Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 11/12/13
Grow-Tech Properties Pte
Industrial development at Gambas Crescent & URA tender
Ltd (Part of Far East - 14,302 - Industrial - - - -
(Parcel 3) result
Organization)
13/12/13
BT/ST
Residential development comprising 281 units 16/11/12 &
World Class Developments
with 24 hour concierge service and 18 commercial 11/12/13 &
(North) Pte Ltd [Subsidiary - 10,170 - Residential - - - -
units at Jalan Jurong Kechil URA tender
of Aspial Corporation]
(The Hillford) result
22/11/12
Page 1
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Ley Choon
Civil Laying of gas transmission pipelines from Jalan
PowerGas Ltd 9.9 - - Nov-2013 Aug-2015 BT 25/9/13 - Constructions and
Engineering Bahar to Old Choa Chu Kang Road
Engineering Pte Ltd
Page 2
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 18/10/13
Grow-Tech Properties Pte
Industrial development at Gambas Crescent & URA tender
Ltd (Part of Far East - 12,067 - Industrial - - - -
(Parcel 1) result
Organization)
23/10/13
BT 18/10/13
Grow-Tech Properties Pte
Industrial development at Gambas Crescent & URA tender
Ltd (Part of Far East - 13,537 - Industrial - - - -
(Parcel 2) result
Organization)
23/10/13
BT 29/11/13
Kingsford Development Residential development at Upper Serangoon
- 15,341 - Residential - - & URA tender - -
Pte Ltd View (Parcel A)
result 2/12/13
BT 29/11/13
Kingsford Development Residential development at Upper Serangoon
- 11,951 - Residential - - & URA tender - -
Pte Ltd View (Parcel B)
result 2/12/13
Page 3
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Leighton
Contractors (Asia)
Civil Construction of Springleaf station and tunnels for BT & ST
Land Transport Authority 383 - - Nov-2013 May-2020 - Limited (Singapore
Engineering Thomson Line 16/11/13
Branch) - John
Holland Pty Ltd JV
Civil Construction of Upper Thomson station and BT & ST Sato Kogyo (S) Pte
Land Transport Authority 374 - - Nov-2013 May-2020 -
Engineering tunnels for Thomson Line 16/11/13 Ltd
Page 4
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Sinohydro
Civil Construction of Napier station and associated
Land Transport Authority 189 - - Nov-2013 Sep-2020 BT 30/11/13 - Corporation Ltd
Engineering tunnels for Thomson Line
(Singapore Branch)
Civil
National Parks Board - - - Development of Admiralty Park at Woodlands 3Q 2014 2015 ST 30/11/13 - -
Engineering
Civil
National Parks Board - - - Development of Jurong Lake Park 2015 2016 ST 30/11/13 - -
Engineering
Civil
National Parks Board - - - Development of East Coast Park 2015 2016 ST 30/11/13 - -
Engineering
Page 5
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 6
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 7/6/13;
HSBC Institutional Trust Phase 3 - Design & build of a 5-storey warehouse
BT 7/6/13, Precise
Services (S) Ltd as trustee with ancillary office at 2nd to 5th mezzanine Ace Architects &
- - 46,243 Industrial Sep-2013 Jan-2015 26/7/13, Development Pte
for AIMS AMP Capital floors and additions & alterations to the existing Associates
6/9/13 & Ltd
Industrial REIT 5-storey warehouse at 20 Gul Way
24/10/13
Page 7
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 13/11/13
& URA tender
I Hotel Pte Ltd - 2,145 - Commercial Hotel development at Havelock Road - - - -
result
18/11/13
BT 11/10/13
Derman Aluminium (S) Pte Industrial development at
- 3,037 - Industrial - - & JTC tender - -
Ltd Plot 4, Tuas South Street 6
result 8/11/13
Page 8
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 11/10/13
Reclaims Enterprise Pte Industrial development at Plot 28, Tuas South
- 5,047 - Industrial - - & JTC tender - -
Ltd Street 7
result 8/11/13
Ministry of Health - - - Institutional Construction of the new Punggol Polyclinic - 2017 BT 28/10/13 - -
Page 9
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Singland Homes
Erection of a block of 40-storey condominium
(Alexandra) Pte Ltd ST 9/11/13 & P & T Consultants
- - - Residential comprising 429 units at Alexandra View - - -
[Subsidiary of Singapore BT 13/11/13 Pte Ltd
(Alex Residences)
Land Limited]
Page 10
