m' 79 m3/jm 79 m3/jm 1 unit 1,265 jm 0.012658 jm/m2
Kapasitas 1 DT, 8 m3
0.3 km
t1(wkt berangkat) 0.010 jm
30 km/jm

0.3 km
t2(wkt pulang) 0.008 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.101 jm 6.05 mnt

60 mnt
1 jam kerja DT 8 m3 79.34 m3/jm
6.05 mnt
Asumsi rata-rata Kapasitas angkut DT 79 m3/jm

c Embankment (1Km-3Km) 492,307 m3 Vib.SF Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 10,940 jm 0.022222 jm/m3
Grader 350 m'@3.5m' t=20cm 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 8,038 jm 0.016327 jm/m3
WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 10,940 jm 0.022222 jm/m3
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 8,205 jm 0.016667 jm/m2
DT jarak angkut ± 2 Km 40 m3/jm 40 m3/jm 1 unit 12,308 jm 0.025 jm/m2

5 Backfill 30,864 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 514 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 588 jm 0.019048 jm/m3

6 Bench cut 23,173 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 jm 1 unit 386 jm 0.016667 jm/m3
Page 7 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
7 Disposal 2,448,496 m3 DT jarak angkut ± 2 km 40 m3/jm 40 m3/jm 1 unit 61,212 jm 0.0250 jm/m2
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
2 km
t1(wkt berangkat) 0.067 jm
30 km/jm

2 km
t2(wkt pulang) 0.050 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.200 jm 12.00 mnt

60 mnt
1 jam kerja DT 8 m3 40 m3/jm
12.00 mnt
Asumsi rata-rata Kapasitas angkut DT 40 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.20 m3/jm 95.2 m3/jm 1 unit 25,719 jm 0.0105 jm/m3

I Side Channel tidak ada pekerjaan tanah

J Headtank
1 Clearing & Grubbing 5,910 m2 t=20cm 1182.00 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19 m2/jm 0.2 m 95.24 m3/jm 1 unit 12 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 20 jm 0.003333 jm/m2

2 Common Soil 68,005 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,133 jm 0.0167 jm/m3

3 Weathered Rock 10,702 m3 Ex+JH Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 214 jm 0.0200 jm/m3

4 Weak Rock 617 m3 Ex+JH Kap. Alat 40 m3/jm 30 m3/jm 30 m3/jm 1 unit 21 jm 0.0333 jm/m3

5 Backfill 16,127 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 269 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 307 jm 0.019048 jm/m3

6 Disposal 64,379 m3 DT jarak angkut ± 8 km 14 m3/jm 14 m3/jm 1 unit 4,599 jm 0.0714 jm/m2
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
8 km
t1(wkt berangkat) 0.267 jm
30 km/jm

8 km
t2(wkt pulang) 0.200 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.550 jm 33.00 mnt


Page 8 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
60 mnt
1 jam kerja DT 8 m3 14.55 m3/jm
33.00 mnt
Asumsi rata-rata Kapasitas angkut DT 14 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.20 m3/jm 95.2 m3/jm 1 unit 676 jm 0.0105 jm/m3

K Penstock
1 Clearing & Grubbing 59,563 m2 t=20cm 11912.60 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19 m2/jm 0.2 m 95.24 m3/jm 1 unit 125 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 199 jm 0.003333 jm/m2

2 Common Soil 1,156,794 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 19,280 jm 0.0167 jm/m3

3 Weathered Rock 88,190 m3 Ex+Brek Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 1,764 jm 0.0200 jm/m3

4 Weak Rock 18,508 m3 Ex+Brek Kap. Alat 40 m3/jm 30 m3/jm 30 m3/jm 1 unit 617 jm 0.0333 jm/m3

5 Backfill 136,333 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 2,272 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 2,597 jm 0.019048 jm/m3

