Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 109

Construction Project Listing*

(Last Updated on 20/12/2013)


*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Redevelopment into a 6 Storey Shopping Mall


Raffles Medical Group Ltd - 5,827 - Institutional with 2 levels of Basement Carpark at 100 Taman - - ST 17/12/13 - -
Warna

BT 11/12/13
Grow-Tech Properties Pte
Industrial development at Gambas Crescent & URA tender
Ltd (Part of Far East - 14,302 - Industrial - - - -
(Parcel 3) result
Organization)
13/12/13

Kim Seng Heng


Addition of a 5 Storey Building to United World
United World College BLT Architecture & Engineering
42.5 - - Institutional College South East Asia (UWCSEA) campus at Dec-2013 Aug-2015 BT 13/12/13
South East Asia (UWCSEA) Design Construction Pte
Dover Road
Ltd

Erection of an LPG Terminal to import alternative


Vopak Terminals BT/ST
- - - Industrial Liquefied Petroleum Gas feedstock at Banyan - 1Q 2016 - -
Singapore Pte Ltd 11/12/13
Terminal in Jurong Island

BT/ST
Residential development comprising 281 units 16/11/12 &
World Class Developments
with 24 hour concierge service and 18 commercial 11/12/13 &
(North) Pte Ltd [Subsidiary - 10,170 - Residential - - - -
units at Jalan Jurong Kechil URA tender
of Aspial Corporation]
(The Hillford) result
22/11/12

Page 1
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Arcadia Development Pte Erection of a 71-storey apartment building


ST 21/3/12;
Ltd (Subsidiary of Allgreen - - 23,420 Residential comprising 360 units at Enggor Street Mar-2011 Sep-2014 P & T Consultants Woh Hup
07/12/13
Properties) (Skysuites@Anson)

Reconstruction of El Centro into an 18-storey


building comprising 56 residential units & 13 BT 5/9/13 &
Heeton Holdings Limited - - - Residential - - - -
commercial units at Kee Seng Street ST 07/12/13
(Onze @ Tanjong Pagar)

Mixed development of a 20/64-storey building


comprising 6-storey commercial & carpark BT&ST
JV between GuocoLand & 3,200 podium, 14-storey hotel, 32-storey office & 24/2/11, Architects 61 with
Commercial & Samsung C&T
Employees Provident Fund (including land - 157,738 26-storey residential apartments comprising 181 Apr-2013 May-2016 17/6/11, Skidmore, Owings
Residential Corporation
(EPF) of Malaysia cost) units at Peck Seah Street/Choon Guan Street 3/5/13 & & Merrill of USA
(Tanjong Pagar Centre/Guoco Tower/Clermont 7/12/13
Residence)

Ley Choon
Civil Laying of gas transmission pipelines from Jalan
PowerGas Ltd 9.9 - - Nov-2013 Aug-2015 BT 25/9/13 - Constructions and
Engineering Bahar to Old Choa Chu Kang Road
Engineering Pte Ltd

Civil Laying of gas transmission pipelines from Old


PowerGas Ltd 13.7 - - Nov-2013 Sep-2015 BT 25/9/13 - Teacly (S) Pte Ltd
Engineering Choa Chu Kang Road to Choa Chu Kang Way

Page 2
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Final premix surfacing, reinstatement & ancillary Ley Choon


Civil
JTC Corporation 2.2 - - works at Tuas South Lane, Woodlands Close & Oct-2013 Jul-2014 BT 25/9/13 - Constructions and
Engineering
Yishun Industrial Street 1 Engineering Pte Ltd

BT 18/10/13
Grow-Tech Properties Pte
Industrial development at Gambas Crescent & URA tender
Ltd (Part of Far East - 12,067 - Industrial - - - -
(Parcel 1) result
Organization)
23/10/13

BT 18/10/13
Grow-Tech Properties Pte
Industrial development at Gambas Crescent & URA tender
Ltd (Part of Far East - 13,537 - Industrial - - - -
(Parcel 2) result
Organization)
23/10/13

BT 29/11/13
Kingsford Development Residential development at Upper Serangoon
- 15,341 - Residential - - & URA tender - -
Pte Ltd View (Parcel A)
result 2/12/13

BT 29/11/13
Kingsford Development Residential development at Upper Serangoon
- 11,951 - Residential - - & URA tender - -
Pte Ltd View (Parcel B)
result 2/12/13

Page 3
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of a 5-storey building with attic & East Asia


Kensington Village Pte Ltd
Residential & basement carpark comprising 57 shops at 1st ST 29/8/13 & Engineering &
(Fragrance Group & World - - 14,492 Oct-2013 Jul-2015 HUAY Architects
Commercial storey & 141 apartment units above at Jalan 22/10/13 Construction Pte
Class Land JV)
Lokam (Kensington Square) Ltd

Erection of 8 blocks of 5-storey condominium at


Chiu Teng @ Bukit Timah
- - - Residential Toh Tuck Road - - ST 26/10/13 Ong & Ong Pte Ltd -
Pte Ltd
(The Creek @ Bukit)

Wingcrown Investment Pte


Design & Build of 4 blocks of 5-storey & 3 blocks Greatearth
Ltd P & T Consultants
- - 54,944 Residential of 24-storey condominium comprising 469 units Jun-2013 Nov-2015 ST 30/5/13 Construction Pte
(Wing Tai Holdings, Metro Pte Ltd
at Prince Charles Crescent (The Crest) Ltd
Holdings & UE E&C JV)

Leighton
Contractors (Asia)
Civil Construction of Springleaf station and tunnels for BT & ST
Land Transport Authority 383 - - Nov-2013 May-2020 - Limited (Singapore
Engineering Thomson Line 16/11/13
Branch) - John
Holland Pty Ltd JV

Civil Construction of Upper Thomson station and BT & ST Sato Kogyo (S) Pte
Land Transport Authority 374 - - Nov-2013 May-2020 -
Engineering tunnels for Thomson Line 16/11/13 Ltd

Page 4
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Civil Construction of Woodlands North station and Penta-Ocean


Land Transport Authority 337 - - Nov-2013 Sep-2019 BT 30/11/13 -
Engineering associated tunnels for Thomson Line Construction Co Ltd

Sinohydro
Civil Construction of Napier station and associated
Land Transport Authority 189 - - Nov-2013 Sep-2020 BT 30/11/13 - Corporation Ltd
Engineering tunnels for Thomson Line
(Singapore Branch)

Civil
National Parks Board - - - Development of Admiralty Park at Woodlands 3Q 2014 2015 ST 30/11/13 - -
Engineering

Civil
National Parks Board - - - Development of Jurong Lake Park 2015 2016 ST 30/11/13 - -
Engineering

Civil
National Parks Board - - - Development of East Coast Park 2015 2016 ST 30/11/13 - -
Engineering

Page 5
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of a 6-storey building comprising a


Commercial state-of-the-art TV production studio & a new
StarHub Ltd - 8,590 - - - ST 30/11/13 - -
Others social media analytics lab at One-North, Buona
Vista (MediaHub)

Extension of the Singapore Botanic Gardens at


Civil ST 4/3/13 &
National Parks Board - - - Tyersall Avenue 2Q 2014 2016 - -
Engineering 1/12/13
(Tyersall Learning Forest)

Restoration works to Singapore Yu Huang Gong Hui He General


ST 3/8/12 & Design Link
Taoist Mission Singapore 3.5 - - Institutional or Temple of Heavenly Jade Emperor at 150 Telok Jul-2012 Jun-2014 Construction Pte
3/12/13 Architects Pte Ltd
Ayer Street Ltd

Building works at Woodlands Neighbourhood 7 Surbana Tiong Seng


Housing & Development
204.5 - - Residential Contracts 29 & 30 comprising 1,434 dwelling Dec-2013 Jan-2017 BT 4/12/13 International Contractors
Board
units including contingency works Consultants Pte Ltd (Private) Limited

Redevelopment of The Pines Club into 2 blocks of


Oxley Gem Pte Ltd
8-storey hotel, 2 blocks of 2-storey commercial ST 22/3/13 & DP Architects Pte
(Subsidiary of Oxley - - 29,556 Commercial 2014 2016/2017 -
buildings & 1 block of 4-storey clubhouse with 5/12/13 Ltd
Holdings Limited)
basement at 30 Stevens Road

Page 6
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

ST 7/6/13;
HSBC Institutional Trust Phase 3 - Design & build of a 5-storey warehouse
BT 7/6/13, Precise
Services (S) Ltd as trustee with ancillary office at 2nd to 5th mezzanine Ace Architects &
- - 46,243 Industrial Sep-2013 Jan-2015 26/7/13, Development Pte
for AIMS AMP Capital floors and additions & alterations to the existing Associates
6/9/13 & Ltd
Industrial REIT 5-storey warehouse at 20 Gul Way
24/10/13

Erection of 4,978 Build-to-Order (BTO) flats at


Bukit Batok (West Ridges @ Bukit Batok),
Housing & Development Hougang (Hougang Meadow), Jurong West BT & ST
- - - Residential - - - -
Board (Boon Lay View & Yung Kuang Court), 27/11/13
Sembawang (EastLawn @ Canberra) and
Woodlands (Admiralty Grove)

Communications and control system for the Singapore


Land Transport Authority 0.7 - - Building Others relocation of sub-station at Woodlands Station Aug-2013 Aug-2014 BT 10/10/13 - Technologies
(North-South Line) Electronics Limited

Erection of the Clinical Sciences Building and


Experimental Medicine Building at Novena ST 27/9/13 &
Nanyang Technological DP Architects Pte
- - 58,532 Institutional Campus - Mandalay Road/Yunnan Garden 1Q 2014 2Q 2016 24/10/13; BT -
University Ltd
Campus (3rd Medical School - Partnership 6/11/13
between NTU & Imperial College of London)

Erection of a new 12-storey nursing home at


Ministry of Health - - 22,605 Institutional 2015 2017 ST 8/11/2013 - -
Serangoon Road

Page 7
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Additions & alterations to an existing 3-storey


Kwong Wai Shiu Hospital - - 5,944 Institutional building & three single-storey buildings at 2017 2018 ST 8/11/2013 - -
Serangoon Road

BT 13/11/13
& URA tender
I Hotel Pte Ltd - 2,145 - Commercial Hotel development at Havelock Road - - - -
result
18/11/13

Erection of a part single-storey & part 2-storey


Vector Aerospace Asia Pte BT & ST Liu & Wo Architects
13 - 5,389 Industrial factory building with ancillary office on the 2nd Dec-2013 Aug-2014 Soil-Build Pte Ltd
Ltd 19/11/13 Pte Ltd
storey at Seletar Aerospace View

National Environment Construction of the 6th waste-to-energy


- - - Industrial 2015 2018 ST 11/9/13 - -
Agency incineration plant in Singapore

BT 11/10/13
Derman Aluminium (S) Pte Industrial development at
- 3,037 - Industrial - - & JTC tender - -
Ltd Plot 4, Tuas South Street 6
result 8/11/13

Page 8
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT 11/10/13
Reclaims Enterprise Pte Industrial development at Plot 28, Tuas South
- 5,047 - Industrial - - & JTC tender - -
Ltd Street 7
result 8/11/13

Additions & alterations to the existing factories at


Neo Group Limited - - - Industrial - - BT 11/10/13 - -
1, 3, 5, 7 & 9 Enterprise Road

Construction of a new general hospital in the ST 13/3/13 &


Ministry of Health - - - Institutional - 2020-2030 - -
North likely to be located in or near Woodlands 28/10/13

Ministry of Health - - - Institutional Construction of the new Punggol Polyclinic - 2017 BT 28/10/13 - -

Piling works for the erection of 4 podiums (1st to


4th storey), 2 basements & 3 towers (General &
Community Hospitals from 5th to 10th storey &
DP Architects Pte Resource Piling Pte
Ministry of Health 66 - 288,000 Institutional Specialist Outpatient Clinics from 3rd to 10th Oct-2013 Oct-2014 ST 28/10/13
Ltd Ltd
storey) at Sengkang East Way/Sengkang East
Road (Sengkang General & Community
Hospitals)

Page 9
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Shelford Properties Pte Ltd Main Contract - Erection of a block of 4-storey


SCDA Architects Hock Guan Cheong
(Subsidiary of Tuan Sing - - 6,997 Residential condominium comprising 52 units at Cluny Park Sep-2013 Sep-2015 BT 31/10/13
Pte ltd Builder Pte Ltd
Holdings) Road (Cluny Park Residence)

Main Contract - Erection of 3 blocks of 19-storey


Clerodendrum Land Pte Rich-Link
& 1 block of 5-storey condominium comprising MKPL Architects
Ltd (Subsidiary of Tuan - - 33,354 Residential Dec-2013 Dec-2015 BT 31/10/13 Construction Pte
332 units & 3 shops at Pheng Geck Avenue Pte Ltd
Sing Holdings) Ltd
(Sennett Residence)

Upgrading of an existing building as a hub for the


Ministry of Social and
- - - Institutional support services for the disabled at 141 Redhill 4Q 2014 early 2015 ST 9/11/13 - -
Family Development
Road

Singland Homes
Erection of a block of 40-storey condominium
(Alexandra) Pte Ltd ST 9/11/13 & P & T Consultants
- - - Residential comprising 429 units at Alexandra View - - -
[Subsidiary of Singapore BT 13/11/13 Pte Ltd
(Alex Residences)
Land Limited]

Design & Build of a 4-storey community building


with a basement carpark comprising a
Wan Chung
community club, a hawker centre, a senior care ST 5/7/13 &
People's Association 29.8 - 11,100 Recreational Sep-2013 Mar-2015 3PA International Construction
centre & a primary care centre at Hougang 20/10/13
(Singapore) Pte Ltd
Avenue 9
(Ci Yuan Community Club)

Page 10
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Design & Build of 3 blocks of 25-storey & 1 block


Verspring Properties Pte
of 20-storey Executive Condominium comprising ADDP Architects Nakano Singapore
Ltd (Subsidiary of City - - 42,302 Residential Sep-2013 Jun-2016 BT 17/7/13
380 units at Sengkang West Way/Fernvale Link LLP Pte Ltd
Developments)
(Lush Acres)

Keppel Bay Pte Ltd Erection of 11 blocks of 5 to 10-storey DCA Architects Pte
Woh Hup (Private)
(Subsidiary of Keppel - - 52,118 Residential condominium comprising 366 units Jun-2013 Oct-2016 BT 18/7/13 Ltd /Studio Daniel
Limited
Land) at Keppel Bay Drive (Corals at Keppel Bay) Libeskind

Design, build & lease of 1 block of 8-storey & 2


HA Architects Pte Boustead Projects
BP-TN Pte Ltd - - 24,800 Industrial blocks of part 1/part 2-storey industrial buildings Oct-2013 Mar-2015 BT 29/10/13
Ltd Pte Ltd
at Tukang Innovation Drive