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Keppel Bay Pte Ltd Erection of 11 blocks of 5 to 10-storey DCA Architects Pte
Woh Hup (Private)
(Subsidiary of Keppel - - 52,118 Residential condominium comprising 366 units Jun-2013 Oct-2016 BT 18/7/13 Ltd /Studio Daniel
Limited
Land) at Keppel Bay Drive (Corals at Keppel Bay) Libeskind
Page 11
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Sherwood Development
Erection of 6 blocks of 12-storey, 1 block of BT 17/4/13, Lum Chang
Pte Ltd (Keppel Land P & T Consultants
- - 56,112 Residential 11-storey & 2 blocks of 10-storey condominium Nov-2013 Nov-2016 18/7/13 & Building
Limited & China Vanke Co Pte Ltd
comprising 726 units at Bedok Rise (The Glades) 7/11/13 Contractors Pte Ltd
Ltd JV)
Surbana
Phase 2 - Construction of a new shipyard facility BT & ST
SembCorp Marine Ltd - 34.5 ha - Industrial - 2016/2017 International -
at Tuas View Extension 7/11/13
Consultants Pte Ltd
Page 12
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Westlite Dormitory (V
One) Pte Ltd [Indirect Residential Erection of a workers' dormitory for 4,100 foreign BT & ST
- 9,542 - - 2015 - -
subsidiary of Centurion Others workers at Woodlands Avenue 10 13/9/13
Corporation Limited]
Page 13
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Gammon
Civil Design & Construction of Mayflower Station for BT & ST Construction
Land Transport Authority 174 - - Oct-2013 May-2020 -
Engineering Thomson Line 19/10/13 Limited Singapore
Branch
Page 14
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Singapore Federation of more than Construction of a 10-storey Singapore Chinese ST 26/1/12 & DP Architects Pte
- 13,380 Institutional 2014 end 2015 -
Chinese Clan Associations $70m Cultural Centre at Shenton Way 23/10/13 Ltd
Page 15
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Lip Guan
Civil Flood prevention enhancement works for existing
Land Transport Authority 5.6 - - Jan-2013 Sep-2014 ST 7/10/13 - Construction Pte
Engineering MRT stations (Package 2)
Ltd
Page 16
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT&ST
Piling works for the construction of Changi
Changi Airport Group 9/2/13 & SAA Architects Pte CS Bored Pile
- - - Building Others Airport's Terminal 4 on the site of the former Sep-2013 May-2014
(Singapore) Pte Ltd 25/4/13; Ltd/Benoy System Pte Ltd
Budget Terminal
BT 14/9/13
Page 17
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Systems On Silicon
Manufacturing Company
Pte Ltd 125
Upgrading of the wafer fab facilities
(NXP & Taiwan (investment - - Industrial - - BT 30/9/13 - -
at Pasir Ris Drive 1
Semiconductor cost)
Manufacturing Company
JV)
Page 18
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Allamanda Residential
Erection of 2 blocks of 37-storey condominium BT 30/11/12
Development Pte Ltd DCA Architects Pte Dragages Singapore
- - 55,016 Residential comprising 694 units at Bishan Street 15 (Sky Oct-2013 Jul-2016 & 26/7/13;
(CapitaLand & Mitsubishi Ltd Pte Ltd
Vue) ST 20/9/13
Estate Asia JV)
Sing Holdings (Robin) Pte Erection of 5 blocks of 5-storey condominium Daiya Engneering &
BT 9/5/13 & Design Link
Ltd (Subsidiary of Sing - - 11,542 Residential with attic comprising 134 units at Robin Road Jul-2013 May-2015 Construction Pte
20/9/13 Architects Pte Ltd
Holdings Limited) (Robin Residences) Ltd
Page 19
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Sentosa Development Civil Design & build of the intra-island cableway ST 14/6/12 & SKM (Singapore) Doppelmayr
18.7 - - Sep-2012 Jan-2015
Corporation Engineering system at Sentosa 21/9/13 Pte Ltd Seilbahnen Gmbh
Page 20
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Hyundai
MS Commercial Pte Ltd, Erection of 2 blocks of 30-storey office, 2 blocks of
Engineering &
MS Residential 1 Pte Ltd & 34-storey residential buildings comprising 1,042
Residential & BT & ST Architects 61 Pte Construction Co Ltd
MS Residential 2 Pte Ltd & - - 492,306 units, a 3-storey commercial podium, basement Aug-2013 Aug-2016
Commercial 6/9/13 Ltd and GS Engineering
(Khazanah Nasional & carparks with underground pedestrian/shopping
& Construction
Temasek Holdings JV) mall at Straits View/Marina Way (Marina One)
Corp.