6 Disposal 1,139,072 m3 DT jarak angkut ± 8 km 14 m3/jm 14 m3/jm 1 unit 81,362 jm 0.0714 jm/m2
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
8 km
t1(wkt berangkat) 0.267 jm
30 km/jm

8 km
t2(wkt pulang) 0.200 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.550 jm 33.00 mnt

60 mnt
1 jam kerja DT 8 m3 14.55 m3/jm
33.00 mnt
Asumsi rata-rata Kapasitas angkut DT 14 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.20 m3/jm 95.2 m3/jm 1 unit 11,965 jm 0.0105 jm/m3

L Power House
1 Clearing & Grubbing 12,186 m2 t=20cm 2437.20 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19 m2/jm 0.2 m 95.24 m3/jm 1 unit 26 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 41 jm 0.003333 jm/m2

2 Common Soil 114,426 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,907 jm 0.0167 jm/m3

3 Weathered Rock 10,736 m3 Ex+JH Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 215 jm 0.0200 jm/m3
Page 9 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
4 Weak Rock 9,911 m3 Ex+JH Kap. Alat 40 m3/jm 30 m3/jm 30 m3/jm 1 unit 330 jm 0.0333 jm/m3

5 Backfill 8,493 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 142 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 162 jm 0.019048 jm/m3

6 Disposal 129,017 m3 DT jarak angkut ± 8.5 km 13 m3/jm 13 m3/jm 1 unit 9,924 jm 0.0769 jm/m2
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
8.5 km
t1(wkt berangkat) 0.283 jm
30 km/jm

8.5 km
t2(wkt pulang) 0.213 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.579 jm 34.75 mnt

60 mnt
1 jam kerja DT 8 m3 13.81 m3/jm
34.75 mnt
Asumsi rata-rata Kapasitas angkut DT 13 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.20 m3/jm 95.2 m3/jm 1 unit 1,355 jm 0.0105 jm/m3

7 Pavement
a Penetration Macadam 2,690 m2 TWR 300 m' @ 3.5m' 1050 m2/jm 3 pass 350.00 m2/jm 1 unit 8 jm 0.002857 jm/m2
Batu 5/7 1 m 1.2 m 0.07 m 0.084 m3
Batu 2/3 1 m 1.2 m 0.03 m 0.036 m3
Batu 1/1 1 m 1.2 m 0.01 m 0.012 m3
Pasir 0.015 m3
Aspal 10 liter

b Base Coarse 404 m3 Grader 350 m'@3.5m' (4pass) 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 252 jm 0.0163 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 294 jm 0.0190 jm/m3
WT Kap.mengikuti Vibro 52.50 m3/jm 1 unit 294 jm 0.0190 jm/m3

c Subbase coarse 1,076 m3 Grader 350 m'@3.5m' (4pass) 1225 m2/jm 4 pass 0.2 m 61.25 m3/jm 1 unit 671 jm 0.016327 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 783 jm 0.019048 jm/m3
WT Kap.mengikuti Vibro 52.50 m3/jm 1 unit 783 jm 0.019048 jm/m3
Page 10 of 20

Spek Alat Spek Material Kebutuhan Alat/Material/Orang Waktu Pelaksanaan


Spesifikasi
Perhitungan Perhitungan
No Uraian Pekerjaan Vol Sat Kapasitas Waktu per Item Total Item
Jarak Lebar Tinggi /tebal Σ per Item Total Item
Alat Material
Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat Nilai Sat
M Tailrace
1 Clearing & Grubbing 56,801 m2 t=20cm 11360.20 m3
Dozer 3 hari @ 1 Ha(10.000m2) 476.19 m2/jm 0.2 m 95.24 m3/jm 1 unit 119 jm 0.0021 jm/m2
Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 189 jm 0.003333 jm/m2

2 Common Soil 484,509 m3


Galian daerah datar (80%) 387,607 m3 Dozer Kap.Dozer 95.20 m3/jm 95.2 m3/jm 95.2 m3/jm 1 unit 4,072 jm 0.008403 jm/m3