Additions & alterations to the existing Fairfield


Guan Ho
Fairfield Methodist School Methodist School (Primary) & erection of a Interconsultants Pte
17.9 - 7,196 Institutional Sep-2013 Sep-2015 ST 1/11/13 Construction Co Pte
(Primary) 4-storey indoor sport hall, a 3-storey & 4-storey Ltd
Ltd
special teaching buildings at 100 Dover Road

Erection of a 2-storey market & hawker centre


Lian Soon
National Environment with mezzanine & 2 basement carparks at Bukit SQFT Architects Pte
33.9 - 8,350 Commercial Nov-2013 May-2015 ST 4/11/13 Construction Pte
Agency Panjang Ring Road Ltd
Ltd
(Bukit Panjang Hawker Centre & Market)

Page 11
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Sherwood Development
Erection of 6 blocks of 12-storey, 1 block of BT 17/4/13, Lum Chang
Pte Ltd (Keppel Land P & T Consultants
- - 56,112 Residential 11-storey & 2 blocks of 10-storey condominium Nov-2013 Nov-2016 18/7/13 & Building
Limited & China Vanke Co Pte Ltd
comprising 726 units at Bedok Rise (The Glades) 7/11/13 Contractors Pte Ltd
Ltd JV)

Civil Construction of the Circle Line Stage 6 connecting


Land Transport Authority - - - - 2025 ST 7/11/13 - -
Engineering HarbourFront Station to Marina Bay Station

Surbana
Phase 2 - Construction of a new shipyard facility BT & ST
SembCorp Marine Ltd - 34.5 ha - Industrial - 2016/2017 International -
at Tuas View Extension 7/11/13
Consultants Pte Ltd

Phase 3 - Construction of a new shipyard facility BT & ST


SembCorp Marine Ltd - 98.2 ha - Industrial - - - -
at Tuas View Extension 7/11/13

Main Contract - Erection of a single-user part


Givaudan Singapore Pte ATA Architects Pte M+W Singapore Pte
- - 22,161 Industrial 4/part 5-storey light industrial building with a Sep-2013 Jun-2015 ST 27/6/13
Ltd Ltd Ltd
warehouse at Pioneer Turn

Page 12
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Singapore Lube Park Pte Package A - Engineering, Procurement &


Ltd [Shell Eastern Construction of the tank farms, utilities,
BT 31/7/13 & Rotary Engineering
Petroleum, Sinopec - - - Industrial interconnecting pipelines & jetty topsides for Jul-2013 Jul-2015 -
7/8/13 Limited
Lubricant (Singapore) & Lube Park shared facility at Tuas South View
Total Oil Asia Pacific JV] (Singapore Lube Park)

Singapore Lube Park Pte


Ltd [Shell Eastern Package B - Development of a jetty for Lube Park
Civil BT & ST Steen Consultants Antara Koh Private
Petroleum, Sinopec - - - shared facility at Tuas South View Jul-2013 Jul-2014
Engineering 17/7/13 Pte Ltd Limited
Lubricant (Singapore) & (Singapore Lube Park)
Total Oil Asia Pacific JV]

Westlite Dormitory (V
One) Pte Ltd [Indirect Residential Erection of a workers' dormitory for 4,100 foreign BT & ST
- 9,542 - - 2015 - -
subsidiary of Centurion Others workers at Woodlands Avenue 10 13/9/13
Corporation Limited]

Civil BT & ST Jurong Primewide


Land Transport Authority 329 - - Construction of Mandai Depot for Thomson Line Nov-2013 Sep-2019 -
Engineering 19/10/13 Pte Ltd

Construction of Woodlands Station & its


Civil BT & ST GS Engineering &
Land Transport Authority 292 - - associated cut-and-cover tunnels for Thomson Oct-2013 Sep-2019 -
Engineering 19/10/13 Construction Corp.
Line

Page 13
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

China Railway No.5


Civil Design & Construction of Lentor Station and its BT & ST Engineering Group
Land Transport Authority 247 - - Oct-2013 May-2020 -
Engineering associated tunnels for Thomson Line 19/10/13 Co Ltd Singapore
Branch

Gammon
Civil Design & Construction of Mayflower Station for BT & ST Construction
Land Transport Authority 174 - - Oct-2013 May-2020 -
Engineering Thomson Line 19/10/13 Limited Singapore
Branch

Conservation and Additions & Alterations to 6


WRH Pte Ltd units of 2-storey shophouses with shops on 1st BT & ST
Residential & S H Lim Architects Tokyu Construction
(Subsidiary of Warees - - 3,921 storey and a 5-storey rear extension comprising Aug-2013 Mar-2015 22/6/13;
Commercial Pte Ltd Co Ltd
Investments Pte Ltd 42 residential units at 63 East Coast Road ST 31/10/13
(The Red House)

Erection of a 2-storey good class bungalow at BDL Group Sysma Construction


Private owners 7.5 - 1,451 Residential Dec-2013 Jun-2015 BT 27/9/13
Jervois Hill Architects Pte Ltd

Additions & alterations to the Cathedral of the Shanghai Chong


The Titular Roman
Good Shepherd & conserved 2-storey rectory, ST 10/5/13 & Architects 61 Pte Kee Furniture &
Catholic Archbishop of - - 5,200 Institutional Nov-2013 Oct-2015
and erection of a 3-storey annex block with a 15/10/13 Ltd Construction Pte
Singapore
basement at Queen Street Ltd

Page 14
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Singapore Federation of more than Construction of a 10-storey Singapore Chinese ST 26/1/12 & DP Architects Pte
- 13,380 Institutional 2014 end 2015 -
Chinese Clan Associations $70m Cultural Centre at Shenton Way 23/10/13 Ltd

Completion contract for design & construction of McConnell Dowell


Civil
Land Transport Authority 254.1 - - Sixth Avenue and King Albert Park Stations & Aug-2013 Jan-2016 ST 30/8/13 Ong & Ong Pte Ltd South East Asia Pte
Engineering
tunnels for Downtown Line Stage 2 Ltd

Completion contract for design & construction of


Civil SK E&C (Singapore
Land Transport Authority 222 - - Tan Kah Kee Station & tunnels for Downtown Aug-2013 Jan-2016 ST 30/8/13 Ong & Ong Pte Ltd
Engineering Branch)
Line Stage 2

Redevelopment of the former Marine Point into 2


Tiong Aik
Ladyhill (Private) Limited blocks of 16/17-storey condominium comprising BT 26/7/13 & MKPL Architects
60.2 - 10,985 Residential Oct-2013 Aug-2016 Construction Pte
[Subsidiary of CapitaLand] 120 units & 4 units of 2-storey terrace houses ST 1/10/13 Pte Ltd
Ltd
at 95 Marine Parade Road

Civil Upgrading of Canberra Park opposite Block 324


Nee Soon Town Council 2 - - Aug-2013 Aug-2014 ST 7/10/13 - TSL Builders Pte Ltd
Engineering Sembawang Crescent

Page 15
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Lip Guan
Civil Flood prevention enhancement works for existing
Land Transport Authority 5.6 - - Jan-2013 Sep-2014 ST 7/10/13 - Construction Pte
Engineering MRT stations (Package 2)
Ltd

Erection of a 12-storey mixed development


comprising a 10-storey residential tower
Oxley-Lian Beng Pte Ltd RSP Architects Lian Beng
Residential & (160 units) & a 2-storey retail podium (107 units) ST 18/5/13 &
(Oxley Holdings & Lian - - 16,853 Sep-2013 Dec-2015 Planners & Construction (!988)
Commercial with 2 basements of retail/carpark 11/10/13
Beng Group JV) Engineers Pte Ltd Pte Ltd
at Upper Serangoon Road
(Midtown Residences/The Midtown)

Tripartite Developers Pte


Ltd (Hong Leong Erection of 9 blocks of 8-storey condominium Lian Beng
BT 25/6/13 &
Holdings, City 115 - 33,290 Residential comprising 396 units at Flora Drive Jul-2013 Oct-2015 Ong & Ong Pte Ltd Construction (1988)
ST 12/10/13
Developments & TID Pte (The Inflora) Pte Ltd
Ltd JV)

Construction of 4 new neighbourhood centres in


Housing & Development BT & ST
- - - Commercial Punggol, Hougang & Sembawang over the next - - - -
Board 15/10/13
five years

Unique Resi Estate Pte Ltd


Erection of 8 units of 2-storey semi-detached
(Heeton Holdings, Kim
houses & a 2-storey detached house each with an Millennium Sinotac Builder's (S)
Seng Heng Realty, Zap 17.2 - 2,598 Residential Sep-2013 Oct-2015 ST 1/10/13
attic, basement & swimming pool at 121C Architects Pte Ltd Pte Ltd
Piling & Raffles Asia
Whitley Road
Capital JV)

Page 16
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 3 pilot automated mechanised


Housing & Development BT & ST
- - - Building Others carparks at Bangkit Road, Yishun Avenue 4 & - end 2015 - -
Board 7/10/13
Changi Village Road

Erection of a 14-storey mixed development


CEL-Yishun (Commercial) comprising a 3-storey retail cum carpark podium
CES Engineering &
Pte Ltd & CEL-Yishun Commercial & (146 retail units), 2 blocks of 11-storey & 1 block P & T Consultants
- - 26,291 Sep-2013 Nov-2015 BT 10/10/13 Construction Pte
(Residential) Pte Ltd [Part Residential of 2-storey apartment buildings (186 residential Pte Ltd
Ltd
of Chip Eng Seng Group] units) at Yishun Avenue 9
(Junction Nine/Nine Residences)

Hao Yuan Development


Design & Build of 12 blocks of 10 to 13-storey of ST 20/7/13,
Pte Ltd (Hao Yuan AGA Architects Pte GLG Engineering
- - 58,086 Residential Executive Condominium comprising 495 units Jul-2013 Jul-2016 3/8/13 &
Investment Pte Ltd & Ltd Pte Ltd
at Pasir Ris Drive 3/Pasir Ris Rise (Sea Horizon) 10/9/13
Sustained Land Pte Ltd JV)

BT&ST
Piling works for the construction of Changi
Changi Airport Group 9/2/13 & SAA Architects Pte CS Bored Pile
- - - Building Others Airport's Terminal 4 on the site of the former Sep-2013 May-2014
(Singapore) Pte Ltd 25/4/13; Ltd/Benoy System Pte Ltd
Budget Terminal
BT 14/9/13

Erection of 4,156 Build-to-Order (BTO) flats at


Yishun (Khatib Court, Palm Breeze @ Yishun &
Housing & Development BT & ST
- - - Residential Saraca Breeze @ Yishun) and Punggol (Matilda - - - -
Board 27/9/13
Edge, Waterway View & The Verandah @
Matilda)

Page 17
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

S P Setia International (S) Erection of a block of 15-storey condominium


CPG Consultants China Construction
Pte Ltd [Subsidiary of S P - - 7,621 Residential comprising 101 units at 18 Woodsville Close Jan-2013 Mar-2015 BT 27/9/13
Pte Ltd Realty Co Pte Ltd
Setia Berhad Group) (18 Woodsville)

Systems On Silicon
Manufacturing Company
Pte Ltd 125
Upgrading of the wafer fab facilities
(NXP & Taiwan (investment - - Industrial - - BT 30/9/13 - -
at Pasir Ris Drive 1
Semiconductor cost)
Manufacturing Company
JV)

Design, build & lease of a 6-storey expansion


block to an existing 7-storey advanced R&D and
Architects Team 3 Boustead Projects
BP-CA Pte Ltd - - 4,921 Industrial technology centre for Continental Automotive Aug-2013 Oct-2014 BT 27/7/13
Pte Ltd Pte Ltd
Singapore Pte Ltd at Kallang iPark/Boon Keng
Road

Civil Construction of a new surface road hugging the


Land Transport Authority - - - - - ST 31/8/13 - -
Engineering eastern coastline to replace Changi Coast Road

Civil Construction of a new park connector at the new


National Parks Board - - - - - ST 31/8/13 - -
Engineering Changi Coast Road

Page 18
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Hoi Hup Realty Pte Ltd ,


BT 11/9/13 &
Sunway Developments Pte
- 23,771 - Residential Residential development at Mount Sophia - - URA tender - -
Ltd & S C Wong Holdings
result 12/9/13
Pte Ltd

Allamanda Residential
Erection of 2 blocks of 37-storey condominium BT 30/11/12
Development Pte Ltd DCA Architects Pte Dragages Singapore
- - 55,016 Residential comprising 694 units at Bishan Street 15 (Sky Oct-2013 Jul-2016 & 26/7/13;
(CapitaLand & Mitsubishi Ltd Pte Ltd
Vue) ST 20/9/13
Estate Asia JV)

Sing Holdings (Robin) Pte Erection of 5 blocks of 5-storey condominium Daiya Engneering &
BT 9/5/13 & Design Link
Ltd (Subsidiary of Sing - - 11,542 Residential with attic comprising 134 units at Robin Road Jul-2013 May-2015 Construction Pte
20/9/13 Architects Pte Ltd
Holdings Limited) (Robin Residences) Ltd

Erection of 2 blocks of 20-storey & 28-storey


condominium comprising 320 units, 2 blocks
China Construction
Boo Han Holdings Pte Ltd of 3-storey terrace houses comprising 18 units & 1
BT 21/1/13 & RDC Architects Pte (South Pacific)
(Subsidiary of Far East - - 35,455 Residential block of 17-storey serviced apartment comprising Jan-2013 Jul-2015
21/9/13 Ltd Development Co
Organization) 185 rooms at West Coast Link/West Coast
Pte Ltd
Crescent (Seahill/Oasia West Serviced
Residences)

Erection of 1 block of 22-storey & 1 block of China Construction


Transurban Properties Pte RSP Architects
Residential & 28-storey SOHO apartments comprising 528 units ST 3/1/12 & (South Pacific)
Ltd (Subsidiary of Far East - - 40,025 Jun-2012 Oct-2015 Planners &
Commercial (The Hillier) and a 2-storey retail mall (hillV2) at 21/9/13 Development Co
Organization) Engineers Pte Ltd
Hillview Avenue Pte Ltd

Page 19
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Sentosa Development Civil Design & build of the intra-island cableway ST 14/6/12 & SKM (Singapore) Doppelmayr
18.7 - - Sep-2012 Jan-2015
Corporation Engineering system at Sentosa 21/9/13 Pte Ltd Seilbahnen Gmbh

Construction of 3 intra-island cableway stations, RSP Architects


Sentosa Development Civil ST 14/6/12 &
46.8 - - 8 cableway tower foundations & a Fort Siloso Apr-2013 Jan-2015 Planners & Gammon Pte Ltd
Corporation Engineering 21/9/13
pedestrian bridge with a lift tower at Sentosa Engineers Pte Ltd

Erection of a 7-storey Interpol Global Complex &


CPG Consultants Incorporated
Ministry of Home Affairs 75 - 15,210 Institutional a 4-storey with a basement annex block at Napier Jan-2013 Sep-2014 ST 24/9/13
Pte Ltd Builders Pte Ltd
Road

Expansion of the St Joseph's Home at 921 Jurong


St Joseph's Home - - - Institutional 2014 - ST 25/9/13 - -
Road

Oxley Viva Pte Ltd (Oxley


Holdings, Heeton Erection of a part 5/part 12-storey mixed Kim Seng Heng
Holdings, KSH Holdings, Residential & development building comprising 136 residential ST 21/5/13 & DP Architects Pte Engineering
98.9 - 25,149 Sep-2013 Mar-2016
Lian Beng Group, TEE Commercial units & 141 commercial units at West Coast Drive BT 28/8/13 Ltd Construction Pte
International & Zap Piling (NEWest) Ltd
JV)

Page 20
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Hyundai
MS Commercial Pte Ltd, Erection of 2 blocks of 30-storey office, 2 blocks of
Engineering &
MS Residential 1 Pte Ltd & 34-storey residential buildings comprising 1,042
Residential & BT & ST Architects 61 Pte Construction Co Ltd
MS Residential 2 Pte Ltd & - - 492,306 units, a 3-storey commercial podium, basement Aug-2013 Aug-2016
Commercial 6/9/13 Ltd and GS Engineering
(Khazanah Nasional & carparks with underground pedestrian/shopping
& Construction
Temasek Holdings JV) mall at Straits View/Marina Way (Marina One)
Corp.