Ophir-Rochor Residential
Pte Ltd, Ophir-Rochor Erection of 1 block of 49-storey residential tower
Hotel Pte Ltd & comprising 660 units and 1 block of 39-storey
Residential & BT & ST DP Architects Pte Obayashi
Ophir-Rochor Commercial - - 166,000 office & hotel tower with a retail gallery at Aug-2013 Dec-2016
Commercial 6/9/13 Ltd Corporation
Pte Ltd (Khazanah Rochor Road/Beach Road/Ophir Road
Nasional & Temasek (Duo Residences/Duo Tower/Duo Galleria)
Holdings JV)
Page 21
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Champsworth
Erection of 9 blocks of 5-storey condominium Asiabuild
Development Pte Ltd JGP Architecture (S)
- - 15,435 Residential comprising 148 units at Pasir Panjang Road Aug-2013 Jan-2016 ST 14/9/13 Construction Pte
(Subsidiary of SDB Asia Pte Pte Ltd
(Village @ Pasir Panjang) Ltd
Ltd)
Page 22
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Changi Airport Group Civil Lengthening of the exising taxiway by more than
- - - - early 2015 BT 13/8/13 - -
(Singapore) Pte Ltd Engineering double at Seletar Airport
Renaissance Properties Pte Additions & alterations to the existing Telok Ayer DP Architects Pte LPS Constuction Pte
4 - 4,762 Commercial Sep-2013 Nov-2013 ST 1/9/13
Ltd Market (Lau Pa Sat) at 18 Raffles Quay Ltd Ltd
Page 23
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
LVND Investments Pte Ltd Upgrading of the Hotel Windsor & commercial
(Nobel Design Holdings podium comprising retail units from basement 1
- - - Commercial 1Q 2014 2015 BT 6/9/13 - -
Ltd, Lian Huat Group & 2E to level 3 and hotel from levels 4 to 9
Capital Pte Ltd JV) at 401 MacPherson Road (MacPherson Mall)
Laguna Hotel Holdings Pte more than Erection of a new golf resort hotel & upgrading of A.M. Associates
- - Commercial 4Q 2013 2015 ST 6/9/13 -
Ltd $100 m the existing clubhouse at Laguna Golf Green (Singapore) Pte Ltd
RSP Architects
Phase 6B - Erection of a 5-storey Design School at C K T Thomas Pte
Singapore Polytechnic 23.4 - 9,000 Institutional Jun-2012 Jan-2014 ST 8/9/13 Planners &
Dover Road Ltd
Engineers Pte Ltd
Page 24
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 25
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Evonik Methionine SEA Expansion of the oil-additives plant at Jurong BT 16/8/13 &
- - - Industrial - early 2015 - -
Pte Ltd Island 22/8/13
Page 26
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 27
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Punggol Matilda
Housing & Development
- - - Residential Development of 8,000 HDB units integrated with - - ST 30/8/13 - -
Board
an elevated landscaped deck
Tampines North
Housing & Development
Development of 17,000 HDB units & 4,000 private
Board and Private - - - Residential - - ST 30/8/13 - -
units, 2 new parks and
Developers
a shopping mall-cum-bus interchange
Majlis Ugama Islam Construction of the Al-Islah Mosque at Punggol ST 1/6/13 & Formwerkz GTMS Construction
15.6 - 3,767 Insitutional Aug-2013 Feb-2015
Singapura (MUIS) Field/Punggol Place 1/9/13 Architects Pte Ltd
Page 28
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 29
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 30
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Civil
Land Transport Authority - - - Construction of a new Tuas Depot - 2016 BT 15/5/13 - -
Engineering
Page 31
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 32
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 14/3/13,
Changi Airport Group Civil Construction of the third runway at Changi
- - - 2014 2020 18/3/13 & - -
(Singapore) Pte Ltd Engineering Airport
15/7/13
BT/ST
Changi Airport Group
- - - Building Others Construction of the Changi Airport's Terminal 5 - mid-2020s 19/8/13 & - -
(Singapore) Pte Ltd
20/8/13
Page 33
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT/ST
Changi Airport Group Civil
- - - Construction of the fourth runway at Changi East - - 19/8/13 & - -
(Singapore) Pte Ltd Engineering
20/8/13
BT/ST
Construction of a new Republic of Singapore Air
Ministry of Defence - - - Institutional - - 19/8/13 & - -
Force (RSAF) Airbase at Changi East
20/8/13
BT/ST
Civil
PSA Corporation Limited - - - Construction of a new port at Tuas - - 19/8/13 & - -
Engineering
20/8/13
Page 34
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Clerodendrum Land Pte Piling works for 3 blocks of 19-storey & 1 block of
BT 1/11/12 & MKPL Architects CS Bored Pile
Ltd (Subsidiary of Tuan - - 33,354 Residential 5-storey condominium comprising 332 units at Mar-2013 Jan-2014
ST 31/7/13 Pte Ltd System Pte Ltd
Sing Holdings) Pheng Geck Avenue (Sennett Residence)