Galian tebing (Triming) (20%) 96,902 m3 Excav Kap.Excav 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 1,615 jm 0.003333 jm/m3

Loading to DT 484,509 m3 Excav Kap.Excav 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 8,075 jm 0.016667 jm/m3

3 Weathered Rock 5,755 m3 Ex+JH Kap. Alat 50 m3/jm 50 m3/jm 50 m3/jm 1 unit 115 jm 0.0200 jm/m3

4 Weak Rock 3,775 m3 Ex+JH Kap. Alat 40 m3/jm 30 m3/jm 30 m3/jm 1 unit 126 jm 0.0333 jm/m3

5 Embankment 21,844 m3 Vib.SF Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 485 jm 0.022222 jm/m3
WT Kap. Alat 45 m3/jm 45 m3/jm 45 m3/jm 1 unit 485 jm 0.022222 jm/m3

6 Backfill 218,925 m3 Excav Kap. Alat 60 m3/jm 60 m3/jm 60 m3/jm 1 unit 3,649 jm 0.016667 jm/m3
Vibro 300 m' @ 3.5m' ,t=20cm 1050 m2/jm 4 pass 0.2 m 52.50 m3/jm 1 unit 4,170 jm 0.019048 jm/m3

6 Disposal 264,630 m3 DT jarak angkut ± 9 km 13 m3/jm 13 m3/jm 1 unit 20,356 jm 0.0769 jm/m2
(clearing+excavation-embankment) Kapasitas 1 DT, 8 m3
9 km
t1(wkt berangkat) 0.300 jm
30 km/jm

9 km
t2(wkt pulang) 0.225 jm
40 km/jm

t3(faktor tunggu,dll) 5 menit 0.083 jm

Ct total 0.608 jm 36.50 mnt

60 mnt
1 jam kerja DT 8 m3 13.15 m3/jm
36.50 mnt
Asumsi rata-rata Kapasitas angkut DT 13 m3/jm

Dozer Kap.Dozer 95.20 m3/jm 95.20 m3/jm 95.2 m3/jm 1 unit 2,780 jm 0.0105 jm/m3
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

EXISTING ROAD 200


Grade Preparation 83,555 m2 M.Grader 1 350 m2 239 1.19 2 0.60 2
Vibro R 1 300 m2 279 1.39 2 0.70 2

Sub Base Coarse 19,098 m3 M.Grader 1 61.25 m3 312 1.82 2 0.91 2


Vibro R 1 52.50 m3 364 1.82 2 0.91 2
Water T 1 52.50 m3 364 1.82 2 0.91 2

Base Coarse 7,162 m3 M.Grader 1 45.94 m3 156 0.91 2 0.45 2


Vibro R 1 39.38 m3 182 0.91 2 0.45 2
Water T 1 39.38 m3 182 0.91 2 0.45 2

Penetration Macadam 47,746 m2 Sprayer 1 350 m2 136 0.68 1 0.68 1


Dump T 1 350 m2 136 0.68 1 0.68 1
TW.Roller 1 350 m2 136 0.68 1 0.68 1

ACCES ROAD 1-3


Clearing & Grubbing 178,569 m2 Bulldozer 1 95.24 m3 375 1.87 2 0.94 2
35,714 m3 Excavator 2 60.00 m3 595 1.87 2 0.94 3

Excav.Common Soil 376,078 m3


Bulldpzer 80% 300,862 m3 Bulldozer 1 95.20 m3 3,160 15.80 4 3.95 4 4 4 4
Excavator 20% 60,172 m3 Excavator 1 60.00 m3 1,003 5.01 4 1.25 4 4 4 4
Excavator Loading 376,078 m3 Excavator 2 60.00 m3 6,268 15.67 4 3.92 8 8 8 8

