Professional Documents
Culture Documents
Straight Line Diagram: As-Built Drawings
Straight Line Diagram: As-Built Drawings
AS-BUILT DRAWINGS
945+980.00
945+500 945+600
944+600 945+700 945+800 945+900 946+000
Intersection
KO945+958.25
Intersection Intersection
KO946+079.00 KO946+129.00
946+000 946+100 946+200 946+300 946+400 946+500
946+415.90
946+500 946+600 946+700 946+800 946+900 947+000
LEGEND:
Bituminous Tack Coat, (SS-1) Bituminous Tack Coat, (SS-1) Widening ALL MATERIALS TESTING REQUIREMENTS WHERE UNDERTAKEN
AND THAT ALL MATERIALS USED COMPLIED WITH THE REQUIRED
SPECIFICATIONS.
PREPARED BY: CHECKED AND VERIFIED BY: RECOMMENDING APPROVAL: APPROVED: SHEET CONTENTS: SHEET NO.:
RMC1 - BILATERAL, UPMO REGIONAL OFFICE VIII RMC1 - BILATERAL , UPMO See Cover Sheet for Signature CATARMAN-CALBAYOG ROAD
CATARMAN-LOPE DE VEGA SECTION STRAIGHTLINE DIAGRAM
Republic of the Philippines B - 1d
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROVINCE OF NORTHERN SAMAR FOR BITUMINOUS BINDER
ERICSON A. SALAZAR ELMER A. IGNACIO EDGAR B. TABACON , CESO IV VIRGILIO C. CASTILLO EMIL K. SADAIN , CESO II COURSE, HOT-LAID 7d 36
CENTRAL OFFICE SECTION ID: 15Z00013, REGION VIII
AVP FOR OPERATION PROJECT ENGINEER III REGIONAL DIRECTOR PROJECT DIRECTOR UNDERSECRETARY
Manila
DPWH - RMC1 , BILATERAL - UPMO (KO744+000.00 TO KO755+000.00) 25mm THK.
CONTRACTOR FOR UPMO OPERATION
LENGTH = 11.00 Km.