Shelford Properties Pte Ltd Piling works for 1 block of 4-storey condominium
BT 1/11/12 & SCDA Architects CS Bored Pile
(Subsidiary of Tuan Sing - - 6,997 Residential comprising 52 units at Cluny Park Road Mar-2013 Sep-2013
ST 31/7/13 Pte Ltd System Pte Ltd
Holdings) (Cluny Park Residence)
Page 35
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Hong Kiat
MCL Land (Serangoon) Pte Erection of 32 units of 3-storey semi-detached P & T Consultants
- - 10,152 Residential Oct-2011 Apr-2014 BT 2/8/13 Construction Pte
Ltd houses at Sixth Avenue (Palms @ Sixth Avenue) Pte Ltd
Ltd
Page 36
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 37
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 38
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
National Environment Civil Development & construction of Phase 2 of the Between Jan to Mar BT 13/3/13 & Jurong Consultants
- - - early 2015 -
Agency Engineering Pulau Semakau landfill 2014 ST 2/8/13 Pte Ltd
Asiawide Resources Pte Erection of 6 blocks of 7-storey condominium Lee Kim Tah-Woh
ST 8/3/12 &
Ltd (Subsidiary of Allgreen - - 18,843 Residential comprising 248 units at River Valley Road Jun-2011 Jan-2014 Ong & Ong Pte Ltd Hup JV - RV
BT 6/8/13
Properties) (RV Residences) Residences
Page 39
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 40
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Rotary Mechanical
Shell Eastern Petroleum Pte Piping, steel structure, fabrication & insulation Chiyoda Singapore
17 - - Industrial Jun-2013 May-2014 BT 10/7/13 & Construction Co
Ltd works at Jurong Island Pte Ltd
Pte Ltd
Page 41
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Allamanda Residential
Development Pte Ltd Erection of 2 blocks of 37-storey condominium BT 30/11/12 DCA Architects Pte Dragages Singapore
- - 55,016 Residential Oct-2013 Dec-2016
(CapitaLand & Mitsubishi comprising 694 units at Bishan Street 15 & 26/7/13 Ltd Pte Ltd
Estate Asia JV)
Page 42
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 2/3/13;
Additions & Alterations to the existing Samson Tan EDZ Interior
Select Group Limited 4 - - Commercial Jul-2013 Oct-2013 2/5/13 &
Chinatown Food Street at Smith Street Associates Contracts Pte Ltd
29/7/13
Page 43
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Civil Construction of Caldecott MRT Station & DP Architects Pte Samsung C&T
Land Transport Authority 284.8 - - Jul-2013 Dec-2020 BT 26/7/13
Engineering associated tunnels for Thomson Line Ltd Corporation
Ley Choon
Civil Planned maintenance of roads, road related
Land Transport Authority 24.9 - - Jul-2013 Jul-2015 BT 1/8/13 - Constructions and
Engineering facilities & road structures in Central Sector
Engineering Pte Ltd
Ley Choon
Civil Planned maintenance of expressways, road
Land Transport Authority 39 - - Jul-2013 Jul-2015 BT 1/8/13 - Constructions and
Engineering related facilities & road structures
Engineering Pte Ltd
Page 44
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Singapore
Civil Implementation of a communication system for
Land Transport Authority 12.7 - - May-2013 Dec-2016 BT 6/7/13 - Technologies
Engineering Sengkang & Punggol Light Rapid Transit system
Electronics Limited
Page 45
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Crescent View
Developments Pte Ltd Residential development with the 1st storey as BT 7/9/12 &
- - 28,702 Residential 4Q 2013 4Q 2016 Aedas Pte Ltd -
(City Developments & commercial space at Tai Thong Crescent 16/7/13
Hong Leong Holdings JV)
Page 46
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 17/7/13 &
MCC Land (Singapore) Pte URA tender
- 17,103 - Residential Residential development at Tampines Avenue 10 - - - -
Ltd award
19/7/13
Page 47
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT & ST
Expansion of the existing Raffles Hospital at
Raffles Medical Group Ltd 80 to 100 - 9,394 Institutional end 2013 early 2016 24/7/12 ; - -
North Bridge Road
ST 23/7/13
RSP Architects
Orchard Landmark Pte Ltd
Erection of a block of 22-storey luxury Planners and
& Far East Lighthouse Pte BT & ST
- - - Residential condominium comprising 104 units - - Engineers Pte -
Ltd (Subsidiaries of Far 1/5/13
at 1 Leonie Hill (Ferra) Ltd/Paolo
East Organization)
Pininfarina of Italy
China Construction
Beauty World Properties Erection of a block of part 13/part 16-storey
DP Architects Pte (South Pacific)
Pte Ltd (Subsidiary of Far - - 6,078 Residential condominium comprising 76 units Aug-2011 Feb-2014 ST 25/5/13
Ltd Development Co
East Organization) at 25 Amber Road (The Cape)
Pte Ltd
Page 48