Excav.Weathered Rock 11,806 m3 Excavator 1 50.00 m3 236 1.18 1 1.18 1 1


Exc.Breaker 1 50.00 m3 236 1.18 1 1.18 1 1

Embankment 50,673 m3
Embankment 36,329 m3 Sifut R 1 45.00 m3 807 4.04 2 2.02 2 2
(jarak 0-100 m) WTT 1 45.00 m3 807 4.04 2 2.02 2 2

Embankment 14,345 m3 Excavator 1 60.00 m3 239 1.20 2 0.60 2


(jarak 100-600 m) DT 1 79.00 m3 182 0.91 2 0.45 2
M.Grader 1 61.25 m3 234 1.59 2 0.80 1
Sifut R 1 45.00 m3 319 1.59 2 0.80 2
WTT 1 45.00 m3 319 1.59 2 0.80 2

Disposal 372,925 m3 DT 1 21.00 m3 17,758 88.79 22 4.04 22 22 22 22


(jarak rata-2 +/-5 Km) Bulldozer 0 95.20 m3 3,917 88.79 22 4.04 5 5 5 5

Grade Preparation 55,014 m2 M.Grader 1 350 m2 157 0.79 2 0.39 2


JADWAL PERALATAN
Vibro R 1 300 m2 183 0.92 2 0.46 2

Sub Base Coarse 22,005 m3 M.Grader 1 61.25 m3 359 1.80 2 0.90 2


Vibro R 1 52.50 m3 419 2.10 2 1.05 2
Water T 1 52.50 m3 419 2.10 2 1.05 2

Base Coarse 8,252 m3 M.Grader 1 45.94 m3 180 0.90 2 0.45 2


Vibro R 1 39.38 m3 210 1.05 2 0.52 2
Water T 1 39.38 m3 210 1.05 2 0.52 2

Penetration Macadam 55,014 m3 Sprayer 1 350 m2 157 0.79 1 0.79 1


Dump T 1 350 m2 157 0.79 1 0.79 1
TW.Roller 1 350 m2 157 0.79 1 0.79 1

M.Grader 2 2 2 - - - 1 2 2 2
Vibro R 2 2 2 - - - - 2 2 2
Sifoot Roller - - - - 2 2 2 - - -
Water T - 2 2 - 2 2 2 - 2 2
Bulldozer - - 2 4 4 4 4 - - -
Excavator - - 3 12 12 13 15 - - -
Excavator Breaker - - - - - 1 1 - - -
DT - - 1 22 22 22 24 - - 1
Sprayer - - 1 - - - - - - 1
TW.Roller - - 1 - - - - - - 1
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

WATERWAY 200
Clearing & Grubbing 390,801 m2 Bulldozer 1 95.24 m3 821 4.10 1 4.10 1 1 1 1
78,160 m3 Excavator 2 60.00 m3 1,303 4.10 1 4.10 2 2 2 2

Excav.Common Soil 2,751,729 m3


Bulldpzer 80% 2,201,383 m3 Bulldozer 1 95.20 m3 23,124 115.62 8 14.45 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Excavator 20% 440,277 m3 Excavator 1 60.00 m3 7,338 36.69 3 12.23 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Excavator Loading 2,751,729 m3 Excavator 2 60.00 m3 45,862 114.66 8 14.33 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16

Excav.Weathered Rock 279,023 m3 Excavator 1 50.00 m3 5,580 27.90 2 13.95 2 2 2 2 2 2 2 2 2 2 2 2 2 2


Exc.Breaker 1 50.00 m3 5,580 27.90 2 13.95 2 2 2 2 2 2 2 2 2 2 2 2 2 2

Embankment 652,725 m3
Embankment 60,503 m3 Vibro Roller 1 45.00 m3 1,345 6.72 4 1.68 4 4
(jarak 0-100 m) WTT 1 45.00 m3 1,345 6.72 4 1.68 4 4

