General Note :-
1) Three sets of test certificates (2 sets hard & 1 set soft) duly verified and signed by the main Contractor shall be furnished.
2) IP number and revision status to be indicated by APE Power (P) Ltd.
3) Drawing approval authority shall be as per contract.
4) If quantity is in lot/set, substantial quantity shall be offered for economy of inspection & lot/set break-up details should be certified by the competent authority.
5) Attempt shall be exercised to furnishIP for all the items if the package in single lot.
Acceptance Norm
Contract/ (Indicate applicable
Billing In-Process Inspection Final Inspection Standards, Methods, Test Certificates & Documents
Sl. Schedule/ Equipment/Item (Select from List-A) (Select from List-A) Procedures] & Documents to be submitted by Contractor
No. Item No. Description Qty. M C D M C D from List B (Select from List A&B) Remarks/Sampling Plan, if any
Abbreviation:-
M : Manufacturer C : Contractor D : APE POWER (P) Ltd. R : Document Review
Page __ of __
APE POWER (P) LTD.
INSPECTION PROCEDURE (IP) FOR INSTRUMENTATION & AUTOMATION EQUIPMENT AT MANUFACTURERS' WORKS
APE-IIB, Rev.00
Code Test & Test Certificates Code Test & Test Certificates Code Code
1 Gen.arrangement & workmanship 9 Check for accessories. 20 Performance Tests B1 Approved GA Drawing B13 TCs for bought out items.
2 Dimensional check 10 Insulation resistance test 21 Measurement of coil resistance B2 Data Sheet duly approved B14 Painting Certificate.
3 Operational & functional tests 11 High Voltage Test isolating 22 Acceptance test as per relevant standard B3 BOM duly approved B15 FLP/Explosion proof test certificate
4 Component check as per electronics wherever applicable 23 Burn-in test B4 SLD/Schematic duly approved B16 Calibration certificate of measuring
5 Bill of Materials verification 12 Load test 24 Measurement of L,R, L/R ratio B5 Terminal Plan duly approved equipment from NABL
6 Routine Tests as per relevant statndard 13 Simulation checks 25 Pressure Test of Enclosure B6 Manufacturer's Catalogue B17 Enclosure protection test certificate
7 Type tests as per relevant standard 14 Special tests as per B7 Approved P&I Diagram B18 Intrinsic Safety certificate from FM/UL etc.
8 System Integration Test (SIT)/ standards B8 System configuration diagram B19 Internal test report of Contractor
Factory Acceptance Test (FAT) 15 Over speed test B9 Input/output list B20 Environmental test certificate
to be done on original 16 Material test certificate. B10 Approved FAT/SIT document B21
hardware based on approved 17 Pressure/ Leakage Test B11 Control Philosophy
SIT/FAT documents. 18 Checking of calibration B12 Approved Functional Description
19 Over Pressure Effect
General Note :-
1) Three sets of test certificates (2 sets hard & 1 set soft) duly verified and signed by the main Contractor shall be furnished.
2) IP number and revision status to be indicated by APE Power (P) Ltd.
3) Drawing approval authority shall be as per contract.
4) If quantity is in lot/set, substantial quantity shall be offered for economy of inspection & lot/set break-up details should be certified by the competent authority.
5) Attempt shall be exercised to furnishIP for all the items if the package in single lot.
Page 1 of 2