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 13/6/13 &
S.H. Stainless Steel Industrial development at Plot 1,
- 4,551 - Industrial - - JTC tender - -
Contractor Pte Ltd Tuas South Street 6
result 9/7/13
BT 13/6/13 &
Stallion Development Pte Industrial development at Plot 3,
- 3,036 - Industrial - - JTC tender - -
Ltd Tuas South Street 6
result 9/7/13
BT 13/6/13 &
Jin Choon Civil Industrial development at Plot 5,
- 3,036 - Industrial - - JTC tender - -
Engineering Pte Ltd Tuas South Street 6
result 9/7/13
Page 49
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 50
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Keppel Bay Pte Ltd Erection of 11 blocks of 5 to 10-storey BT & ST DCA Architects Pte
(Subsidiary of Keppel - - 47,380 Residential condominium comprising 366 units at Keppel Bay 2Q 2014 2Q 2017 18/5/13; Ltd /Studio Daniel -
Land) Drive (Corals at Keppel Bay) BT 18/7/13 Libeskind
MCL Land (Gateway) Pte Erection of 2 blocks of 38/34-storey & 20-storey Keong Hong
BT 25/6/13 & AGA Architects Pte
Ltd [Subsidiary of MCL 161.9 - 53,537 Residential condominium comprising 738 units at Boon Lay Jun-2013 Sep-2016 Construction Pte
28/6/13 Ltd
Land] Way/Gateway Drive (J Gateway) Ltd
Eng Lam
Civil Improvement to Roadside Drains IV Contract 4-2 Meinhardt
Public Utilities Board 10.2 - - Apr-2013 Oct-2015 BT 2/7/13 Contractors Co Pte
Engineering (Joo Chiat Areas) (Singapore) Pte Ltd
Ltd
Page 51
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Eng Lam
Civil Improvement works to Stamford Canal
Public Utilities Board 6.7 - - Jul-2013 Oct-2014 BT 2/7/13 - Contractors Co Pte
Engineering (from Napier Road to Marina Reservoir)
Ltd
Page 52
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Lian Soon
Additions & Alterations to existing Kuo Chuan
Ministry of Education 26.3 - 22,570 Institutional Jan-2013 Jul-2014 ST 4/7/13 LT & T Architects Construction Pte
Presbyterian Primary School at 8 Bishan Street 13
Ltd
Page 53
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Mequity (Hillview) Pte Ltd Erection of 3 blocks of 10-storey apartment Lim Wen Heng
ST 5/9/12 & JGP Architecture (S)
[Roxy-Pacific Holdings & - - 10,844 Residential buildings comprising 193 units at Hillview Oct-2012 Oct-2014 Construction Pte
BT 11/7/13 Pte Ltd
Macly Group JV] Terrace (Natura@Hillview) Ltd
BT 11/5/13 &
OKH Global Ltd - 20,633 - Industrial Industrial development at Loyang Way - - JTC tender - -
result 7/6/13
Page 54
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 55
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 19/6/13 &
URA tender
World Class Land Pte Ltd - 15,125 - Residential Residential development at Faber Walk - - - -
award
20/6/13
BT 21/6/13 &
Athens Residential
URA tender
Development Pte Ltd - 37,441 - Residential Residential development at Coronation Road - - - -
award
(Subsidiary of CapitaLand)
24/6/13
Page 56
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 57
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Le Premier Development
Pte Ltd
Redevelopment of Minton Court into high-end BT & ST
(Indirect wholly-owned - 1,233 - Residential - - - -
cluster houses at 21 Paya Lebar Crescent 26/6/13
subsidiary of Logistics
Holdings Limited)
Page 58
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Erection of a single-user part 4/part 5-storey light Apr-2013 (Piling); Sep-2013 (Piling); CS Bored Pile
Givaudan Singapore Pte ATA Architects Pte
- - - Industrial industrial building with a warehouse at Pioneer 3Q 2013 (Main 2014 (Main ST 27/6/13 System Pte Ltd
Ltd Ltd
Turn Contract) Contract) (Piling contractor)
Page 59
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 60
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Civil
Land Transport Authority 14 - - Sewer diversion at Springleaf station Jun-2013 Oct-2014 ST 14/6/13 - Swee Hong Limited
Engineering
Page 61
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Viking Facilities
Additions & Alterations to the existing factory at
Management & Operations 10 - 12,780 Industrial Jul-2013 Jul-2014 ST 27/4/13 Caide Architects Soil-Build Pte Ltd
Kian Teck Road (Viking Innovation Centre)
Pte Ltd
St. John's Home for Elderly Construction of a new 5-storey building at Wan
12 - - Institutional - - ST 10/6/13 - -
Persons Tho Avenue
Page 62
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Keppel Bay Pte Ltd Erection of 11 blocks of 5 to 10-storey DCA Architects Pte
BT & ST
(Subsidiary of Keppel - - 52,118 Residential condominium comprising 366 units at Keppel Bay 3Q 2013 3Q 2016 Ltd /Studio Daniel -
18/5/13