Embankment 99,915 m3 Excavator 0.8 60.00 m3 1,665 11.10 4 2.78 3 3 3


(jarak 0,10-1 KM) DT 0.8 79.00 m3 1,265 8.33 4 2.08 3 3 3
M.Grader 0.7 61.25 m3 1,631 11.10 4 2.78 3 3 3
Vibro Roller 1.0 45.00 m3 2,220 11.10 4 2.78 4 4 4
WTT 1.0 45.00 m3 2,220 11.10 4 2.78 4 4 4

Embankment 492,307 m3 Excavator 0.8 60.00 m3 8,205 54.70 6 9.12 5 5 5 5 5 5 5 5 5


(jarak 1-3 KM) DT 1.5 40.00 m3 12,308 41.03 6 6.84 9 9 9 9 9 9 9 9 9
M.Grader 0.7 61.25 m3 8,038 54.70 6 9.12 4 4 4 4 4 4 4 4 4
Vibro Roller 1.0 45.00 m3 10,940 54.70 6 9.12 6 6 6 6 6 6 6 6 6
WTT 1.0 45.00 m3 10,940 54.70 6 9.12 6 6 6 6 6 6 6 6 6

Disposal 2,099,004 m3 DT 1 40.00 m3 52,475 262.38 18 14.58 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18


Bulldozer 0 95.20 m3 22,048 262.38 18 14.58 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

M.Grader - - - - - - - - 3 3 3 4 4 4 4 4 4 4 4 4 - - - -
Vibro Roller - - - - - - 4 4 4 4 4 6 6 6 6 6 6 6 6 6 - - - -
Water T - - - - - - 4 4 4 4 4 6 6 6 6 6 6 6 6 6 - - - -
Bulldozer - - - - 17 17 17 17 16 16 16 16 16 16 16 16 16 16 16 - - - - -
Excavator - - - - 5 9 9 9 10 10 10 12 12 12 12 12 12 12 12 5 - - - -
Excavator Breaker - - - - - 2 2 2 2 2 2 2 2 2 2 2 2 2 2 - - - - -
DT - - - - 18 18 18 18 21 21 21 27 27 27 27 27 27 27 27 9 - - - -
JADWAL PERALATAN
Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :
Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

INTAKE WIER+INTAKE 200


Clearing & Grubbing 22,899 m2 Bulldozer 1 95.24 m3 48 0.24 1 0.24 1
4,580 m3 Excavator 2 60.00 m3 76 0.24 1 0.24 2

Excav.Common Soil 157,927 m3 Excavator 1 60.00 m3 2,632 13.16 2 6.58 1 2 2 2 2 2 2


Loading Excavator 1 60.00 m3 2,632 13.16 2 6.58 1 2 2 2 2 2 2

Excav.Weathered Rock 48,283 m3 Excavator 1 50.00 m3 966 4.83 1 4.83 1 1 1 1 1


Exc.Breaker 1 50.00 m3 966 4.83 1 4.83 1 1 1 1 1

Weak Rock 5,714 m3 Excavator 1 30.00 m3 190 0.95 1 0.95 1


Exc.Breaker 1 30.00 m3 190 0.95 1 0.95 1

Backfill 16,717 m3 Excavator 1 60.00 m3 279 1.39 1 1.39


Vibro R 1 52.50 m3 318 1.59 1 1.59

Disposal 195,207 m3 DT 1 71.00 m3 2,749 13.75 2 6.87 2 2 2 2 2 2 2


(jarak rata-500m) Bulldozer 1 95.20 m3 2,050 13.75 2 6.87 1 1 1 1 1 1 1

Sifoot Roller
Water T
Bulldozer - - - - 2 1 1 1 1 1 1 - - - - - - - - - - - - -
Excavator - - - - 4 5 5 5 5 5 5 - - - - - - - - - - - - -
Excavator Breaker - - - - - 1 1 1 1 1 1 - - - - - - - - - - - - -
DT - - - - 2 2 2 2 2 2 2 - - - - - - - - - - - - -