Ophir-Rochor Residential
Pte Ltd, Ophir-Rochor Erection of 1 block of 49-storey residential tower
Hotel Pte Ltd & comprising 660 units and 1 block of 39-storey
Residential & BT & ST DP Architects Pte Obayashi
Ophir-Rochor Commercial - - 166,000 office & hotel tower with a retail gallery at Aug-2013 Dec-2016
Commercial 6/9/13 Ltd Corporation
Pte Ltd (Khazanah Rochor Road/Beach Road/Ophir Road
Nasional & Temasek (Duo Residences/Duo Tower/Duo Galleria)
Holdings JV)

Erection of 2 blocks of 12-storey teaching


buildings, a block of 7-storey administration
261 (including building & a 3-storey common zone building
Overseas Family School MKPL Architects Woh Hup (Private)
investment - 105,991 Institutional comprising a performing arts centre & Oct-2013 Apr-2015 BT 11/9/13
Limited Pte Ltd Limited
cost) auditorium, a swimming pool and other facilities
at Pasir Ris Drive 3/Elias Road (Overseas Family
School)

Erection of a 27-storey commercial building


Far East SOHO Pte Ltd
comprising 314 hotel units, 100 office units & WOHA Architects Woh Hup (Private)
(Subsidiary of Far East - - 19,416 Commercial Sep-2012 Mar-2015 BT 12/9/13
other ancillary facilities at Peck Seah Street Pte Ltd Limited
Organization)
(Oasia Downtown/PS100)

Main Contract - Erection of a block of 31-storey


Far East Opus Pte Ltd (Far office tower with an 8-storey podium of medical
DP Architects Pte Woh Hup (Private)
East Organization & Far - - 34,839 Commercial centre cum F&B/retail space and 2 basement Aug-2013 Mar-2016 BT 12/9/13
Ltd Limited
East Orchard Limited JV) carparks at Robinson Road/Cecil Street
(SBF Center)

Page 21
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Champsworth
Erection of 9 blocks of 5-storey condominium Asiabuild
Development Pte Ltd JGP Architecture (S)
- - 15,435 Residential comprising 148 units at Pasir Panjang Road Aug-2013 Jan-2016 ST 14/9/13 Construction Pte
(Subsidiary of SDB Asia Pte Pte Ltd
(Village @ Pasir Panjang) Ltd
Ltd)

Piling & diaphragm walls for a 28-storey


Superluck Properties Pte
commercial building with a lowrise retail BT 31/7/13 & Architects 61 Pte L&M Foundation
Ltd (Subsidiary of Tuan about $20 m - 23,907 Commercial Oct-2013 Oct-2014
podium, 2 sky terraces & 6 basement carparks at 14/9/13 Ltd Specialist Pte Ltd
Sing Holdings)
Robinson Road/Market Street (Robinson Towers)

Building & contingency works at Jurong West Chip Eng Seng


Housing & Development ADDP Architects
103.8 - - Residential Neighbourhood 6 Contract 31 comprising 700 Oct-2013 May-2016 BT 17/9/13 Contractors (1988)
Board LLP
units Pte Ltd

Phases 14 & 15 - Erection of 2 blocks of 4-storey


buildings comprising 24 units of shops on the 1st
Singapore Piling &
Kallang Development Pte Residential & storey & 52 units of residential apartments on the ADDP Architects
- - 7,784 Sep-2013 Sep-2015 BT 19/9/13 Civil Engineering
Ltd Commercial 2nd to 4th storey with 2 basement carparks at LLP
Pte Ltd
Jalan Ulu Seletar/Sembawang Road
(The Springside)

Design, supply, installation, testing & Surbana


Changi Airport Group Guthrie Engineering
- - - Building Others commissioning of the category 1 approach Apr-2013 Apr-2014 BT 13/8/13 International
(Singapore) Pte Ltd (S) Pte Ltd
lighting system at Seletar Airport Consultants Pte Ltd

Page 22
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Changi Airport Group Civil Lengthening of the exising taxiway by more than
- - - - early 2015 BT 13/8/13 - -
(Singapore) Pte Ltd Engineering double at Seletar Airport

Renaissance Properties Pte Additions & alterations to the existing Telok Ayer DP Architects Pte LPS Constuction Pte
4 - 4,762 Commercial Sep-2013 Nov-2013 ST 1/9/13
Ltd Market (Lau Pa Sat) at 18 Raffles Quay Ltd Ltd

Construction of a 3-storey Family Entertainment


ST 6/6/12 &
Sentosa Development Centre for an indoor children theme park with CPG Consultants
35.8 - 10,600 Recreational Mar-2013 Aug-2014 25/1/13; Debenho Pte Ltd
Corporation KidZania Singapore as the sole tenant at 23 Beach Pte Ltd
BT 6/9/13
View, Sentosa

Caritas Singapore Erection of a 4-storey social services building at


Laud Architects Pte
Community Council 15 - 4,200 Institutional Lorong 8 Toa Payoh - 2015 ST 6/9/13 -
Ltd
Limited (Agape Village)

North Gem Development


Pte Ltd & FC North Gem Erection of a 12-storey mixed development
BT 6/9/13 &
Trustee Pte Ltd (As Commercial & building comprising 900 residential units
- 41,085 - - - HDB tender - -
Trustee-Manager of North Residential integrated with the bus interchange & community
award 9/9/13
Gem Trust) [Part of Frasers club at Yishun Avenue 2/Yishun Central 1
Centrepoint]

Page 23
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

LVND Investments Pte Ltd Upgrading of the Hotel Windsor & commercial
(Nobel Design Holdings podium comprising retail units from basement 1
- - - Commercial 1Q 2014 2015 BT 6/9/13 - -
Ltd, Lian Huat Group & 2E to level 3 and hotel from levels 4 to 9
Capital Pte Ltd JV) at 401 MacPherson Road (MacPherson Mall)

Laguna Hotel Holdings Pte more than Erection of a new golf resort hotel & upgrading of A.M. Associates
- - Commercial 4Q 2013 2015 ST 6/9/13 -
Ltd $100 m the existing clubhouse at Laguna Golf Green (Singapore) Pte Ltd

RSP Architects
Phase 6B - Erection of a 5-storey Design School at C K T Thomas Pte
Singapore Polytechnic 23.4 - 9,000 Institutional Jun-2012 Jan-2014 ST 8/9/13 Planners &
Dover Road Ltd
Engineers Pte Ltd

Phase 6C - Erection of a block of 4-storey


CPG Consultants Santarli-Zheng
Singapore Polytechnic 63.8 - 25,093 Institutional Aerohub building & 2 blocks of 7/8-storey Jan-2013 Jan-2015 ST 8/9/13
Pte Ltd Keng JV
Business Schools at Dover Road

Phase 7 - Additions & alterations and extension to Kwan Yong


DP Architects Pte
Ngee Ann Polytechnic 58.4 - 25,138 Institutional the existing Block 51 & erection of a new Block 58 Jun-2012 Apr-2014 ST 8/9/13 Construction Pte
Ltd
at Clementi Road Ltd

Page 24
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Phase 7B - Erection of a 4-storey building (Block


22) with student lounge, staff office, foodcourt, DP Architects Pte
Ngee Ann Polytechnic 34.9 - 12,372 Institutional Sep-2013 Mar-2015 ST 8/9/13 Conint Pte Ltd
indoor sports hall & tennis courts at Clementi Ltd
Road

Erection of a 7-storey teaching facilities building


Forum Architects Incorporated
Temasek Polytechnic 25 - 15,209 Institutional (South Wing - Phase 2) Feb-2013 Jun-2014 ST 8/9/13
Pte Ltd Builders Pte Ltd
at 21 Tampines Avenue 1

Erection of an 8-storey teaching facilities building Koon Seng


Forum Architects
Temasek Polytechnic 67.9 - 34,379 Institutional (East Wing) Apr-2013 Feb-2015 ST 8/9/13 Construction Pte
Pte Ltd
at 21 Tampines Avenue 1 Ltd

Erection of a 4-storey & a 7-storey academic


RSP Architects
blocks, a 2-storey & a 3-storey ancillary facility
Nanyang Polytechnic 137.6 - 46,241 Institutional Dec-2012 Jun-2014 ST 8/9/13 Planners & Gammon Pte Ltd
blocks and upgrading to the existing Block A at
Engineers Pte Ltd
180 Ang Mo Kio Avenue 8

National Environment Construction of the 5th waste-to-energy


- - - Industrial - 2018 ST 11/9/13 - -
Agency incineration plant in Singapore

Page 25
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Civil Construction of Singapore's 1st underground


Public Utilities Board - - - early 2017 - ST 11/9/13 - -
Engineering reservoir at Bidadari estate

Civil Construction of the Cross Island Line ST 22/8/13 &


Land Transport Authority - - - - 2030 - -
Engineering (from Jurong to Changi) 12/9/13

Upgrading of the Butterfly Park & Insect


Sentosa Leisure Group 6 - - Recreational - 2015 ST 11/7/13 - -
Kingdom at Sentosa

Erection of 4 new buildings & addition of 2 more


Sentosa Leisure Group 5 - - Recreational - 2015 ST 11/7/13 - -
tracks for the Skyline Luge Sentosa

Evonik Methionine SEA Expansion of the oil-additives plant at Jurong BT 16/8/13 &
- - - Industrial - early 2015 - -
Pte Ltd Island 22/8/13

Page 26
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Evonik Methionine SEA Construction of an automotive plastics plant at BT 16/8/13 &


427 - - Industrial - 2014 - -
Pte Ltd Jurong Island 22/8/13

Civil Construction of Woodlands South Station for Woh Hup (Private)


Land Transport Authority 143.8 - - Aug-2013 Sep-2019 ST 24/8/13 -
Engineering Thomson Line Limited

Oxley Global Pte Ltd Erection of a 5-storey apartment building


ST 5/6/12 & Ronny Chin
(Subsidiary of Oxley - - 3,052 Residential comprising 60 units at Upper Serangoon Road Oct-2012 Apr-2014 BSI (1990) Pte Ltd
BT 30/8/13 Architects Pte Ltd
Holdings (Vibes@Upper Serangoon)

Oxley Global Pte Ltd Erection of a 5-storey apartment building


Ronny Chin
(Subsidiary of Oxley - - 1,821 Residential comprising 36 units at Upper Serangoon Road Oct-2012 Apr-2014 BT 30/8/13 BSI (1990) Pte Ltd
Architects Pte Ltd
Holdings (Presto@Upper Serangoon)

a) Construction of covered linkways for 59 MRT


stations in the north-eastern & north-western BT & ST
2018 (final
Land Transport Authority - - - Building Others sectors - 25/1/13; - -
completion)
b) Construction of covered walkways for the ST 30/8/13
remaining MRT & LRT stations

Page 27
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Housing & Development Bidadari Estate


Board and Private - - - Residential Development of 10,000 HDB units & 1,000 private - - ST 30/8/13 - -
Developers units, a man-made lake and a regional park

Punggol Matilda
Housing & Development
- - - Residential Development of 8,000 HDB units integrated with - - ST 30/8/13 - -
Board
an elevated landscaped deck

Tampines North
Housing & Development
Development of 17,000 HDB units & 4,000 private
Board and Private - - - Residential - - ST 30/8/13 - -
units, 2 new parks and
Developers
a shopping mall-cum-bus interchange

Trident Realty Pte Ltd Erection of a block of 8-storey multi-user light


Kyoob Architects
(Fission Group & Pinnacle - - - Industrial industrial building with ancillary offices - - ST 31/8/13 -
Pte Ltd
Assets Group JV) at 22 New Industrial Road (Primax)

Majlis Ugama Islam Construction of the Al-Islah Mosque at Punggol ST 1/6/13 & Formwerkz GTMS Construction
15.6 - 3,767 Insitutional Aug-2013 Feb-2015
Singapura (MUIS) Field/Punggol Place 1/9/13 Architects Pte Ltd

Page 28
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Construction of an industrial facility at Tuas


Tat Hong Holdings Ltd - 16,100 - Industrial - - BT 5/9/13 - -
South Street 10

Reconstruction of El Centro into an 18-storey


building comprising 56 residential units & 13
Heeton Holdings Limited - - - Residential - - BT 5/9/13 - -
commercial units at Kee Seng Street
(Onze @ Tanjong Pagar)

70 Shenton Pte Ltd


Erection of a 32-storey mixed development
(Roxy-Pacific Holdings,
Commercial & building comprising 23 shops, 98 office units & BT 4/4/12 & Ronny Chin CCM Industrial Pte
Macly Group, Pinnacle - - 20,360 Aug-2012 Nov-2015
Residential 132 residential units at 70 Shenton Way ST 4/5/13 Architects Pte Ltd Ltd
Assets, Fission Group & Mr
(EON Shenton)
Chee Hsian Sing JV)

Erection of a block of 6-storey apartment building Rich-Link


JGP Architecture (S)
RL Central Pte Ltd - - 2,516 Residential comprising 42 units at Mackenzie Road Nov-2012 Oct-2014 ST 4/5/13 Construction Pte
Pte Ltd
(The MKZ) Ltd

Clementi Development Pte Main Contract - Erection of 2 blocks of 36-storey Da-Cin


BT 16/4/13 & Axis Architects
Ltd (Subsidiary of IOI - - 68,369 Residential & 1 block of 33-storey condominium comprising Jul-2013 Jul-2016 Construction Co Ltd
15/5/13 Planners Pte Ltd
Group of Malaysia) 755 units at Jalan Lempeng (The Trilinq) (Singapore Branch)