Land) Drive (Corals at Keppel Bay) Libeskind
Page 63
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 31/5/13 &
Qingjian Realty (South Executive condominium development at HDB tender
- 23,000 - Residential - - - -
Pacific) Group Pte Ltd Anchorvale Crescent award
31/5/13
Majlis Ugama Islam Construction of the Punggol Mosque at Punggol ST 24/2/13 & Formwerkz
17 to 19 - - Insitutional late 2013 2015 -
Singapura (MUIS) Field/Punggol Place 1/6/13 Architects
Page 64
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Church of St. Alphonus Upgrading & expansion of the Novena Church at ST 26/9/11 & CGN Architects Pte
45 - - Institutional - - -
(Novena Church) 300 Thomson Road 5/6/13 Ltd
Church of Saints Peter & Upgrading of the Church of Saints Peter & Paul at
- - - Institutional Oct-2013 - ST 5/6/13 - -
Paul 225C Queen Street
Page 65
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
SB (Westview) Investment
Erection of a block of 9-storey ramp-up factory AC Consortium Pte
Pte Ltd (Subsidiary of - - 37,524 Industrial May-2013 Aug-2014 BT 18/5/13 Soil-Build Pte Ltd
comprising 68 units at Bukit Batok Street 23 Ltd
Soilbuild Group)
25 (including
Upgrading of the Orchard Hotel Shopping BT & ST
CDL Hospitality Trusts miscellaneous - - Commercial late 2013 late 2014 - -
Arcade at Orchard Road 28/5/13
costs)
Page 66
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 67
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 10/5/13 &
Qingjian Realty (South Executive condominium development at HDB tender
- 21,004 - Residential - - - -
Pacific) Group Pte Ltd Woodlands Avenue 5/Woodlands Avenue 6 award
13/5/13
Page 68
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Precise
Design & Build of a 6-storey single-user
CWT Logistics (S) Pte Ltd - - 55,866 Industrial Oct-2012 Nov-2013 BT 15/5/13 Index Architects Development Pte
warehouse at 5A Toh Guan Road East
Ltd
Page 69
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 70
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT/ST
Design & build of 3 blocks of 21-storey
8/8/12; HDB
UVD Pte Ltd (Singapore condominium comprising 435 units & 10 units of Unison
- - 41,386 Residential Jan-2013 Aug-2015 tender award P & T Consultants
Land & UOL Group JV) 3-storey semi-detached houses at 18 Bright Hill Construction
10/8/12 & ST
Drive
4/5/13
Page 71
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 7/12/12,
HDB tender
Sing Holdings Limited & Executive condominium development at Punggol
- 14,307 - Residential 2Q 2013 - award - -
UE E&C Ltd JV Field Walk/Punggol East
10/12/12 &
BT 9/5/13
KVH (Singapore) Pte Ltd - - - Industrial Erection of a data centre in Singapore - - BT 19/4/13 - -
Page 72
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Erection of a 4-storey Indian Heritage Centre at ST 4/4/12 & Robert Greg Shand Yong Xing
National Heritage Board 20.8 - 2,989 Institutional Apr-2013 Jun-2014
Campbell Lane/Clive Street 11/4/13 & URBNarc Construction
Page 73
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 19/4/13 &
Harvestland Development
URA tender
Pte Ltd (Subsidiary of - 10,991 - Residential Residential development at Kim Tian Road - - - -
award
Keppel Land)
23/4/13
Page 74
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
SAA Architects,
BT&ST Benoy, AECOM
Changi Airport Group Construction of Changi Airport's Terminal 4 on
600 - - Building Others 4Q 2013 2017 9/2/13 & Singapore and Beca -
(Singapore) Pte Ltd the site of the former Budget Terminal
25/4/13 Carter Hollings &
Ferner (SEA)
DBS Trustee Limited 108 (including Erection of a 7-storey Data Centre at One-North,
(as Trustee of Mapletree investment - 35,749 Industrial Ayer Rajah Cluster 2Q 2013 4Q 2014 BT 28/3/13 3HPArchitects -
Industrial Trust) costs) (Equinix Singapore's 3rd Data Centre)
Page 75
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Action Property Pte Ltd Design & erection of a block of 9-storey factory
(Lian Beng Group, Oxley comprising 424 units & other ancillary facilities at AC Consortium Pte L.S. Construction
112 - 70,432 Industrial Apr-2013 Apr-2015 BT 4/4/13
Holdings & Sunview Pte Sunview Road/Jalan Buroh/Pioneer Road Ltd Pte Ltd
Ltd JV) (Eco-Tech@Sunview)
Oxley Bliss Pte Ltd (Oxley Design & erection of a part 3-storey/part 7-storey
AC Consortium Pte Deenn Engineering
Holdings & Lian Beng 89 - 65,892 Industrial multiple-user industrial building at Tampines Apr-2013 Apr-2015 BT 4/4/13
Ltd Pte Ltd
Group JV) Industrial Crescent
RB Capital Farrer Hotel Pte Mixed development of hotel & office at Rangoon RSP Architects
BT 18/4/12 &