Vibro Roller - - - - - - - - - - - - - - - - - - - - - - - -
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

DIVERSION WORK 200


Embankment wtih Compaction 339,167 m3 Vibro R 1 45.00 m3 7,537 37.69 17 2.22 17 17 17
(common soil) WTT 1 45.00 m3 7,537 37.69 17 2.22 17 17 17

Embankment wtih Compaction 2,526,886 m3 Vibro R 1 45.00 m3 56,153 280.77 17 16.52 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17


WTT 1 45.00 m3 56,153 280.77 17 16.52 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17

Vibro Roller 18.73 - - - - 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 -

WTT - - - - 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 -

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

SAND TRAP 200


Clearing & Grubbing 15,875 m2 Bulldozer 1 95.24 m3 33 0.17 1 0.17 1
3,175 m3 Excavator 2 60.00 m3 53 0.17 1 0.17 2

Excav.Common Soil 106,060 m3 Excavator 1 60.00 m3 1,768 8.84 2 4.42 2 2 2 2 2 2


Loading m3 Excavator 1 60.00 m3 1,768 8.84 2 4.42 2 2 2 2 2 2

Excav.Weathered Rock 66,278 m3 Excavator 1 50.00 m3 1,326 6.63 2 3.31 2 2 2 1


Exc.Breaker 1 50.00 m3 1,326 6.63 2 3.31 2 2 2 1

Weak Rock 36,989 m3 Excavator 1 30.00 m3 1,233 6.16 2 3.08 1 2 2


Exc.Breaker 1 30.00 m3 1,233 6.16 2 3.08 1 2 2

Backfill 13,968 m3 Excavator 1 60.00 m3 233 1.16 1 1.16


Vibro R 1 52.50 m3 266 1.33 1 1.33

Disposal 198,534 m3 DT 1 56.00 m3 3,545 17.73 3 5.91 3 3 3 3 3 3


(jarak rata-1KM) Bulldozer 1 95.20 m3 2,085 17.73 3 5.91 2 2 2 2 2 2

Sifoot Roller
Water T
Bulldozer - - - - - - - - - - - 3 2 2 2 2 2 - - - - - - -
Excavator - - - - - - - - - - - 8 6 6 6 6 6 - - - - - - -
Excavator Breaker - - - - - - - - - - - 2 2 2 2 2 2 - - - - - - -
DT - - - - - - - - - - - 3 3 3 3 3 3 - - - - - - -

Vibro Roller - - - - - - - - - - - - - - - - - - - - - - - -
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

HEAD TANK 200


Clearing & Grubbing 5,910 m2 Bulldozer 1 95.24 m3 12 0.06 1 0.06 1
1,182 m3 Excavator 2 60.00 m3 20 0.06 1 0.06 2

Excav.Common Soil 68,005 m3 Excavator 1 60.00 m3 1,133 5.67 2 2.83 2 2 2


Loading Excavator 1 60.00 m3 1,133 5.67 2 2.83 2 2 2

Excav.Weathered Rock 10,702 m3 Excavator 1 50.00 m3 214 1.07 1 1.07 1


Exc.Breaker 1 50.00 m3 214 1.07 1 1.07 1

Weak Rock 617 m3 Excavator 1 30.00 m3 21 0.10 1 0.10 1


Exc.Breaker 1 30.00 m3 21 0.10 1 0.10 1

Backfill 16,127 m3 Excavator 1 60.00 m3 269 1.34 1 1.34


Vibro R 1 52.50 m3 307 1.54 1 1.54

Disposal 64,379 m3 DT 1 14.00 m3 4,599 22.99 8 2.87 8 8 8


(jarak angkut 8 Km) Bulldozer 0 95.20 m3 676 22.99 8 2.87 1 1 1

Bulldozer - - - - - - - - - - - - - - - - - 1 1 1 1 - - -
Excavator - - - - - - - - - - - - - - - - - 2 4 5 5 - - -
Excavator Breaker - - - - - - - - - - - - - - - - - - - 1 1 - - -
DT - - - - - - - - - - - - - - - - - - 8 8 8 - - -

