Professional Documents
Culture Documents
Straight Line Diagram: As-Built Drawings
Straight Line Diagram: As-Built Drawings
AS-BUILT DRAWINGS
941+082.00
941+167.00
941+285.00
941+388.00
K0 941+492.60
E X C E P T I O N E X C E P T I O N
E X C E P T I O N E X C E P T I O N
E X C E P T I O N E X C E P T I O N
E X C E P T I O N E X C E P T I O N
END OF EXCEPTION
K0 943+588.800
E X C E P T I O N
LEGEND:
Bituminous Tack Coat, (SS-1) Bituminous Tack Coat, (SS-1) Widening ALL MATERIALS TESTING REQUIREMENTS WHERE UNDERTAKEN
AND THAT ALL MATERIALS USED COMPLIED WITH THE REQUIRED
SPECIFICATIONS.
PREPARED BY: CHECKED AND VERIFIED BY: RECOMMENDING APPROVAL: APPROVED: PROJECT TITLE & LOCATION: SHEET CONTENTS: SHEET NO.:
RMC1 - BILATERAL, UPMO REGIONAL OFFICE VIII RMC1 - BILATERAL , UPMO See Cover Sheet for Signature AWP-2 / PM 07 DAANG MAHARLIKA
(DULAG - MAYORGA SECTION) STRAIGHTLINE DIAGRAM
Republic of the Philippines B - 1a
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROVINCE OF LEYTE FOR BITUMINOUS BINDER
ERICSON A. SALAZAR ELMER A. IGNACIO EDGAR B. TABACON , CESO IV VIRGILIO C. CASTILLO EMIL K. SADAIN , CESO II COURSE, HOT-LAID 7a 36
CENTRAL OFFICE SECTION ID: 15Z00015, REGION VIII
AVP FOR OPERATION PROJECT ENGINEER III REGIONAL DIRECTOR PROJECT DIRECTOR UNDERSECRETARY
Manila
DPWH - RMC1 , BILATERAL - UPMO (KO935+000.00 TO KO950+000.00) 25mm THK.
CONTRACTOR FOR UPMO OPERATION
LENGTH = 15.00 Km.