Ltd & RB Capital Farrer - - 13,000 Commercial Road/Farrer Park Station Road 2013 2015 Planners & -
5/4/13
Commercial Pte Ltd (Park Hotel Farrer Park) Engineers
BT 12/4/13 &
Secure Development Pte
HDB tender
Ltd (Subsidiary of UOL - 16,604 - Residential Residential development at Sengkang West Way - - - -
award
Group)
12/4/13
Page 76
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 77
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Freshview Developments
Pte Ltd (City Erection of 2 blocks of 43-storey condominium Daewoo
Developments, Hong - - 52,057 Residential comprising 508 units at Alexandra View Apr-2013 Apr-2016 BT 8/1/13 SCDA Architects Engineering &
Leong Holdings & Hong (Echelon) Construction Co
Realty JV)
Page 78
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 13/3/13;
Construction of Sengkang General Hospital &
Ministry of Health - - - Institutional - 2018 BT&ST - -
Sengkang Community Hospital
2/12/11
Page 79
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 80
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 9/2/13 &
Boilermaster Holdings Pte Industrial development at Plot 10, Tuas South
- 3,036 - Industrial - - JTC tender - -
Ltd Street 8
result 21/3/13
BT 9/2/13 &
Soon Hock Group Pte Ltd - 39,616 - Industrial Industrial development at Tuas South Avenue 10 - - JTC tender - -
result 21/3/13
Page 81
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 82
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT&ST
Changi Airport Group Civil Construction of the third runway at Changi 18/7/12; ST
- - - - 2020 - -
(Singapore) Pte Ltd Engineering Airport 14/3/13 &
18/3/13
Evonik Methionine SEA 250 Million Construction of Evonik's 3rd plant at Jurong ST 14/11/12
- - Industrial - - - -
Pte Ltd Euro Island & BT 19/3/13
Page 83
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 84
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT/ST
Erection of a 13-storey hotel tower perched atop
22/1/13; BT
CEL-Alexandra Pte Ltd of a 6-storey podium comprising 3-storey of retail
28/1/13, Keong Hong
(Subsidiary of Chip Eng - - 22,249 Commercial space & 3-storey of carparks at Alexandra Mar-2013 Mar-2015 DP Architects
20/2/13 & Construction
Seng Corporation) Road/Jalan Bukit Merah
19/3/13; ST
(Park Hotel Alexandra and Alexandra Central)
27/3/13
BT 9/2/13 &
BP-Ubi Industrial Pte Ltd
JTC tender
(Part of Boustead - 3,504 - Industrial Industrial development at Ubi Avenue 4 - - - -
reault
Singapore)
11/3/13
China Construction
HDB Building & contingency works at Bedok
Housing & Development ADDP Architects (South Pacific)
180 - 119,247 Residential Neighbourhood 3 Contract 20 comprising 1,058 Mar-2013 Mar-2018 ST 18/3/13
Board LLP Development Co
units (Fengshan Greenville)
Pte Ltd
Page 85
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 86
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 87
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 88
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
National Environment Civil Development & construction of Phase 2 of the ST 12/6/12 &
- - - Jan-2014 1Q 2015 Jurong Consultants -
Agency Engineering Pulau Semakau landfill BT 13/3/13
Page 89
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 13/3/13 &
Public Utilities Board - - - Industrial Construction of the Tuas Water Reclamation Plant - 2022 - -
ST 14/3/13
BT 27/2/13 &
Fragrance Group Limited - 11,607 - Commercial Food & Beverage development at Punggol Point - - URA tender - -
result 7/3/13
Page 90
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 91
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 92
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
NTUC Income Insurance Upgrading of the existing Eastpoint Mall Avid Architects Pte
- - 29,020 Commercial 2Q 2013 2014 ST 5/2/13 -
Co-Operative Ltd at 3 Simei Street 6 Ltd
BT&ST
Changi Airport Group Construction of Changi Airport's Terminal 4 on
600 - - Building Others 4Q 2013 2017 1/3/12; - -
(Singapore) Pte Ltd the site of the former Budget Terminal
2/3/12; 9/2/13
Page 93
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Koh Brothers
Phase 2 - Improvement to Bukit Timah First
Civil CH2M Hill Building & Civil
Public Utilities Board 99.8 - - Diversion Canal Contract 2 Feb-2013 Feb-2016 BT 21/2/13
Engineering Singapore Engineering
(Bukit Timah Road to Holland Green)
Contractor
Page 94
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 4/1/13 &
Industrial development at Plot 32, Tuas South
SH Design & Build Pte Ltd - 8,732 - Industrial - - JTC tender - -
Street 6
result 1/2/13
Page 95