Vibro Roller - - - - - - - - - - - - - - - - - - - - - - - -
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

PENT STOCK 200


Clearing & Grubbing 59,563 m2 Bulldozer 1 95.24 m3 125 0.63 1 0.63 1
11,913 m3 Excavator 2 60.00 m3 199 0.63 1 0.63 2

Excav.Common Soil 1,156,794 m3 Excavator 1 60.00 m3 19,280 96.40 7 13.77 7 7 7 7 7 7 7 7 7 7 7 7 7


Loading Excavator 1 60.00 m3 19,280 96.40 7 13.77 7 7 7 7 7 7 7 7 7 7 7 7 7

Excav.Weathered Rock 88,190 m3 Excavator 1 50.00 m3 1,764 8.82 1 8.82 1 1 1 1 1 1 1 1 1


Exc.Breaker 1 50.00 m3 1,764 8.82 1 8.82 1 1 1 1 1 1 1 1 1

Weak Rock 18,508 m3 Excavator 1 30.00 m3 617 3.08 1 3.08 1 1 1


Exc.Breaker 1 30.00 m3 617 3.08 1 3.08 1 1 1

Backfill 136,333 m3 Excavator 1 60.00 m3 2,272 11.36 1 11.36


Vibro R 1 52.50 m3 2,597 12.98 1 12.98

Disposal 1,085,130 m3 DT 1 14.00 m3 77,509 387.55 30 12.92 30 30 30 30 30 30 30 30 30 30 30 30 30


(jarak 8 Km) Bulldozer 0 95.20 m3 11,398 387.55 30 12.92 4 4 4 4 4 4 4 4 4 4 4 4 4

Bulldozer - - - - - - - 5 4 4 4 4 4 4 4 4 4 4 4 4 - - - -
Excavator - - - - - - - 16 15 15 15 15 15 15 15 15 15 15 15 15 - - - -
Excavator Breaker - - - - - - - - 1 1 1 1 1 1 1 1 1 1 1 1 - - - -
DT - - - - - - - 30 30 30 30 30 30 30 30 30 30 30 30 30 - - - -

Vibro Roller - - - - - - - - - - - - - - - - - - - - - - - -
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

POWER HOUSE 200


Clearing & Grubbing 12,186 m2 Bulldozer 1 95.24 m3 26 0.13 1 0.13 1
2,437 m3 Excavator 2 60.00 m3 41 0.13 1 0.13 2

Excav.Common Soil 114,426 m3 Excavator 1 60.00 m3 1,907 9.54 4 2.38 4 4 4


Loading Excavator 1 60.00 m3 1,907 9.54 4 2.38 4 4 4

Excav.Weathered Rock 10,736 m3 Excavator 1 50.00 m3 215 1.07 1 1.07 1


Exc.Breaker 1 50.00 m3 215 1.07 1 1.07 1

Weak Rock 9,911 m3 Excavator 1 30.00 m3 330 1.65 1 1.65 1 1


Exc.Breaker 1 30.00 m3 330 1.65 1 1.65 1 1

Backfill 8,493 m3 Excavator 1 60.00 m3 142 0.71 1 0.71


Vibro R 1 52.50 m3 162 0.81 1 0.81

Disposal 126,580 m3 DT 1 13.00 m3 9,737 48.68 12 4.06 12 12 12 12


(jarak 8,5 Km) Bulldozer 0 95.20 m3 1,330 48.68 12 4.06 2 2 2 2

Bulldozer - - - - - - - - 3 2 2 2 - - - - - - - - - - - -
Excavator - - - - - - - - 2 9 9 9 - - - - - - - - - - - -
Excavator Breaker - - - - - - - - - 1 1 1 - - - - - - - - - - - -
DT - - - - - - - - 12 12 12 12 - - - - - - - - - - - -