Page 29
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Design & Build of a community club including a


People's Association - - 10,140 Recreational 1Q 2014 1Q 2015 ST 5/7/13 - -
hawker centre at Hougang Avenue 9

Piling works for 6 blocks of 13-storey Halls of


Nanyang Technological Residential BT & ST P & T Consultants
6.5 - 55,057 Residence at Nanyang Avenue/Nanyang Jun-2013 Oct-2013 KH Foges Pte Ltd
University Others 1/8/13 Pte Ltd
Crescent

Civil Construction of the Cross Island Line


Land Transport Authority - - - - 2030 ST 22/8/13 - -
Engineering (from Jurong to Tampines)

Piling works for 2 inpatient tower blocks & 1


CIAP Architects Pte
MOH Holdings Pte Ltd 22.4 - 52,473 Institutional geriatric research centre tower with 2 basements Aug-2013 Apr-2014 ST 24/8/13 KH Foges Pte Ltd
Ltd
at Yishun Central (Yishun Community Hospital)

Kensington Village Pte Ltd Erection of a 5-storey building with attic


Residential &
(Fragrance Group & World - - - comprising 57 shops & 141 residential units at - - ST 29/8/13 HUAY Architects -
Commercial
Class Land JV) Jalan Lokam (Kensington Square)

Page 30
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 3 blocks of 5-storey apartment


Global Star Development buildings comprising 130 units at Braddell Road Penta-Ocean
Park + Associates
Pte Ltd (Subsidiary of Top - - 14,356 Residential (E Maison) & 1 block of 5-storey apartment Sep-2013 Oct-2015 ST 29/8/13 Construction
Pte Ltd
Global Limited) building comprising 45 units at Sommerville Company Limited
Walk (R Maison)

Design & Build of a block of 6-storey ramp-up


SH Cogent Logistics Pte AC Consortium Pte SH Design & Build
152 - 151,697 Industrial warehouse building with rooftop container depot Aug-2012 Jun-2014 ST 29/8/13
Ltd Ltd Pte Ltd
& ancillary facilities at Tanjong Kling Road

Civil Widening of Clementi Road between Ayer Rajah


Land Transport Authority - - - 1Q 2014 1Q 2017 ST 29/8/13 - -
Engineering Expressway (AYE) & Bukit Timah Road

Civil Expansion of Bishan Depot with 3 more


Land Transport Authority - - - - 2015 BT 15/5/13 - -
Engineering maintenance tracks

Civil
Land Transport Authority - - - Construction of a new Tuas Depot - 2016 BT 15/5/13 - -
Engineering

Page 31
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Aurum Land (Private) Erection of 3 blocks of 5-storey condominium


ST 24/6/13 & Park + Associates
Limited [Subsidiary of - - 4,859 Residential comprising 65 units at 311 Upper Thomson Road 1Q 2014 4Q 2016 -
20/7/13 Pte Ltd
Woh Hup Holdings] (Three 11)

Civil Construction of new road between MacRitchie


Land Transport Authority 134.7 - - Aug-2013 Oct-2017 ST 6/8/13 - Swee Hong Limited
Engineering Viaduct & Adam Flyover

FC Commercial Trustee Pte


Ltd (as Trustee-Manager of BT 16/8/13 &
Commercial development at Cecil Street/Telok
Aquamarine Star Trust) - 7,603 - Commercial - - URA tender - -
Ayer Street
[Part of Frasers result 19/8/13
Centrepoint]

Erection of a block of 5-storey apartment building Perpetual


Vicland Realty Co Pte Ltd - - 2,624 Residential Feb-2013 May-2014 BT 16/8/13 HUAY Architects
comprising 33 units at Haig Road (The Serenno) Contractors Pte Ltd

Erection of a block of 6-storey apartment building


Ivy Lee Realty Pte Ltd - - - Residential comprising 30 units at Devonshire Road/Killiney - - BT 16/8/13 - -
Road (Devonshire 8)

Page 32
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Setting up of an integrated maintenance &


PEC Ltd - - - Industrial fabrication site with dormitory facilities at 20 - - BT 22/8/13 - -
Benoi Lane

ST 14/3/13,
Changi Airport Group Civil Construction of the third runway at Changi
- - - 2014 2020 18/3/13 & - -
(Singapore) Pte Ltd Engineering Airport
15/7/13

a) Construction of 40km of taxiways to link the


new runway to the airport
Changi Airport Group Civil
- - - b) Construction of a bigger fire station - - ST 15/7/13 - -
(Singapore) Pte Ltd Engineering
c) Construction of more than 50 aircraft parking
bays in the next 5 to 7 years

Construction of a mixed-use complex linking BT/ST A team of


Changi Airport Group
- - - Commercial Terminals 1, 2 & 3 at the open-air carpark infront - 2018 19/8/13 & consultants led by -
(Singapore) Pte Ltd
of Terminal 1 (Project Jewel) 20/8/13 Moshe Safdie

BT/ST
Changi Airport Group
- - - Building Others Construction of the Changi Airport's Terminal 5 - mid-2020s 19/8/13 & - -
(Singapore) Pte Ltd
20/8/13

Page 33
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT/ST
Changi Airport Group Civil
- - - Construction of the fourth runway at Changi East - - 19/8/13 & - -
(Singapore) Pte Ltd Engineering
20/8/13

BT/ST
Construction of a new Republic of Singapore Air
Ministry of Defence - - - Institutional - - 19/8/13 & - -
Force (RSAF) Airbase at Changi East
20/8/13

Residential, Development of new homes, offices & factories at BT/ST


Various Developers - - - Commercial & Paya Lebar after the Paya Lebar Airbase has - - 19/8/13 & - -
Industrial moved to Changi 20/8/13

BT/ST
Civil
PSA Corporation Limited - - - Construction of a new port at Tuas - - 19/8/13 & - -
Engineering
20/8/13

Development of 1,000 hectares of Southern BT/ST


Various Developers - - - - Waterfront City after container ports have moved - - 19/8/13 & - -
to Tuas 20/8/13

Page 34
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Development of a seafront public housing estate


Housing & Development fully connected to an LRT station in the new
- - - Residential - - ST 27/6/13 - -
Board Northshore District at Punggol over the next five
years

Reconstruction of Robinson Towers with its


Superluck Properties Pte Architects 61/Kohn
annex building & International Factors Building BT 1/12/12 &
Ltd (Subsidiary of Tuan - - 23,907 Commercial 3Q 2013 2Q 2016 Pedersen Fox -
into an office tower & a retail podium at 31/7/13
Sing Holdings) Associates
Robinson Road/Market Street

Clerodendrum Land Pte Piling works for 3 blocks of 19-storey & 1 block of
BT 1/11/12 & MKPL Architects CS Bored Pile
Ltd (Subsidiary of Tuan - - 33,354 Residential 5-storey condominium comprising 332 units at Mar-2013 Jan-2014
ST 31/7/13 Pte Ltd System Pte Ltd
Sing Holdings) Pheng Geck Avenue (Sennett Residence)

Shelford Properties Pte Ltd Piling works for 1 block of 4-storey condominium
BT 1/11/12 & SCDA Architects CS Bored Pile
(Subsidiary of Tuan Sing - - 6,997 Residential comprising 52 units at Cluny Park Road Mar-2013 Sep-2013
ST 31/7/13 Pte Ltd System Pte Ltd
Holdings) (Cluny Park Residence)

Asplenium Land Erection of 3 blocks of 5-storey condominium


SCDA Architects CKR Contract
(Subsidiary of Tuan Sing - - 26,862 Residential comprising 276 units at Seletar Road Jan-2013 Jan-2015 ST 31/7/13
Pte Ltd Services Pte Ltd
Holdings) (Seletar Park Residence)

Page 35
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 2 blocks of 12-storey condominium Daiya Engineering


ADDP Architects
MCL Land (Prime) Pte Ltd - - 9,450 Residential comprising 75 units at Ewe Boon Road Jan-2012 Jun-2014 BT 2/8/13 & Construction Pte
LLP
(Hallmark Residences) Ltd

Hong Kiat
MCL Land (Serangoon) Pte Erection of 32 units of 3-storey semi-detached P & T Consultants
- - 10,152 Residential Oct-2011 Apr-2014 BT 2/8/13 Construction Pte
Ltd houses at Sixth Avenue (Palms @ Sixth Avenue) Pte Ltd
Ltd

An integrated development comprising


commercial shops, a hawker centre, a childcare
Housing & Development Residential, centre, 2 Studio Apartment blocks with a Senior
ST 4/8/13 & WOHA Architects
Board and Ministry of - - - Institutional & Activity Centre, a medical centre, a Senior Care 2014 2017 -
5/8/13 Pte Ltd
Health Commercial Centre, a Town Plaza on the ground floor for
community events & other facilities at
Woodlands

Erection of 4 blocks of 18-storey residential


Crescent View BT & URA
buildings & 1 block of low-rise residential
Developments Pte Ltd tender result
- - 28,702 Residential building comprising 266 units with 28 4Q 2013 4Q 2016 Aedas Pte Ltd -
(City Developments & 7/9/12;
commercial units at 1st storey & 3 basement
Hong Leong Holdings JV) BT 7/8/13
carpark at Tai Thong Crescent

Pinehill Investments Pte BT & URA


Ltd [Subsidiary of Residential development at Ang Mo Kio Avenue tender result MKPL Architects
- - 64,688 Residential 1Q 2014 2Q 2017 -
Wheelock Properties 2 9/1/13; Pte Ltd
(Singapore) Ltd] ST 7/8/13

Page 36
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Bukit Timah Green


Development Pte Ltd BT 19/9/12,
Design & Build of 6 blocks of 15-storey Tiong Aik
(Hock Lian Seng Holdings, 27/9/12 & P & T Consultants
116.7 - 40,532 Residential condominium comprising 420 units at Dairy Farm Apr-2013 Oct-2015 Construction Pte
TA Corporation, King Wan 5/12/12; Pte Ltd
Road (The Skywoods) Ltd
Corporation & Far East ST 12/8/13
Distillers JV)

Repair & redecoration works at East Coast


National Environment Line Concept Tay Hao Paint
2.3 - - Commercial Lagoon Food Village and Serangoon Garden Aug-2013 Nov-2013 ST 12/8/13
Agency Architects Works Pte Ltd
Market

City Sunshine Holdings Pte


Erection of 2 blocks of 36-storey condominium ADDP Architects
Ltd (Subsidiary of City - - 25,371 Residential 2013 end 2015 BT 14/8/13 -
comprising 124 units at Leonie Hill Road LLP
Developments)

RBC Investor Services


Trust Singapore Limited Design & Build of a 4-storey single-user ramp-up Ace Architects & Time Builders Pte
- - 66,572 Industrial Jul-2013 Oct-2014 ST 25/7/13
(As trustee of Cambridge warehouse building at 3 Pioneer Sector 3 Associates Ltd
Industrial Trust)

RBC Investor Services


Trust Singapore Limited Upgrading of an industrial building A + Projects
- - - Industrial 4Q 2013 - ST 25/7/13 -
(As trustee of Cambridge at 21B Senoko Loop Consultants
Industrial Trust)

Page 37
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Upgrading of the Bukit Timah Saddle Club


Bukit Timah Saddle Club - - - Recreational - end 2013 ST 29/7/13 - -
at 51 Fairways Drive

Evia Real Estate (5) Pte Ltd,


BT 31/7/13 &
BBR Development Pte Ltd, Executive Condominium development at Yuan
- 20,188 - Residential - - HDB tender - -
CNH Investment Pte Ltd & Ching Road/Tao Ching Road
award 2/8/13
OKP Land Pte Ltd

Peak Square Pte Ltd


BT 31/7/13 &
[Subsidiary of Kheng Executive Condominium development at
- 24,065 - Residential - - HDB tender - -
Leong Company (Private) Punggol Drive/Edgedale Plains
award 2/8/13
Limited]

Master Contract Services BT 31/7/13 &


Executive Condominium development at
Pte Ltd & Keong Hong - 13,565 - Residential - - HDB tender - -
Punggol Central/Edgedale Plains
Construction Pte Ltd award 2/8/13

Sembcorp Cogen Pte Ltd


Build, own & operate of an energy-from-waste BT 21/5/13;
(Subsidiary of Sembcorp over $250 m - - Industrial - early 2016 - -
plant at Sakra Sector/Jurong Island BT&ST 2/8/13
Industries Ltd)

Page 38
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

National Environment Civil Development & construction of Phase 2 of the Between Jan to Mar BT 13/3/13 & Jurong Consultants
- - - early 2015 -
Agency Engineering Pulau Semakau landfill 2014 ST 2/8/13 Pte Ltd

Corporate Residence Pte


Erection of a block of 17-storey apartment Ang Cheng Guan
Ltd (SingHaiyi Group Ltd BT 25/4/13 &
- - 3,257 Residential building comprising 56 units at 235 Balestier Jul-2013 Jun-2015 Design Metabolists Construction Pte
& Hong Kong listed Xpress ST 3/8/13
Road (Cosmoloft) Ltd
Group Limited JV)

Hao Yuan Development


Erection of 12 blocks of 9 to 12-storey of Executive
Pte Ltd (Hao Yuan ST 20/7/13 & AGA Architects Pte
- - 58,086 Residential Condominium comprising 495 units - - -
Investment Pte Ltd & 3/8/13 Ltd
at Pasir Ris Drive 3/Pasir Ris Rise (Sea Horizon)
Sustained Land Pte Ltd JV)

Asiawide Resources Pte Erection of 6 blocks of 7-storey condominium Lee Kim Tah-Woh
ST 8/3/12 &
Ltd (Subsidiary of Allgreen - - 18,843 Residential comprising 248 units at River Valley Road Jun-2011 Jan-2014 Ong & Ong Pte Ltd Hup JV - RV
BT 6/8/13
Properties) (RV Residences) Residences

Westbuild Construction Pte Erection of a block of 9-storey multiple-user light Westbuild


BT 16/5/13 & AC Consortium Pte
Ltd (Subsidiary of Hiap - - 11,174 Industrial industrial building at 56 Kallang Pudding Road May-2013 Dec-2016 Construction Pte
6/8/13 Ltd
Hoe Limited) (HH@Kallang) Ltd

Page 39
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Supply, laying & diversion of 100mm to 1600m


Civil
Public Utilities Board 6.5 - - diameter ductile iron and/or steel watermains Jul-2013 Jul-2015 BT 6/8/13 - Teacly (S) Pte Ltd
Engineering
from 2013 to 2015

Link (THM) Greenleaf Pte Erection of a block of 5-storey apartment building


ST 12/1/13 & Crystal Jade
Ltd [Subsidiary of Link - - 4,038 Residential comprising 52 units at Pasir Panjang Road Jun-2013 Dec-2014 Universal Akitek
2/4/13 Engineering Pte Ltd
(THM) Holding Pte Ltd] (SeaSuites)