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 25/1/13 &
CEL Property Pte Ltd
Commercial & Mixed commercial and residential development HDB tender
(Subsidiary of Chip Eng - 8,858 - - - - -
Residential at Yishun Ring Road/Yishun Avenue 9 award
Seng Corporation)
31/1/13
BT 29/1/13 &
Erection of 9 blocks of 14/15-storey Executive 14/12/12; Keong Hong
Keong Hong Holdings Ltd Design Link
149.9 21,718 60,812 Residential Condominium at Sembawang 4Q 2013 - HDB tender Construction Pte
& JBE Holdings Pte Ltd JV Architects
Crescent/Sembawang Drive award Ltd
17/12/12
BT 30/1/13 &
MCL Land (Prestige) Pte
- 22,357 - Residential Residential development at Jurong West Street 41 - - URA tender - -
Ltd
result 31/1/13
Page 96
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
ST 25/8/12,
Civil Construction of cycling paths at Pasir Ris, Yishun,
Land Transport Authority - - - 2Q 2013 4Q 2015 11/9/12 & - -
Engineering Taman Jurong, Changi-Simei & Bedok
4/2/13
Page 97
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Civil Construction of Sengkang West Road from Yio Shan Young & Tuah Jin Choon Civil
Land Transport Authority 18.6 - - Aug-2011 Jan-2014 ST 15/10/12
Engineering Chu Kang Road to Tampines Expressway (TPE) Consultants Engineering
KTC Civil
Civil Construction of a road between Tampines Mott MacDonald
Land Transport Authority 26.4 - - Aug-2012 Feb-2015 ST 15/10/12 Enginering &
Engineering Expressway (TPE) & Yishun Avenue 6 Singapore
Construction
Page 98
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 99
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 100
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 101
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Bohai Investments
BT 30/1/13 &
(Sengkang) Pte Ltd & Industrial development off Woodlands Avenue
- 10,705 - Industrial - - JTC tender - -
Punggol Drive Investments 10
result 29/1/13
Pte Ltd
Page 102
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 103
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
1,300
(including
Erection of light & general industry factories at
Housing & Development construction, BT & ST
- - Industrial Defu Industrial Estate (Defu Industrial City) 2015 2017 - -
Board land & 6/12/12
infrastructure
cost)
Page 104
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Freshview Developments
Pte Ltd (City Erection of 2 blocks of 43-storey condominium
Developments, Hong - - 52,020 Residential comprising 508 units at Alexandra View 2013 2016 BT 8/1/13 SCDA Architects -
Leong Holdings & Hong (Echelon)
Realty JV)
Page 105
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Page 106
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
BT 9/1/13 &
Industrial development at Plot 8,
T. M. Transport Pte Ltd - 3,036 - Industrial - - JTC tender - -
Tuas South Street 8
result 8/1/13
BT 9/1/13 &
Industrial development at Plot 18, Tuas South
LNT Coating Pte Ltd - 4,527 - Industrial - - JTC tender - -
Street 8
result 8/1/13
Page 107
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
Menlo Worldwide
US $100m
Logistics Pte Ltd Construction of 2 new warehouse facilities in the BT & ST
(investment - - Industrial - 2016 - -
(Subsidiary of New York- western part of Singapore 10/1/13
cost)
listed Con-way Inc)
Ley Choon
Changi Airport Group Civil Rehabilitation works to aircraft parking stands at
15.3 - - Oct-2012 Dec-2014 BT 7/11/12 - Constructions and
(Singapore) Pte Ltd Engineering Singapore Changi Airport
Engineering Pte Ltd
Chin Kuan
Engineering &
Watermain repairs & other contract work for
Civil Contractors Pte Ltd
Public Utilities Board 9 - - Network Services (East) Division Oct-2012 Oct-2014 BT 7/11/12 -
Engineering (Subsidiary of Ley
for Year 2012-2014
Choon Group
Holdings)
Page 108
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.
Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)
95 (total ST 15/12/12;
Big Box Pte Ltd (Subsidiary Erection of an 8-storey warehouse cum retail Jian Huang
investment - - Commercial Jun-2012 Jan-2014 BT & ST Jurong Consultants
of TT International) building at Jurong East Street 11 (Big Box) Construction Co
cost) 5/1/12
Surbana
Housing & Development Building works at Kallang Whampoa Contract Singapore Piling &
108 - - Residential Dec-2012 Nov-2015 BT 20/12/12 International
Board 23B comprising 808 units Civil Engineering
Consultants
Surbana
Housing & Development Building works at Sengkang Neighbourhood 2
74.9 - - Residential Dec-2012 Apr-2015 BT 20/12/12 International Singa Development
Board Contract 43B comprising 474 units
Consultants
Page 109