RIG ACTIVITY REPORT

29 - 30 April, 2018
Sr.
Operator Contr. Rig # Status Location E/D T.D (M)
#
N-1
1 OGDCL SELF Workover Chanda-1
(2000HP)
N-2 Drilled Depth 1452 M, Hole size
OGDCL SELF Sheikhan Bhutta-1 3550
2 (2000HP) 17-1/2”
N-3 Drilled Depth 2910 M, Hole size 8-
3 OGDCL SELF Khirun Well -1 2865
(2000HP) 1/2”
N-4
4 OGDCL SELF Rig Building Chak 25 # 1 DEV
(2000HP)
N-5
5 OGDCL SELF Rig Building Zin Deep -2 DEV
(2000HP)
N-6
6 OGDCL SELF Well Under Production Testing Nashpa-8 DEV 4525
(2000HP)

7 OGDCL SELF N-55 Under Maintenance Pasakhi North-3 2123

8 OGDCL SELF SK-750 Rig under maintenance QP WDW-02 WO 775

9 OGDCL SELF K-750 T Rig Move Kunnar Deep- 4 WO


GWDC-5 Drilled Depth 3923 M, Hole size
10 OGDCL CHINA GW Mela-6 5412
CCDC-26 12-1/4”

11 OGDCL Sinopec SIN – 149 Rig Released

EXALO-1 Drilled Depth 1026 M, Hole size 8-


12 OGDCL Exalo QP-9 ST 3057
(1700HP) 1/2”
GWDC-8 Drilling Depth 2376 m, Hole Size
13 OGDCL GWDC Nur West # 1 2985
CCDC - 31 12-1/4”
Drilling Depth 4389 m, Hole Size
14 OGDCL HILONG HILONG-2 Shawa X-1 5750
8-1/2”
3660
15 OGDCL SELF TCPD C-1 Rig Released URS-1

5000
16 OGDCL SELF TCPD C-2 Rig Released

17 OGDCL GWDC CCDC - 27 Drilling Depth 5043 m Khanjar-1 5140


EXALO-305
18 POL EXALO Testing in Progress Khaur North 14640
(2000)
SCR # 1
19 POL POL Completion Joyamir Deep 8900
(1500HP)
Drilling Depth 4957 m , Hole Size
20 MOL Weatherford 811 Tolanj East-1 5557
6”
T-72 Drilling Depth 3311 m , Hole Size
21 MOL DEUTAG Mamikhel Deep-1 5229
10.625”
22 MOL EXALO EXALO-303 Rig Released Mardan Khel-2 4808
SLR Rig-215 Drilling Depth 750 m , Hole Size
23 OMV Saxon Latif-6
17-1/2”
Skytop
24 MPCL SELF Brewster Stacked Mari-101 DEV
(300HP)
ZJ-50 DBS
25 MPCL SELF Rig Mari 1 Rig Move Bolan East
(1500HP)
RIG Mari-3 Drilling Depth 4199 m , 12-1/4
26 MPCL SELF Dharian-1 4900m
(2500HP) Hole Size
Drilling Depth 1900 m , 16” Hole
27 PGNIG EXALO EXALO-304 Roshan-1
Size
SCHLUMBE
28 OPPL SLR-260 Rig Released Zamzama-1 ST-2 3520
RGER
29 PEL Atlantic Discoverer-3 Rig Released Zainab-1 2639
Schlumberg
30 ENI SLR-260 Rig Released.
er
Schlumberg
31 ENI SLR-215 Rig Released.
er

Nuricon Union (Pte.) Ltd. Islamabad


RIG ACTIVITY REPORT
29 - 30 April, 2018
TCPDC-4001
32 UEP Chinese Rig maintenance is in progress Malkani-1 ST-1 WO
(1000 HP)
TCPDC-2001
33 UEP Chinese Pressure Test tubing. Laghari-2 (WO) WO
(650 HP)
HiLong-5 Ali North-1 ST-1
34 UEP Chinese Circulation WO
(1500 HP) (WO)
TCPDC-4002
35 UEP Chinese Nipple up BOP, Depth: 2,578 Ft Dhabi North-5 7,050 FT
(1000HP)
HiLong-21 RIH with core assembly, Depth:
36 UEP Chinese Mubarak South-1 EXP 13,400 FT
(2000 HP) 13,196 Ft

EXALO-303 Condition trip, Drilling Depth


37 UEP Cracow Mukim-1 EXP
(2000 HP) 14,186 Ft @ TD
38 PPL CCDC CCDC-33 Rig released
Drilled 12 ¼” hole from 2434 to
39 PPL CCDC CCDC-30 Adhi-31 2515 M
2515 m.
Rig move and Rig up jobs are in
40 PPL CCDC CCDC-32 Adhi-32
progress.
Preparation for rig move from KHI Badeel X-1 (GS-16)
41 PPL CCDC CCDC-34
& ISL Offset KAbeer-1
P/T BOP stack. M/U & RIH 8-1/2”
H-725 PDC bit (RR) with motorized BHA.
42 PPL SELF SUI-103 U 372 M
IDECO COC. Press tested 9-5/8” csg –
OK. Drilling F/shoe in progress.
43 PPL CCDC CCDC-29 Rig up job is in progress. Talagang X-1
Drilled 12-1/4” hole from 3374 to
44 PPL CCDC CCDC-23 Misrial X-1 3,497 M
3497 m.
Successfully completed 2015-16
45 PPL SELF KB-500 workover campaign with PPL rig
KB-500.
Rig move started on April 30, Benary X-1 (Shah
46 PPL Weatherford WDI-3
2018. Bandr)
Rig released & Rig will be moved
47 PPL Weatherford WDI-812 Nausrat X-1
to well Nausrat X-1
Schlumberg Drilled 12-1/4” hole from 2916 to Rajab X-1 (Kotri X-
48 PPL SLR-225 2985 M
er 2985m. 3)
Drilled 12-1/4” hole from 2343 to
2460m. Wiper trip from 2460m.
Schlumberg String released at 2389 m.
49 PPL SLR-223 Ayub X-1 2460 M
er Increased MW. Reamed / Pump
out from 2389 to 1935m. Hole
packed off. Worked on stuck string.
POOH to surface. Changed rams.
R/U SLB W/L. RIH / recorded W/L
logs for run # 03 & run # 04 –
Observed tools could not descent
50 PPL HL HI-LONG-17 Hub X-1 4555 M
below 3047 & 3050 m on each
attempt. POOH & R/D SLB W/L
gears changed rams. M/U & RIH
12 ¼” bit / slick BHA to 225m.
Landed tubing hanger, P/T tbg
hanger & packer. Installed BPV-
,51 PPL HL HI-LONG-09 nipple down BOP & N/U Xmas Adhi-24 W/O WO 3310 M
tree. P/T X mass tree, THA against
blanking plug.

Nuricon Union (Pte.) Ltd. Islamabad