Construction of a lube oil blending plant & grease


Shell Eastern Petroleum Pte BT & ST CKM Consultants
- - 35,833 Industrial manufacturing plant in Tuas Lube Park at Tuas Jun-2013 Apr-2015 Punj Lloyd Pte Ltd
Ltd 17/4/13 Pte Ltd
South Avenue 5/Tuas South Boulevard

Erection of a block of 5-storey mixed


Residential & development building comprising 48 residential JGP Architecture (S) Spazio Construction
Spazio Land Pte Ltd - - 5,724 Aug-2013 May-2016 BT 16/5/13
Commercial units & 34 retail units at Upper Serangoon Road Pte Ltd Pte Ltd
(Spazio @ Kovan)

Oxley Viva Pte Ltd (Oxley


Holdings, Heeton Erection of a part 5/part 12-storey mixed
Holdings, KSH Holdings, Residential & development building comprising 136 residential DP Architects Pte
- - 25,148 - - ST 21/5/13 -
Lian Beng Group, TEE Commercial units & 141 commercial units at West Coast Way Ltd
International & Zap Piling (NeWest)
JV)

Page 40
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Fairview Developments Pte Erection of 18 units of semi-detached houses &


P & T Consultants
Ltd (Subsidiary of Tong - - 20,591 Residential 100 units of terrace houses at Ang Mo Kio 1Q 2014 1Q 2017 ST 21/5/13 -
Pte Ltd
Eng Brothers) Avenue 5 (Belgravia Villas)

Urban Lofts Pte Ltd (ACT Erection of 2 blocks of 5-storey apartment


A_Collective
Holdings, Nobel Design & - - - Residential buildings comprising 53 units at Lim Tua Tow - - ST 11/6/13 -
Architects
Pinnacle Assets JV) Road (Cambio Suites)

Aurum Land Private Erection of 3 blocks of 3-storey condominium


Park + Associates
Limited (Subsidiary of - - 4,859 Residential comprising 65 units at 311 Upper Thomson Road 1Q 2014 4Q 2016 ST 24/6/13 -
Pte Ltd
Woh Hup Holdings) (Three 11)

Rotary Electrical &


Evonik Methionine SEA Procurement & construction of electrical &
30 - - Industrial May-2013 Mar-2014 BT 10/7/13 - Instrumentation Pte
Pte Ltd instrumentation facilities at Jurong Island
Ltd

Rotary Mechanical
Shell Eastern Petroleum Pte Piping, steel structure, fabrication & insulation Chiyoda Singapore
17 - - Industrial Jun-2013 May-2014 BT 10/7/13 & Construction Co
Ltd works at Jurong Island Pte Ltd
Pte Ltd

Page 41
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

RH Rochor Pte Ltd


Residential development at Wilkie Terrace Ronny Chin
(Subsidiary of Roxy-Pacific - - 2,577 Industrial 4Q 2013 - ST 13/7/13 -
(Liv on Wilkie) Architects Pte Ltd
Holdings)

Publique Realty (Pasir Ris)


Erection of 8 blocks of 17-storey condominium
Pte Ltd [Capital BT 11/7/13 &
- - - Residential comprising 463 units at Pasir Ris Drive 3 - - SM Architects LLP -
Development & ZACD 15/7/13
(Vue 8 Residence)
Investments JV]

Incorporated Woodlands BT 24/7/13 &


Pte Ltd (Subsidiary of Industrial development at Woodlands Industrial URA tender
- 16,776 - Industrial - - - -
Incorporated Builders Park E9 award
Group) 29/7/13

Allamanda Residential
Development Pte Ltd Erection of 2 blocks of 37-storey condominium BT 30/11/12 DCA Architects Pte Dragages Singapore
- - 55,016 Residential Oct-2013 Dec-2016
(CapitaLand & Mitsubishi comprising 694 units at Bishan Street 15 & 26/7/13 Ltd Pte Ltd
Estate Asia JV)

Redevelopment of the former Marine Point into 2


Ladyhill (Private) Limited blocks of 16/17-storey condominium comprising ST 28/1/11 & MKPL Architects
- - 10,985 Residential 4Q 2013 1Q 2017 -
[Subsidiary of CapitaLand] 120 units & 4 units of 2-storey terrace houses BT 26/7/13 Pte Ltd
at 95 Marine Parade Road

Page 42
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

ST 2/3/13;
Additions & Alterations to the existing Samson Tan EDZ Interior
Select Group Limited 4 - - Commercial Jul-2013 Oct-2013 2/5/13 &
Chinatown Food Street at Smith Street Associates Contracts Pte Ltd
29/7/13

A subsidiary of Novelty Industrial redevelopment of Henley Industrial


- - - Industrial - - BT 30/7/13 - -
Group Building at 22A Lim Teck Boo Road

Construction of a new 6-storey hospice building ST 17/10/12 New Space


Assisi Hospice - - 11,584 Institutional 1Q 2014 2016 -
in front of the existing building at Thomson Road & 30/7/13 Architects Pte Ltd

Erection of a 5-storey factory (prefabrication hub)


with a 6-storey ancillary office & a 6-storey BT & ST SEF Construction
SEF Group Ltd over $100 m - 32,553 Industrial Jun-2013 Aug-2014 Atria Architects
workers' dormitory at Kaki Bukit Road 4 30/7/13 Pte Ltd
(SEF SpaceHub)

Erection of 3,861 Build-To-Order (BTO) flats at


Housing & Development Yishun (Angsana Breeze @ Yishun & Vine Grove
- - - Residential - - BT 31/7/13 - -
Board @ Yishun), Sengkang (Fernvale Riverwalk) &
Bukit Merah (Telok Blangah ParcView)

Page 43
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Civil Construction of Caldecott MRT Station & DP Architects Pte Samsung C&T
Land Transport Authority 284.8 - - Jul-2013 Dec-2020 BT 26/7/13
Engineering associated tunnels for Thomson Line Ltd Corporation

Construction of tunnels between Woodlands


Civil Station & Woodlands Avenue 12 including Shanghai Tunnel
Land Transport Authority 421.6 - - Jul-2013 Sep-2019 BT 26/7/13 Aedas Pte Ltd
Engineering crossover tunnels and reception tunnels to Engineering Co Ltd
Mandai depot for Thomson Line

Ley Choon
Civil Planned maintenance of roads, road related
Land Transport Authority 24.9 - - Jul-2013 Jul-2015 BT 1/8/13 - Constructions and
Engineering facilities & road structures in Central Sector
Engineering Pte Ltd

Ley Choon
Civil Planned maintenance of expressways, road
Land Transport Authority 39 - - Jul-2013 Jul-2015 BT 1/8/13 - Constructions and
Engineering related facilities & road structures
Engineering Pte Ltd

Erection of the Tampines Town Hub comprising a


mega community club, a HomeTeam clubhouse, a
sports centre, a hawker centre, Tampines Aug-2013 (Piling); end 2013 (Piling);
ST 5/12/12 & DP Architects Pte
People's Association - - 121,600 Recreational Regional Library, clinics, childcare centres, end 2013 (Main 2016 (Main -
12/5/13 Ltd
culinary and music studios, National Heritage Contract) Contract)
Board office & North East Community
Development Council at 25 Tampines Street 82

Page 44
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Winsmart Investment Pte Erection of 5 blocks of 18-storey condominium Arc Studio


Shimizu
Ltd (Subsidiary of Wing - - 30,375 Residential comprising 337 units at 105 & 107 Tampines Road Oct-2013 Aug-2016 BT 14/5/13 Architecture +
Corporation
Tai Holdings) (The Tembusu) Urbanisim

Surindipity Pte Ltd (ACT


Holdings Pte Ltd, Foreland Erection of 27 units of 3-storey terrace houses at
- - - Residential - - BT 24/5/13 - -
Development Pte Ltd & 9th Charlton Road/Surin Avenue (Charlton 27)
Realty Pte Ltd JV)

Wingcrown Investment Pte


Erection of 4 blocks of 5-storey & 3 blocks of Greatearth
Ltd P & T Consultants
- - 54,944 Residential 24-storey condominium comprising 469 units at Jun-2013 Nov-2015 ST 30/5/13 Construction Pte
(Wing Tai Holdings, Metro Pte Ltd
Prince Charles Crescent Ltd
Holdings & UE E&C JV)

White Haven Properties Erection of 6 blocks of 15/16/17-storey


DCA Architects Pte Dragages Singapore
Pte Ltd (Subsidiary of City - - 60,000 Residential condominium comprising 616 units at Buangkok Jul-2013 Apr-2016 BT 4/6/13
Ltd Pte Ltd
Developments) Drive/Sengkang Central (Jewel @ Buangkok)

Singapore
Civil Implementation of a communication system for
Land Transport Authority 12.7 - - May-2013 Dec-2016 BT 6/7/13 - Technologies
Engineering Sengkang & Punggol Light Rapid Transit system
Electronics Limited

Page 45
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Addition & Alterations works on communication, Singapore


Civil
Land Transport Authority 1.4 - - control & station travel information systems for May-2013 Dec-2016 BT 6/7/13 - Technologies
Engineering
the Circle Line's MacPherson Station Electronics Limited

Erection of the 5-storey Wisma Geylang Serai


comprising a community club, Malay Heritage
Design-
Gallery, South East Community Development
People's Association - - 12,750 Recreational 2Q 2014 2017 ST 14/7/13 Environment Group -
Council office & other arts and community
Architects LLP
facilities at Geylang Serai Road/Engku Aman
Road

Crescent View
Developments Pte Ltd Residential development with the 1st storey as BT 7/9/12 &
- - 28,702 Residential 4Q 2013 4Q 2016 Aedas Pte Ltd -
(City Developments & commercial space at Tai Thong Crescent 16/7/13
Hong Leong Holdings JV)

United Venture Design & Build of 3 blocks of 21-storey


Unison
Development (Thomson) condominium comprising 435 units & 10 units of P & T Consultants
- - 41,386 Residential Jan-2013 Aug-2015 BT 16/7/13 Construction Pte
Pte Ltd [UOL Group & 3-storey semi-detached houses at 18 Bright Hill Pte Ltd
Ltd
Singapore Land JV] Drive (Thomson Three)

Erection of 3 blocks of 25-storey & 1 block of


Verspring Properties Pte
20-storey Executive Condominium comprising ADDP Architects
Ltd (Subsidiary of City - - 41,245 Residential 4Q 2013 4Q 2016 BT 17/7/13 -
380 units at Sengkang West Way/Fernvale Link LLP
Developments)
(Lush Acres)

Page 46
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Bartley Homes Pte Ltd Erection of 4 blocks of 5-storey apartment


Park + Associates
(Subsidiary of Top Global - - 9,917 Residential buildings comprising 139 units at Bartley Road 3Q 2013 2Q 2016 BT 17/7/13 -
Pte Ltd
Limited) (The Quinn)

BT 17/7/13 &
MCC Land (Singapore) Pte URA tender
- 17,103 - Residential Residential development at Tampines Avenue 10 - - - -
Ltd award
19/7/13

Erection of 9 blocks of 15-storey Executive


Oasis Development Pte Ltd Keong Hong
Condominium comprising 506 units at BT 29/1/13 & Design Link
(Keong Hong Holdings Ltd 149.9 21,718 60,812 Residential Jun-2013 Oct-2016 Construction Pte
Sembawang Crescent/Sembawang Drive ST 20/7/13 Architects
& JBE Holdings Pte Ltd JV) Ltd
(SkyPark Residences)

Erection of 12 blocks of 9 to 12-storey of Executive


Hao Yuan Development AGA Architects Pte
- - 58,086 Residential Condominium comprising 494 units - - ST 20/7/13 -
Pte Ltd Ltd
at Pasir Ris Drive 3 (Sea Horizon)

HSBC Institutional Trust Phase 1 - Reconfiguration of anchor tenancy unit Surbana


Gennal Industries
Services (Singapore) Ltd as - - - Commercial (BHG) at the existing Bugis Junction at 230 May-2013 Apr-2014 ST 20/7/13 International
Pte Ltd
trustee of CapitaMall Trust Victoria Street Consultants Pte Ltd

Page 47
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Additions & Alterations to the existing


Yat Yuen Hong Company International Building involving extension of a
Limited (Subsidiary of single-storey commercial block and BT 16/5/13 &
- - - Commercial - 2018/2019 - -
Hong Fok Corporation redevelopment of the existing carpark block into 20/7/13
Limited) a new 27-storey hotel (Yotel Singapore) at 360
Orchard Road/Claymore Hill

BT & ST
Expansion of the existing Raffles Hospital at
Raffles Medical Group Ltd 80 to 100 - 9,394 Institutional end 2013 early 2016 24/7/12 ; - -
North Bridge Road
ST 23/7/13

RSP Architects
Orchard Landmark Pte Ltd
Erection of a block of 22-storey luxury Planners and
& Far East Lighthouse Pte BT & ST
- - - Residential condominium comprising 104 units - - Engineers Pte -
Ltd (Subsidiaries of Far 1/5/13
at 1 Leonie Hill (Ferra) Ltd/Paolo
East Organization)
Pininfarina of Italy

China Construction
Beauty World Properties Erection of a block of part 13/part 16-storey
DP Architects Pte (South Pacific)
Pte Ltd (Subsidiary of Far - - 6,078 Residential condominium comprising 76 units Aug-2011 Feb-2014 ST 25/5/13
Ltd Development Co
East Organization) at 25 Amber Road (The Cape)
Pte Ltd

Far East SOHO Pte Ltd


Erection of a block of 5-storey residential building
(Subsidiary of Far East - - 3,839 Residential 3Q 2013 1Q 2015 ST 12/6/13 - -
comprising 54 units at Farrer Road (The Siena)
Organization)

Page 48
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT 13/6/13 &
S.H. Stainless Steel Industrial development at Plot 1,
- 4,551 - Industrial - - JTC tender - -
Contractor Pte Ltd Tuas South Street 6
result 9/7/13

BT 13/6/13 &
Stallion Development Pte Industrial development at Plot 3,
- 3,036 - Industrial - - JTC tender - -
Ltd Tuas South Street 6
result 9/7/13

BT 13/6/13 &
Jin Choon Civil Industrial development at Plot 5,
- 3,036 - Industrial - - JTC tender - -
Engineering Pte Ltd Tuas South Street 6
result 9/7/13

Erection of a block of 6-storey ramp-up


Transurban Properties Pte
multiple-user general industrial building Jurong Consultants
Ltd (Subsidiary of Far East - - 46,560 Industrial 4Q 2013 4Q 2015 BT 28/6/13 -
comprising 72 factories & 72 warehouses at Tuas Pte Ltd
Organization)
South Avenue 6 (The Westcom)

