Hon EMEA16 Bastone Experion PKS Orion

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 43

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Integrated solutions
increase value
of individual benefits!
Universal IO
Keep Automation off of the critical
path!
Eliminate activities that generate
rework!
Be virtually free from hardware Cloud
Virtualization
dependencies Engineering

Reduce travel costs by 70%


Gain 25% flexibility in your schedule
Reduce your MAC capital by 30%

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

LEAP for Automation Projects


4

Off the
Start Finish
Critical Path
Physical Functional

Define Design Manuf Config Test Install

Late
Binding

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Late Binding is a LEAP Enabler


5

LER or RIE
Field
Universal
JunctionIO
Standard Junction Marshalling Controller and
Controller
Box box Cabinet
Cabinet IOCabinet
Cabinet

Multi
Core
Cables

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

30% Capital Savings


6

Fiber Optic Stainless Steel


Media Marine Cabinet
Convertors IP66

• Standard Cabinet Design


Fiber Optic • Standard Power Supply Universal I/O
Termination • Physical Characteristics Modules
- 800mmW x 1200mmH x 300mmD
 Painted Steel
 316L Stainless Steel Field Power and
Redundant - -40C to +55C External Terminations
Power Supply  -40C to +70C Internal “VIPER”
- Gland Plate
- IOL Fiber Optic Extender
Marine Filters  Single Mode
Gland Entry
(Marine Apps  Multi-Mode (future)
 Leap Frog (Daisy Chain) Option
System
Only)
Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Getting Experion PKS Closer to the Process


7

Input/output accessories (IOAs):


- Feed-through (2Q2017)
- Analog Protection (2Q2017)
- Digital Relay (estimated 3Q2017)
- Signal Conditioning (estimated 4Q2017)
- Safety Relay (Future)
- IS (Future)

Marking
Channel

Connection
to the card

Power – Field connectivity - 2 “Slices” per


additional “slices” channel/6 connection points:
for: Signal (+), Return (-), and Shield
-24V two additional connections for
-120V signal conditioning applications

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Expand Functionality for UIO


8

Cloud Operations
Virtual Engineering Platform

Instrument Build Test CMs /


Index Devices HMI / etc.

Build CMs / Config


HMI / etc. Acceptance Test

FT101
Match
Interrogate
FT100
Test Document
FT101
Detect
FT102

Universal Configure
Process
Cabinet

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.


10

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Superior HART Performance


11

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Advanced Process Control Inside


12

Redundant Experion Station


Server

FTE Network Device Tools

EIM

EIM Level 1 Network


C300

Smart Smart Smart Smart


Device Device Device Device

I/O

I/O

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

One Module – Multiple Protocols


13

Redundant Experion Station


Server

FTE Network CDA

EIM

EIM IEC61850 Network


C300

IED IED IED IED

I/O

I/O

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Experion as Electrical Control & Management System


14

Redundant Experion Station


Server

FTE Network CDA


Device
Tools
EIM

EIM Ethernet IP Network


C300

EIP EIP EIP EIP

I/O
I/O

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.


15

Past Future
Optimal Response

Setpoint Predicted
CV nforced
Unforced
esponse
Response
Control Funnel

MV Assumed Values

Minimum Effort Move


T=0

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Advanced Control in Embedded Controllers


16

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Simplified Maintenance Schedules


Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Improve System Security


19

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.


20

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Further Increase System Availability


21

Virtual Staging Area

OPM Server B OPM Flex/Console

OPM Server A OPM ACE

Experion Support and Maintenance

Server B Flex/Console Server A ACE


Pre-migration Server B Flex/Console Server A ACE
Replacement Replacement Replacement Replacement

Production Cluster

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Reduce Time Required for OPM


2
2
Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Select Best Theme for Situation


Limit Trend

Advanced Solution Pack Limit Help

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.


Honeywell - © 2016 by Honeywell International Inc. All rights reserved.
27

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Better Availability for Critical Infrastructure


28

Up to 12 concurrent Users
- LEAP Enabler

Plus Management of Change


- Who changed what when
- Compare to runtime

Quick Builder
Experion’s configuration
tool for SCADA points &
Equipment templating
Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Multiple User Support


29

HMIWeb Display
Builder
Experion’s configuration
tool for HMI Displays

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

HMI Management of Change


30

RTU2020
specific tabs

Data direct from


RTU2020

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Applying LEAP Principles


31

Experion Quick Builder


DNP3 Controller

RTU Builder
Project

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Eliminate Rework
Leading The Industry Through Innovation

OneWireless™
Industry’s First Multi
2011 Application Wireless
Network

OneWireless™ Network
- Multiprotocol Wireless IO

Industry’s First
2016 Multiprotocol Wireless I/O
& System

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

The Most Versatile Network For All Applications


34

The Best Got Even Better – With No Change!!

No
Hardware 25%
Change Cost
Effective

Software 50%
Innovation Cost
Effective

Field Upgradable

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Delivering More Value on Investments


35

The Multiprotocol Wireless IO & System

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

And Native Experion Integration


Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

Integrated Tools Designed to Work Together


Honeywell - © 2016 by Honeywell International Inc. All rights reserved.
Experion R500 *
Configuration Management of Change
Experion R431 New SCADA Protocols for EFMs
Experion R430 New Protocols: IEC 61850 SCADA Interface Update
Pan & Zoom Displays Flow-X EFM SCADA Point Enhancement
Equipment Templating & Bristol Babcock EFM RTU2020 Integration
Displays IEC 61850 Configuration Third Party Package Configuration Efficiency
Experion R410 5,000 Controllers / RTUs Efficiencies Operational Applications Suite Enhancements
300,000 SCADA Points Scanning Sub-system
Improved ControlLogix Interface Enhancements
OPC Non-scanned parameters EFM Data Collection &
SCADA Point Processing handoff
New Calculation Algos Gas Operations Suite 2017
Dynamic Alarm Suppression 2016
Alarm Tracker
ACM Alarm Help 2015
64-bit OS support
+++ much more
2014
RTU2020 R140
Redundant RTU
2013
RTU2020 R110 RTU2020 R120
Expansion I/O Wireless I/O (ISA 100)
RTU2020 Ø1 API 21.1 Support RTU Builder Improvements
28 on board I/O, inc HART AER Directive 17 validated
2012 Modular construction RTU Builder Improvements
Harsh environ. -40 to 75 C
Low power consumption
Expansion I/O Redundant RTU
IEC 61131-3 programming Single IOTA with positions
AGA function blocks 28 I/O (fixed mix)
for 2 processors
DNP3 & Modbus 8AI, 2AO, 10DI, 2PI, 6DO
2 Ethernet & 4 Serial ports
FDM Integration HART Enabled
No onboard I/O
Integrated I/O Port
Uses same Expansion I/O
Power & IO Link
Same environment specs
Supports 12 modules
Same environment specs
* Not a commitment. Forward looking plans are Add IECEx: RTU & IOM
Honeywell - © 2016 by Honeywell International Inc. All rights reserved.
subject to change without notice.
Honeywell - © 2016 by Honeywell International Inc. All rights reserved.
42

Honeywell - © 2016 by Honeywell International Inc. All rights reserved.

You might also like