Vibro Roller - - - - - - - - - - - - - - - - - - - - - - - -
JADWAL PERALATAN

Volume Komposisi Jam Kerja Jumlah Jmlh Waktu BULAN :


Jenis Pekerjaan
Pekerjaan Alat / Fleet Produk/jam Jam Bulan Fleet (Bulan) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TAIL RACE 200


Clearing & Grubbing 56,801 m2 Bulldozer 1 95.24 m3 119 0.60 1 0.60 1
11,360 m3 Excavator 2 60.00 m3 189 0.60 1 0.60 2

Excav.Common Soil 484,509 m3


Bulldpzer 80% 387,607 m3 Bulldozer 1 95.20 m3 4,072 20.36 3 6.79 3 3 3 3 3 3 3
Excavator 20% 77,521 m3 Excavator 1 60.00 m3 1,292 6.46 1 6.46 1 1 1 1 1 1 1
Loading 484,509 m3 Excavator 2 60.00 m3 8,075 20.19 3 6.73 6 6 6 6 6 6 6

Excav.Weathered Rock 5,755 m3 Excavator 1 50.00 m3 115 0.58 1 0.58 1


Exc.Breaker 1 50.00 m3 115 0.58 1 0.58 1

Weak Rock 3,775 m3 Excavator 1 30.00 m3 126 0.63 1 0.63 1


Exc.Breaker 1 30.00 m3 126 0.63 1 0.63 1

Embankment 21,844 m3 Vibro Roller 1 45.00 m3 485 2.43 1 2.43 1 1 1


WTT 1 45.00 m3 485 2.43 1 2.43 1 1 1

Backfill 218,925 m3 Excavator 1 60.00 m3 3,649 18.24 1 18.24


Vibro R 1 52.50 m3 4,170 20.85 1 20.85

Disposal 585,797 m3 DT 1 13.00 m3 45,061 225.31 32 7.04 32 32 32 32 32 32 32


(jarak 9 Km) Bulldozer 0 95.20 m3 6,153 225.31 32 7.04 4 4 4 4 4 4 4

Water T - - - - - - - - - - - - - - - - - 1 1 1 - - - -
Bulldozer - - - - - - - - - - - - 1 7 7 7 7 7 7 7 - - - -
Excavator - - - - - - - - - - - - 2 7 7 7 7 7 8 8 - - - -
Excavator Breaker - - - - - - - - - - - - - - - - - - 1 1 - - - -
DT - - - - - - - - - - - - - 32 32 32 32 32 32 32 - - - -

Vibro Roller - - - - - - - - - - - - - - - - - - - - - - - -

TOTAL KEBUTUHAN
M.Grader 2 2 2 - - - 1 2 5 5 3 4 4 4 4 4 4 4 4 4 - - - -
Vibro R 2 2 2 - 17 17 21 23 23 23 21 23 23 23 23 23 23 23 23 23 17 17 17 -
Sifoot Roller - - - - 2 2 2 - - - - - - - - - - - - - - - - -
Water T - 2 2 - 19 19 23 21 23 23 21 23 23 23 23 23 23 24 24 24 17 17 17 -
Bulldozer - - 2 4 23 22 22 23 24 23 23 24 23 29 29 29 29 28 29 13 1 - - -
Excavator - - 3 12 20 27 29 29 32 39 39 43 34 40 40 40 40 35 39 33 5 - - -
Excavator Breaker - - - - - 4 4 3 4 5 5 6 5 5 5 5 5 3 4 3 1 - - -
DT - - 1 22 42 42 44 50 65 66 65 72 60 92 92 92 92 89 97 79 8 - - -
JADWAL PERALATAN
Sprayer - - 1 - - - - - - 1 - - - - - - - - - - - - - -
TW.Roller - - 1 - - - - - - 1 - - - - - - - - - - - - - -