Design & Build of a part 3/part 6-storey


HA Architects Pte Boustead Projects
Schenker Singapore Pte Ltd 70 - 54,737 Industrial warehouse with an ancillary office building at Jan-2013 Mar-2014 BT 6/7/13
Ltd Pte Ltd
Tampines Road

Page 49
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Design & Build of a part 6/part 9-storey


Seagate Singapore single-user business park building with ancillary
HA Architects Pte Boustead Projects
International Headquarters over $100 m - 40,848 Industrial facilities & 3 basement carparks at Ayer Rajah Jun-2013 Dec-2014 BT 6/7/13
Ltd Pte Ltd
Pte Ltd Avenue/Fusionopolis
(Seagate Singapore Design Center - The Shugart)

Design & Build of 1 block of hotel comprising 560


Tamerton Pte Ltd
rooms with landscape deck, a basement carpark, BT & ST Team Design Low Keng Huat
(Subsidiary of Genting - - 18,957 Commercial Jul-2013 Mar-2015
a swimming pool & other ancillary facilities at 12/7/13 Architects Pte Ltd (Singapore) Limited
Singapore PLC)
Jurong Town Hall Road

Hong Realty (Private)


Erection of 12 blocks of 11/12/13-storey Daewoo
Limited [Hong Realty, City ST 25/5/13 & Architects 61 Pte
- - 86,678 Residential condominium comprising 912 units Jul-2013 Jan-2017 Engineering &
Developments & Hong 13/7/13 Ltd
at Pasir Ris Grove (d'Nest) Construction Co Ltd
Leong Holdings JV]

Singapore Lube Park Pte


Construction of a shared lubricants park
Ltd [Shell Eastern
comprising an import & export jetty, common BT & ST
Petroleum, Sinopec - - - Industrial late 2013 2015 - -
pipelines, infrastructure and storage facilities 17/7/13
Lubricant (Singapore) &
at Tuas (Singapore Lube Park)
Total Oil Asia Pacific JV]

Sherwood Development Erection of 6 blocks of 10-storey & 3 blocks of


Pte Ltd (Keppel Land 11/12-storey condominium comprising 726 units BT 17/4/13 & P & T Consultants
- - 51,011 Residential 4Q 2013 3Q 2016 -
Limited & China Vanke Co at New Upper Changi Road/Bedok Road/Bedok 18/7/13 Pte Ltd
Ltd JV) Rise (The Glades)

Page 50
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Keppel Bay Pte Ltd Erection of 11 blocks of 5 to 10-storey BT & ST DCA Architects Pte
(Subsidiary of Keppel - - 47,380 Residential condominium comprising 366 units at Keppel Bay 2Q 2014 2Q 2017 18/5/13; Ltd /Studio Daniel -
Land) Drive (Corals at Keppel Bay) BT 18/7/13 Libeskind

Upgrading of Capital Tower at 168 Robinson


CapitaCommercial Trust 40 - - Commercial 4Q 2013 2Q 2015 BT 18/7/13 - -
Road

Additions & Alterations to the existing 8-storey


US$90m
Pacnet Services Global (S) single-user industrial building at 110 Paya Lebar M+W Singapore Pte
(including - 8,947 Industrial Feb-2013 Dec-2013 BT 13/3/13 AWP Pte Ltd
Pte Ltd Road Ltd
investment)
(Pacnet 5th Data Centre)

MCL Land (Gateway) Pte Erection of 2 blocks of 38/34-storey & 20-storey Keong Hong
BT 25/6/13 & AGA Architects Pte
Ltd [Subsidiary of MCL 161.9 - 53,537 Residential condominium comprising 738 units at Boon Lay Jun-2013 Sep-2016 Construction Pte
28/6/13 Ltd
Land] Way/Gateway Drive (J Gateway) Ltd

Eng Lam
Civil Improvement to Roadside Drains IV Contract 4-2 Meinhardt
Public Utilities Board 10.2 - - Apr-2013 Oct-2015 BT 2/7/13 Contractors Co Pte
Engineering (Joo Chiat Areas) (Singapore) Pte Ltd
Ltd

Page 51
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Eng Lam
Civil Improvement works to Stamford Canal
Public Utilities Board 6.7 - - Jul-2013 Oct-2014 BT 2/7/13 - Contractors Co Pte
Engineering (from Napier Road to Marina Reservoir)
Ltd

Oxley Vibes Pte Ltd Erection of a 3-storey building comprising 274


Commercial & BT 3/4/12 & Ronny Chin CKR Contract
(Subsidiary of Oxley - - 19,485 retail units & 164 residential units at Jalan Pelikat Aug-2012 Feb-2014
Residential ST 2/7/13 Architects Pte Ltd Services Pte Ltd
Holdings) (The Promenade@Pelikat)

Upgrading of existing Unity Primary at Choa


ST 11/1/12 & Suncity Contracts
Ministry of Education 22.9 - 45,776 Institutional Chu Kang & Rosyth School at 21 Serangoon Dec-2011 Nov-2014 SEP Partnership
4/7/13 Pte Ltd
North Avenue 4

Additions & Alterations to existing Canossa CPG Consultants BHCC Construction


Ministry of Education 18.9 - - Institutional Jan-2013 Nov-2014 ST 4/7/13
Convent Primary School at 1 Sallim Road Pte Ltd Pte Ltd

Additions & Alterations to existing


Newcon Builders
Ministry of Education 11.6 - - Institutional CHIJ Primary-Toa Payoh at 628 Lorong 1 Toa Nov-2012 Mar-2014 ST 4/7/13 Ong & Ong Pte Ltd
Pte Ltd
Payoh

Page 52
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Lian Soon
Additions & Alterations to existing Kuo Chuan
Ministry of Education 26.3 - 22,570 Institutional Jan-2013 Jul-2014 ST 4/7/13 LT & T Architects Construction Pte
Presbyterian Primary School at 8 Bishan Street 13
Ltd

Upgrading of Nanyang Primary School at 52 Guan Ho


Ministry of Education 36.9 - 17,892 Institutional King's Road including a kindergarten wing for Mar-2013 Dec-2014 ST 4/7/13 LT & T Architects Construction Co Pte
Nanyang Kindergarten at 51 Coronation Road Ltd

Upgrading of St Anthony's Primary School at 1


Kwan Yong
Bukit Batok Street 34 & construction of indoor Architects Project
Ministry of Education 19.9 - 23,517 Institutional Jun-2013 Dec-2014 ST 4/7/13 Construction Pte
sports halls for Swiss Cottage Secondary School at Group LLP
Ltd
3 Bukit Batok Street 34

Kuan Aik Hong


Upgrading of existing St Hilda's Primary School
Ministry of Education 13.3 - 6,374 Institutional Mar-2013 Sep-2014 ST 4/7/13 Architects Team 3 Construction Pte
at Tampines Avenue 3
Ltd

Addition of an ammonia storage tank, pipe rack P Teo Associates


Vopak Terminals IIW Singapore Pte
- - 6,800 Industrial & ancillaries to existing storage terminal at Jan-2013 Sep-2014 ST 6/7/13 Consulting
Singapore Pte Ltd Ltd
Banyan Avenue Engineers

Page 53
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Mequity (Hillview) Pte Ltd Erection of 3 blocks of 10-storey apartment Lim Wen Heng
ST 5/9/12 & JGP Architecture (S)
[Roxy-Pacific Holdings & - - 10,844 Residential buildings comprising 193 units at Hillview Oct-2012 Oct-2014 Construction Pte
BT 11/7/13 Pte Ltd
Macly Group JV] Terrace (Natura@Hillview) Ltd

RL West Pte Ltd Erection of 4 blocks of 5-storey apartment


(Subsidiary of Roxy-Pacific - - 8,411 Residential buildings comprising 120 units at Pasir Panjang 3Q 2013 3Q 2016 BT 11/7/13 Ong & Ong Pte Ltd -
Holdings) Road (Whitehaven)

ZACD Investments Pte Ltd BT 12/4/13 &


and Bohai Investments - 24,971 - Industrial Industrial development at Tuas Bay Close - - JTC tender - -
(Sengkang) Pte Ltd result 10/5/13

BT 11/5/13 &
OKH Global Ltd - 20,633 - Industrial Industrial development at Loyang Way - - JTC tender - -
result 7/6/13

Sing Holdings (Robin) Pte


Condominium development on an amalgamated BT 15/12/11 Design Link
Ltd (Subsidiary of Sing - - 11,543 Residential 3Q 2013 4Q 2015 -
site at Robin Drive/Robin Road & BT 9/5/13 Architects Pte Ltd
Holdings Limited)

Page 54
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Coral Edge Development Design & Build of 6 blocks of 17-storey Executive


ST 7/12/12 & Design Link Greatearth
Pte Ltd (Sing Holdings Ltd - - 42,921 Residential Condominium comprising 373 units at Punggol Jul-2013 Nov-2015
BT 9/5/13 Architects Pte Ltd Corporation Pte Ltd
and UE E&C Ltd JV) Field Walk/Punggol East (Waterwoods)

Erection of a block of 25-storey condominium


YTL Westwood Properties
comprising 77 units on the former Westwood BT 9/1/13 & YTL Construction
Pte Ltd (Subsidiary of YTL - - 17,791 Residential Aug-2012 May-2015 DP Architects
Apartments site at Orchard Boulevard 24/6/13 (S) Pte Ltd
Land & Devlopment Bhd)
(Westwood)

Tripartite Developers Pte


Ltd (Hong Leong Lian Beng
Erection of 9 blocks of 8-storey condominium
Holdings, City 115 - 33,290 Residential Jul-2013 Oct-2015 BT 25/6/13 Ong & Ong Pte Ltd Construction (1988)
comprising 396 units at Flora Drive
Developments & TID Pte Pte Ltd
Ltd JV)

Erection of 2 blocks of 12-storey condominium Arc Studio Daewoo


Hong Leong Holdings BT 1/11/12 &
- - 10,571 Residential comprising 91 units at 1 Balmoral Road Jul-2012 Dec-2014 Architecture + Engineering &
Limited BT 27/6/13
(One Balmoral) Urbanism Construction Co

Erection of a 2-storey factory with roof garden at


Chang Hua
15 (including 158A Gul Circle Architects 23.5
Det Norske Veritas Pte Ltd - 5,544 Industrial Jun-2013 Jan-2014 BT 2/7/13 Construction Pte
other costs) (DNV Material Technology Structure Integrity Degree
Ltd
Test Laboratory)

Page 55
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Wingcrown Investment Pte


Erection of 4 blocks of 5-storey & 3 blocks of Greatearth
Ltd P & T Consultants
- - 49,950 Residential 24-storey condominium comprising 469 units at May-2013 Dec-2015 ST 30/5/13 Construction Pte
(Wing Tai Holdings, Metro Pte Ltd
Prince Charles Crescent Ltd
Holdings & UE E&C JV)

ST 19/6/13 &
URA tender
World Class Land Pte Ltd - 15,125 - Residential Residential development at Faber Walk - - - -
award
20/6/13

BT 21/6/13 &
Athens Residential
URA tender
Development Pte Ltd - 37,441 - Residential Residential development at Coronation Road - - - -
award
(Subsidiary of CapitaLand)
24/6/13

Erection of a 6-storey light industrial building


20
Rigel Technology (S) Pte with roof amenities & a semi-basement carpark at
(including - 15,875 Industrial Sep-2013 Nov-2014 ST 20/6/13 DSA Architects Soil-Build Pte Ltd
Ltd Changi Business Park
other costs)
(Rigel Technology's Headquarters)

Erection of a block of 26-storey apartment


JGP Architecture (S) Novelty Builders
Novelty Corp Pte Ltd - - 9,775 Residential building comprising 180 units at Newton Road Jan-2013 Jan-2015 ST 22/6/13
Pte Ltd Pte Ltd
(26 Newton)

Page 56
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Conservation and Additions & Alterations to 6


WRH Pte Ltd units of 2-storey shophouses with shops on 1st ST 22/4/12;
Residential &
(Subsidiary of Warees - - 3,992 storey and a 5-storey rear extension comprising 3Q 2013 2Q 2016 BT & ST S H Lim Architects -
Commercial
Investments Pte Ltd 42 residential units at East Coast Road 22/6/13
(The Red House)

Pre 8 Investments Pte Ltd


45 Sunray Woodcraft
(An entity comprising Additions & Alterations to existing conservation Multiply Architects
(including - 14,860 Commercial Jun-2013 Dec-2014 ST 22/6/13 Construction Pte
Perennial Real Estate building at 30 Victoria Street (Chijmes) & Engineers LLP
other costs) Ltd
Holdings & others)

Upgrading of Ai Tong Primary School at 100


Ministry of Education - - - Institutional 1Q 2014 4Q 2015 ST 22/6/13 LT & T Architects -
Bright Hill Drive

Upgrading of Anderson Primary School at 19 Interconsultants Pte


Ministry of Education - - - Institutional 1Q 2014 3Q 2015 ST 22/6/13 -
Ang Mo Kio Avenue 9 Ltd

Upgrading of Tao Nan Primary School at 300 ADDP Architects


Ministry of Education - - - Institutional 4Q 2013 4Q 2015 ST 22/6/13 -
New Upper Changi Road LLP

Page 57
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Upgrading of Raffles Girls' Primary School at 21


Ministry of Education - - - Institutional 1Q 2014 4Q 2015 ST 22/6/13 SD Architects LLP -
Hillcrest Road

Upgrading of South View Primary School at 6 Architects Vista Pte


Ministry of Education - - - Institutional 4Q 2013 - ST 22/6/13 -
Choa Chu Kang Central Ltd

Construction of a new infectious disease hospital


ST 21/3/13 &
Ministry of Health - - 87,367 Institutional at Jalan Tan Tock Seng 2014 2018 CPG Consultants -
22/6/13
(National Centre for Infectious Disease)

Improvement to roadside drains - Eng Lam


Civil Meinhardt
Public Utilities Board 15 - - EUP Batch 7 - Contract 2 for Lucky Heights Estate Jun-2013 Jun-2015 BT 25/6/13 Contractors Co Pte
Engineering (Singapore) Pte Ltd
(Eastern Sector) Ltd

Le Premier Development
Pte Ltd
Redevelopment of Minton Court into high-end BT & ST
(Indirect wholly-owned - 1,233 - Residential - - - -
cluster houses at 21 Paya Lebar Crescent 26/6/13
subsidiary of Logistics
Holdings Limited)

Page 58
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of a single-user part 4/part 5-storey light Apr-2013 (Piling); Sep-2013 (Piling); CS Bored Pile
Givaudan Singapore Pte ATA Architects Pte
- - - Industrial industrial building with a warehouse at Pioneer 3Q 2013 (Main 2014 (Main ST 27/6/13 System Pte Ltd
Ltd Ltd
Turn Contract) Contract) (Piling contractor)

UE Development Erection of 2 blocks of 30-storey & 2 blocks of


Daewoo
(Bendemeer) Pte Ltd 29-storey condominium comprising 843 units and BT 8/5/12 & CPG Consultants
- - 71,680 Residential Mar-2013 Sep-2015 Engineering &
[Subsidiary of United 2/3-storey terrace houses comprising 19 units 16/5/13 Pte Ltd
Construction Co Ltd
Engineers Developments] at Whampoa East (Eight Riversuites)

Easthouse Properties Pte


Erection of 4 blocks of 18-storey & 2 blocks of
Ltd (Frasers Centrepoint, Consortium 168 Nakano Singapore
- - 45,501 Residential 16-storey condominium comprising 493 units at Jan-2012 Jan-2015 ST 18/5/13
Far East Organization & Architects Pte Ltd Pte Ltd
Upper Serangoon View (Boathouse Residences)
Sekisui House JV)

Erection of a 12-storey mixed development


Oxley-Lian Beng Pte Ltd comprising a 10-storey residential tower with 160 RSP Architects
Residential &
(Oxley Holdings & Lian - - 15,899 units & a 2-storey retail podium with 2 basements 3Q 2013 1Q 2016 ST 18/5/13 Planners & -
Commercial
Beng Group JV) of retail/carpark at Upper Serangoon Road Engineers
(The Midtown and Midtown Residences)

Hong Realty (Private)


Erection of 12 blocks of 11 to 13-storey
Limited [Hong Realty, City BT 19/3/13 &
- - 86,677 Residential condominium comprising 912 units 3Q 2013 end 2017 Architects 61 -
Developments & Hong ST 25/5/13
at Pasir Ris Grove (d'Nest)
Leong Holdings JV]

Page 59
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Oxley Sanctuary Pte Ltd Mixed development on the site of McDonald's


(Oxley Holdings, Heeton Place comprising a 2-storey commercial podium BT & ST RSP Architects
Residential &
Holdings, KSH Holdings, - - 16,604 & 2 residential blocks of 4/5-storey with 142 units 2Q 2014 1Q 2017 11/4/12; BT Planners & -
Commercial
Lian Beng Group & Zap at King Albert Park 30/5/13 Engineers
Piling JV) (KAP and KAP Residences)

Design & build of 8 blocks of 16-storey Executive Qingdao


Qingjian Realty (Punggol P & T Consultants
- - 56,243 Residential Condominium comprising 512 units at Punggol Aug-2013 Apr-2016 BT 31/5/13 Construction
Way) Pte Ltd Pte Ltd
Way/Punggol Walk (Ecopolitan) (Singapore) Pte Ltd

Erection of 2 blocks of 5-storey apartment


Team Design G-Art Design &
Regal Realty Pte Ltd - - 3,320 Residential buildings comprising 58 units at Jalan Loyang Mar-2013 Feb-2015 ST 1/6/13
Architects Pte Ltd Build Pte Ltd
Besar (Ocean Front Suites)

RH Mount Sophia Pte Ltd


Erection of a 6-storey apartment building Ronny Chin &
(Subsidiary of Roxy-Pacific - - 3,423 Residential 3Q 2013 - ST 1/6/13 -
comprising 64 units at Adis Road (Liv on Sophia) Associates Pte Ltd
Holdings)

White Haven Properties Erection of 6 blocks of 15/16/17-storey


DCA Architects Pte
Pte Ltd (Subsidiary of City - - 55,023 Residential condominium comprising 616 units at Buangkok 3Q 2013 3Q 2016 BT 4/6/13 -
Ltd
Developments) Drive/Sengkang Central (Jewel @ Buangkok)

Page 60
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

FCL Topaz Pte Ltd, Far


BT & ST
East Orchard Ltd & Sekisui
14/6/13 &
House Ltd (Frasers
- 14,931 - Residential Residential development at Fernvale Close - - HDB tender - -
Centrepoint, Far East
award
Orchard & Sekisui House
14/6/13
JV)

Civil
Land Transport Authority 14 - - Sewer diversion at Springleaf station Jun-2013 Oct-2014 ST 14/6/13 - Swee Hong Limited
Engineering

Dillenia Land Pte Ltd


Residential redevelopment on the site of Gilstead
(Subsidiary of Tuan Sing - 7,012 - Residential - - ST 18/6/13 - -
Court at Gilstead Road
Holdings Limited)

RH East Coast Pte Ltd Residential redevelopment on the site of


(Subsidiary of Roxy-Pacific - - - Residential Sunnyvale Apartments at 134B Lorong K Telok - - BT 18/6/13 - -
Holdings) Kurau

RH Draycott Park Pte Ltd


Residential redevelopment on the site of Yi Mei
(Subsidiary of Roxy-Pacific - - - Residential - - BT 18/6/13 - -
Garden at 111 Tampines Road
Holdings)

Page 61
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT & ST RSP Architects


Erection of a 5-storey campus at Nepal Park Obayashi
ESSEC 40 - 6,514 Institutional May-2013 Nov-2014 1/11/12; Planners and
(ESSEC Business School) Corporation
27/2/13 Engineers

Viking Facilities
Additions & Alterations to the existing factory at
Management & Operations 10 - 12,780 Industrial Jul-2013 Jul-2014 ST 27/4/13 Caide Architects Soil-Build Pte Ltd
Kian Teck Road (Viking Innovation Centre)
Pte Ltd

Redevelopment of the Fort Canning Centre into


Art Heritage Singapore Pte an Art Museum with other retail outlets BT & ST
- - 5,900 Institutional 4Q 2013 1Q 2015 DP Architects -
Ltd at Fort Canning Park 30/5/13
(Singapore Pinacotheque de Paris)

200 (including BT & ST


Amgen Singapore Erection of a biologics plant at Tuas View Jacobs Engineering Lend Lease
investment - 11,712 Industrial Jun-2013 Sep-2014 18/1/13 & ST
Manufacturing Pte Ltd Drive/Tuas Biomedical Park Singapore Singapore
cost) 4/6/13

St. John's Home for Elderly Construction of a new 5-storey building at Wan
12 - - Institutional - - ST 10/6/13 - -
Persons Tho Avenue

Page 62
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 11 blocks of 5-storey & 8 blocks of


Elitist Development Pte Swan & Maclaren
- - 32,651 Residential 4-storey condominium comprising 380 units at 1Q 2014 1Q 2016 BT 17/5/13 -
Ltd LLP
Elias Road/Pasir Ris Drive 3 (Stratum)

Keppel Bay Pte Ltd Erection of 11 blocks of 5 to 10-storey DCA Architects Pte
BT & ST
(Subsidiary of Keppel - - 52,118 Residential condominium comprising 366 units at Keppel Bay 3Q 2013 3Q 2016 Ltd /Studio Daniel -
18/5/13
Land) Drive (Corals at Keppel Bay) Libeskind

Erection of a Primary School at 2A Prince Charles Kwan Yong


Ministry of Education 33 - 24,227 Institutional May-2012 Nov-2013 ST 21/5/13 ID Architects
Crescent (Alexandra Primary) Construction

Erection of a Primary School at 60 Bukit Panjang


Ministry of Education 31.5 - 26,815 Institutional May-2012 Oct-2013 ST 21/5/13 CPG Consultants Hytech Builders
Ring Road (West Spring Primary)

Erection of a nursing home at


Ministry of Health - - 16,700 Institutional end 2014 3Q 2016 ST 31/5/13 - -
Ang Mo Kio Avenue 8

Page 63
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

ST 31/5/13 &
Qingjian Realty (South Executive condominium development at HDB tender
- 23,000 - Residential - - - -
Pacific) Group Pte Ltd Anchorvale Crescent award
31/5/13

Majlis Ugama Islam Construction of a new mosque at Jalan ST 24/2/13 &


- - - Insitutional 3Q 2015 2Q 2016 - -
Singapura (MUIS) Bahar/Jurong West Avenue 2 1/6/13

Majlis Ugama Islam Construction of a new mosque at Woodlands ST 24/2/13 &


- - - Insitutional 4Q 2014 2Q 2016 - -
Singapura (MUIS) Drive 17 1/6/13

Majlis Ugama Islam Construction of the Punggol Mosque at Punggol ST 24/2/13 & Formwerkz
17 to 19 - - Insitutional late 2013 2015 -
Singapura (MUIS) Field/Punggol Place 1/6/13 Architects

Erection of a logistics hub at Jurong West BT 8/12/12 &


YCH Group Pte Ltd 200 - - Industrial - 2015 - -
(Supply Chain City) ST 4/6/13

Page 64
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Church of St. Alphonus Upgrading & expansion of the Novena Church at ST 26/9/11 & CGN Architects Pte
45 - - Institutional - - -
(Novena Church) 300 Thomson Road 5/6/13 Ltd

Church of Saints Peter & Upgrading of the Church of Saints Peter & Paul at
- - - Institutional Oct-2013 - ST 5/6/13 - -
Paul 225C Queen Street

Building & contingency works at Tampines


Housing & Development ADDP Architects
131 - - Residential Neighbourhood 5 Contract 9 comprising 960 Oct-2011 Feb-2014 BT 18/5/13 Soil-Build Pte Ltd
Board LLP
units

Building & contingency works at Ang Mo Kio Surbana


Housing & Development
101.4 - 73,297 Residential Neighbourhood 5 Contract 26 Apr-2013 Oct-2017 BT 18/5/13 International Soil-Build Pte Ltd
Board
comprising 712 units Consultants Pte Ltd

Design & Build of upgrading projects for G14G -


Housing & Development The Architects
24.5 - - Residential Home Improvement Programme (HIP) at Bukit Jun-2013 Dec-2014 BT 18/5/13 Soil-Build Pte Ltd
Board Circle Pte Ltd
Batok West Avenue & Bukit Batok Street 31

Page 65
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Design & Build of 1 block of 14-storey & 1 block


PLC 8 Development Pte
of 17-storey light industrial buildings with a part ADDP Architects
Ltd (Part of Soilbuild - - 85,044 Industrial May-2012 Dec-2013 BT 18/5/13 Soil-Build Pte Ltd
3/4-storey podium at Lavender Street/Kallang LLP
Group)
Avenue

SB (Westview) Investment
Erection of a block of 9-storey ramp-up factory AC Consortium Pte
Pte Ltd (Subsidiary of - - 37,524 Industrial May-2013 Aug-2014 BT 18/5/13 Soil-Build Pte Ltd
comprising 68 units at Bukit Batok Street 23 Ltd
Soilbuild Group)

SB (Mandai) Investment Erection of a 10-storey ramp-up multiple-user


AC Consortium Pte
Pte Ltd (Subsidiary of - - 55,877 Industrial clean & light industrial factory building Aug-2013 Feb-2015 BT 18/5/13 Soil-Build Pte Ltd
Ltd
Soilbuild Group) comprising 344 units at Mandai Link

213 Erection of an international school at Yishun


Gems World Academy Pte CPG Consultants Lend Lease
(investment - 35,546 Institutional Avenue 6/Yishun Avenue 1 Jan-2013 Dec-2014 BT 28/5/13
Ltd Pte Ltd Singapore Pte Ltd
cost) (Gems World Academy)

25 (including
Upgrading of the Orchard Hotel Shopping BT & ST
CDL Hospitality Trusts miscellaneous - - Commercial late 2013 late 2014 - -
Arcade at Orchard Road 28/5/13
costs)

Page 66
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Civil Construction of a new SBS bus depot along BT & ST


Land Transport Authority - - - - 2015 - -
Engineering Loyang Avenue & Pasir Ris Drive 3 30/5/13

Erection of 4,900 Build-To-Order (BTO) flats at


Sembawang (EastBank @ Canberra, EastBrook @
Canberra & EastWave @ Canberra), Hougang
Housing & Development BT & ST
- - - Residential (Golden Mint & Hougang Crimson), Choa Chu - - - -
Board 31/5/13
Kang (Keat Hong Crest), Jurong West (Spring
Haven @ Jurong) and Woodlands (Woodlands
Pasture I & II)

Erection of a single-storey building with a part


Halliburton Completion 2-storey administration building & ancillary RSP Architects
Obayashi
Tools Manufacturing Pte - - 12,847 Industrial structures at Tuas South Avenues 7 & 12 Apr-2013 Apr-2014 BT 19/3/13 Planners &
Corporation
Ltd (Halliburton Completion Tools Manufacturing Engineers
Plant Phase 2)

Solvay Novecare Asia


50 - - Industrial Erection of an alkoxylation plant at Jurong Island - - BT 17/4/13 - -
Pacific

Additions & Alterations to the existing


International Building involving extension of a
Hong Fok Corporation single-storey commercial block and
- - - Commercial - - BT 16/5/13 - -
Limited redevelopment of the existing carpark block into
a new 27-storey hotel at 360 Orchard
Road/Claymore Hill

Page 67
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Sembcorp Cogen Pte Ltd


Erection of an industrial/commercial
(Subsidiary of Sembcorp 300 - - Industrial - - BT 21/5/13 - -
waste-to-energy plant at Jurong Island
Industries Ltd)

Development 83 Pte Ltd Erection of 2 blocks of 5-storey apartment Rich-Link


Metaphor Design +
(Subsidiary of TEE - - 3,859 Residential buildings comprising 51 units at Duku Road Jun-2013 Feb-2015 ST 23/5/13 Construction Pte
Architecture Pte Ltd
International) (Aura 83) Ltd

Erection of a 5-storey multi-user print media hub


Techwah Industrial ST 12/8/12 & Axis Architects LC&T Builder (1971)
- - 22,683 Industrial building with a basement carpark Dec-2012 Apr-2014
Corporation Ltd BT 23/5/13 Planners Pte Ltd Pte Ltd
at Tai Seng Avenue (Pixel Red)

Additions & Alterations to the existing ST 2/3/13 & Samson Tan


Select Group Limited 4 - - Commercial Jul-2013 Oct-2013 -
Chinatown Food Street at Smith Street 2/5/13 Associates

BT 10/5/13 &
Qingjian Realty (South Executive condominium development at HDB tender
- 21,004 - Residential - - - -
Pacific) Group Pte Ltd Woodlands Avenue 5/Woodlands Avenue 6 award
13/5/13

Page 68
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Cathedral of the Good Upgrading of the Cathedral of the Good


40 - - Institutional - - ST 10/5/13 - -
Shepherd Shepherd at Queen Street

Piling works for 2 blocks of 36-storey & 1 block of


Clementi Development Pte
33-storey condominium comprising 755 units at Axis Architects Ryobi Kiso (S) Pte
Ltd (Subsidiary of IOI - - 68,369 Residential Jan-2013 Sep-2014 BT 15/5/13
Jalan Lempeng Planners Pte Ltd Ltd
Group of Malaysia)
(The Trilinq)

Design & Build of a 6-storey multi-temperature Precise


Ace Architects &
CWT Limited - - 68,774 Industrial controlled distribution & storage building at Jalan Mar-2012 Sep-2013 BT 15/5/13 Development Pte
Associates
Buroh/Fishery Port Road (CWT Cold Hub 2) Ltd

Precise
Design & Build of a 6-storey single-user
CWT Logistics (S) Pte Ltd - - 55,866 Industrial Oct-2012 Nov-2013 BT 15/5/13 Index Architects Development Pte
warehouse at 5A Toh Guan Road East
Ltd

Redevelopment of an old industrial site into a


CWT Limited - - - Industrial multi-storey ramp-up logistics facility at Pandan - - BT 15/5/13 - -
Avenue

Page 69
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Westbuild Construction Pte


Industrial development at 54, 56, 56A & 58 AC Consortium Pte
Ltd (Subsidiary of Hiap - - 4,476 Industrial 2nd half 2013 2015 BT 16/5/13 -
Kallang Pudding Road Ltd
Hoe Limited)

Mapletree Business City


700 (total Redevelopment of The Comtech into a new
Pte Ltd (Subsidiary of DCA Architects Pte
development - 119,739 Commercial business park at Alexandra Terrace end 2013 2016 BT 16/5/13 -
Mapletree Investments Pte Ltd
cost) (Mapletree Business City Phase 2)
Ltd)

Design & build of a single-storey aircraft repair


Aircraft Support
Jet Aviation (Asia Pacific) workshop with a 2-storey annex building &
- - 9,367 Industrial May-2013 Mar-2014 ST 22/1/13 Liu & Wo Architects Industries
Pte Ltd upgrading to an existing single-storey hangar at
(Singapore)
West Camp Road

Erection of a 32-storey commercial building


Oxley Consortium Pte Ltd RSP Architects Lian Beng
comprising a 3-storey podium & a 29-storey office BT 3/4/12 &
(Subsidiary of Oxley 86.3 - 16,840 Commercial May-2013 Jul-2016 Planners & Construction (1988)
tower at Robinson Road/McCallum Street 30/4/13
Holdings) Engineers Pte Ltd
(Oxley Tower)

122 Middle Investment Pte


Ltd (A consortium BT&ST
Millennium
including Millennium Erection of a 14-storey hotel on the site of the 7/10/11; ST
- - 11,899 Commercial May-2013 Dec-2015 Ong & Ong Pte Ltd International
Land Pte Ltd an associate former Midlink Plaza at 122 Middle Road 15/12/12 &
Builders Pte Ltd
company of Lian Beng BT 30/4/13
Group)

Page 70
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Keppel Data Centres Development of Keppel Data Centres Holding's


- - - Industrial - - BT 1/5/13 - -
Holding Pte Ltd third data centre at Tampines

BT/ST
Design & build of 3 blocks of 21-storey
8/8/12; HDB
UVD Pte Ltd (Singapore condominium comprising 435 units & 10 units of Unison
- - 41,386 Residential Jan-2013 Aug-2015 tender award P & T Consultants
Land & UOL Group JV) 3-storey semi-detached houses at 18 Bright Hill Construction
10/8/12 & ST
Drive
4/5/13

Wee Hur-Lucrum Pte Ltd


Condominium redevelopment on the site of
(Wee Hur Development BT 7/9/12 &
- 50,196 - Residential Thomson View condominium at 1 Bright Hill - - P & T Consultants -
Pte Ltd & Lucrum Capital ST 4/5/13
Drive
Pte Ltd JV)

Aurum Land (Private) Erection of 3 blocks of residential buildings


Limited (Subsidiary of - - 4,859 Residential comprising 65 units on the former site of Jasmine 1Q 2014 end 2016 ST 4/5/13 Park + Associates -
Woh Hup Holdings) Court at 311 Upper Thomson Road (Three 11)

Sing Holdings (Robin) Pte


Condominium development on an amalgamated BT 15/12/11 Design Link
Ltd (Subsidiary of Sing - - 11,543 Residential 2Q 2013 - -
site at Robin Drive/Robin Road & BT 9/5/13 Architects
Holdings Limited)

Page 71
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

ST 7/12/12,
HDB tender
Sing Holdings Limited & Executive condominium development at Punggol
- 14,307 - Residential 2Q 2013 - award - -
UE E&C Ltd JV Field Walk/Punggol East
10/12/12 &
BT 9/5/13

Roxy Residential Pte Ltd Erection of 4 blocks of 5-storey apartment


(Subsidiary of Roxy-Pacific - - 12,236 Residential buildings comprising 171 units & 2 shop units at 3Q 2013 3Q 2016 ST 9/4/13 JGP Architecture -
Holdings) Lew Lian Vale (Jade Residences)

KVH (Singapore) Pte Ltd - - - Industrial Erection of a data centre in Singapore - - BT 19/4/13 - -

Corporate Residence Pte


Erection of a block of 17-storey apartment Feb-2013 (Piling); May-2013 (Piling);
Ltd (SingHaiyi Group Ltd KH Foges Pte Ltd
- - 3,257 Residential building comprising 56 units at 235 Balestier May-2013 (Main Apr-2016 (Main BT 25/4/13 Design Metabolists
& Hong Kong listed Xpress (piling contractor)
Road (Cosmoloft) Contract) Contract)
Group Limited JV)

Redevelopment of UIC Building into a block of


UIC Investments
54-storey apartment building (V On Shenton) BT 18/5/12 &
(Properties) Pte Ltd Residential & Samsung C&T
- - 86,781 comprising 510 units, 1 block of 23-storey office Jun-2013 Mar-2017 20/7/12; ST Architects 61
[Subsidiary of United Commercial Corporation
building, 2 basement carparks & a 7-storey 27/4/13
Industrial Corporation]
podium at Shenton Way

Page 72
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Civil Construction of a flyover across West Coast


Land Transport Authority - - - 4Q 2013 4Q 2017 ST 1/5/13 - -
Engineering Highway at Buroh Circus

Mixed development of a 20/64-storey building


BT&ST
comprising 6-storey commercial & carpark
JV between GuocoLand & 3,200 24/2/11, Architects 61 with
Commercial & podium, 14-storey hotel, 32-storey office & Samsung C&T
Employees Provident Fund (including land - 157,738 Apr-2013 May-2016 17/6/11, Skidmore, Owings
Residential 26-storey residential apartments comprising 181 Corporation
(EPF) of Malaysia cost) 3/5/13 & & Merrill of USA
units at Peck Seah Street/Choon Guan Street
7/12/13
(Tanjong Pagar Centre/Guoco Tower/TP180)

Restoration of the existing Holttum & Ridley


Aces System
National Parks Board 1.1 - - Institutional Halls into a museum at Singapore Botanic Apr-2013 Aug-2013 ST 9/4/13 -
Development
Gardens

Construction of the Phase 2 solution


Zeon Chemicals Singapore
- - - Industrial styrene-butadiene (SSBR) rubber plant at Jurong 2014 - BT 9/4/13 - -
Pte Ltd
Island

Erection of a 4-storey Indian Heritage Centre at ST 4/4/12 & Robert Greg Shand Yong Xing
National Heritage Board 20.8 - 2,989 Institutional Apr-2013 Jun-2014
Campbell Lane/Clive Street 11/4/13 & URBNarc Construction

Page 73
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Bayfront Realty Pte Ltd Erection of 11 blocks of 14/15/16-storey


(Fragrance Group Ltd & condominium comprising 582 residential units & ST 9/3/13 &
- - 42,271 Residential Apr-2013 Oct-2015 SAA Architects F G Builders
World Class Land Pte Ltd 3 shop units at Tanah Merah Kechil Link 13/4/13
JV) (Urban Vista)

BT 19/4/13 &
Harvestland Development
URA tender
Pte Ltd (Subsidiary of - 10,991 - Residential Residential development at Kim Tian Road - - - -
award
Keppel Land)
23/4/13

Construction of the Centre for Oral Health at the


National University
- - 26,000 Institutional National University Hospital at Lower Kent - 2017 ST 21/4/13 - -
Hospital
Ridge Road

Erection of a 4-storey building comprising 55


Fragrance Realty Pte Ltd - - 6,851 Residential residential units & 45 commercial units on the 1st Apr-2013 Apr-2015 ST 22/4/13 SAA Architects F G (77) Pte Ltd
storey at 275 Thomson Road (Novena Regency)

Transurban Properties Pte


Erection of 23 blocks of 5-storey condominium
Ltd & OPH Marymount
comprising 697 units & 6 blocks of 3-storey
Limited (Far East - - 57,766 Residential Jun-2012 Dec-2014 ST 23/4/13 DP Architects Woh Hup
terrace houses comprising 51 units at Jalan Eunos
Organization & Far East
(euHabitat)
Orchard Ltd JV)

Page 74
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Construction of a new Wenya bus depot off


Land Transport Authority - - - Building Others - 2015 BT 24/4/13 - -
Jurong West Avenue 2

SAA Architects,
BT&ST Benoy, AECOM
Changi Airport Group Construction of Changi Airport's Terminal 4 on
600 - - Building Others 4Q 2013 2017 9/2/13 & Singapore and Beca -
(Singapore) Pte Ltd the site of the former Budget Terminal
25/4/13 Carter Hollings &
Ferner (SEA)

Erection of 1 block of 19-storey condominium


comprising 175 units & 39 units of BT 14/7/12 & Santarli
Santarli Realty Pte Ltd - - 18,674 Residential Oct-2012 Jun-2015 ADDP Architects
part 4/part 5-storey row houses at Upper 25/4/13 Construction
Serangoon Road/Pheng Geck Avenue (Sant Ritz)

Widening of Pasir Panjang Road and West Coast


Civil
Land Transport Authority - - - Road between South Buona Vista Road and West 4Q 2013 4Q 2017 ST 26/4/13 - -
Engineering
Coast Link

DBS Trustee Limited 108 (including Erection of a 7-storey Data Centre at One-North,
(as Trustee of Mapletree investment - 35,749 Industrial Ayer Rajah Cluster 2Q 2013 4Q 2014 BT 28/3/13 3HPArchitects -
Industrial Trust) costs) (Equinix Singapore's 3rd Data Centre)

Page 75
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Action Property Pte Ltd Design & erection of a block of 9-storey factory
(Lian Beng Group, Oxley comprising 424 units & other ancillary facilities at AC Consortium Pte L.S. Construction
112 - 70,432 Industrial Apr-2013 Apr-2015 BT 4/4/13
Holdings & Sunview Pte Sunview Road/Jalan Buroh/Pioneer Road Ltd Pte Ltd
Ltd JV) (Eco-Tech@Sunview)

Oxley Bliss Pte Ltd (Oxley Design & erection of a part 3-storey/part 7-storey
AC Consortium Pte Deenn Engineering
Holdings & Lian Beng 89 - 65,892 Industrial multiple-user industrial building at Tampines Apr-2013 Apr-2015 BT 4/4/13
Ltd Pte Ltd
Group JV) Industrial Crescent

RB Capital Farrer Hotel Pte Mixed development of hotel & office at Rangoon RSP Architects
BT 18/4/12 &
Ltd & RB Capital Farrer - - 13,000 Commercial Road/Farrer Park Station Road 2013 2015 Planners & -
5/4/13
Commercial Pte Ltd (Park Hotel Farrer Park) Engineers

BT 12/4/13 &
Secure Development Pte
HDB tender
Ltd (Subsidiary of UOL - 16,604 - Residential Residential development at Sengkang West Way - - - -
award
Group)
12/4/13

Additions & alterations from basement to level 5


Marina Centre Holdings Shimizu
95 - 22,713 Commercial of existing Marina Square with a 2-storey Mar-2013 Jan-2015 BT 18/4/13 DP Architects
Pte Ltd Corporation
extension at 6 Raffles Boulevard

Page 76
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Additions & alterations to the existing Chinatown Samson Tan


Select Group Limited 4 - - Commercial Jul-2013 - ST 2/3/13 -
Food Street at Smith Street Associates

Design & build of upgrading projects for G14E - Logistics


Housing & Development
26 - - Residential Home Improvement Programme (HIP) at Apr-2013 Oct-2014 BT 4/4/13 AWP Pte Ltd Construction Pte
Board
Clementi Avenues 3 & 5 Ltd

Design & build of upgrading projects for G15E - Logistics


Housing & Development The Architects
24.9 - - Residential Home Improvement Programme (HIP) at Apr-2013 Oct-2014 BT 4/4/13 Construction Pte
Board Circle Pte Ltd
Aljunied Crescent & Eunos Crescent Ltd

Refurbishment of the existing Holttum Hall into a


National Parks Board - - - Institutional Jun-2013 Nov-2013 ST 9//4/13 - -
museum at Singapore Botanic Gardens

Erection of 14 blocks of 13-storey executive


ST 28/12/12; Surbana
Hao Yuan Investment Pte condominium comprising 653 units at Woodlands
- - 79,437 Residential Feb-2013 Aug-2015 BT&ST International GLG Engineering
Ltd Avenue 5/Woodlands Drive 16
10/4/13 Consultants
(Forestville)

Page 77
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Design & build of 8 blocks of 14-storey executive


FCL Admiralty Pte Ltd China Construction
condominium comprising 418 units at Woodlands BT & ST Consortium 168
(Frasers Centrepoint & - - 46,215 Residential Mar-2013 Nov-2015 (South Pacific)
Avenue 6/Woodlands Drive 16 10/4/13 Architects
Lum Chang JV) Development Co
(Twin Fountains)

Freshview Developments
Pte Ltd (City Erection of 2 blocks of 43-storey condominium Daewoo
Developments, Hong - - 52,057 Residential comprising 508 units at Alexandra View Apr-2013 Apr-2016 BT 8/1/13 SCDA Architects Engineering &
Leong Holdings & Hong (Echelon) Construction Co
Realty JV)

TrustHouse Pte Ltd [Far Erection of a block of 20-storey, a block of


East Organization, Sekisui 23-storey & a block of 21-storey condominium China Construction
House & China - - 32,310 Residential comprising 396 units and 20 units of 3-storey Nov-2012 Sep-2015 ST 9/2/13 DP Architects (South Pacific)
Construction (South terrace houses at Choa Chu Kang Road/Phoenix Development Co
Pacific) JV] Road (Hillsta)

Upgrading to existing Blocks 1 to 4 & addition of


St Luke's Hospital - - 3,727 Institutional a 7-storey building (Block 5) for St Luke's Nov-2012 Nov-2013 ST 13/3/13 Design Architects TMG Projects
Hospital at 2 Bukit Batok Street 11

Ministry of Health - - - Institutional Construction of Jurong West Polyclinic - 2017 ST 13/3/13 - -

Page 78
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

ST 13/3/13;
Construction of Sengkang General Hospital &
Ministry of Health - - - Institutional - 2018 BT&ST - -
Sengkang Community Hospital
2/12/11

a) Construction of 4 new general hospitals


b) Construction of 10 to 12 polyclinics in
Ministry of Health - - - Institutional - 2020-2030 ST 13/3/13 - -
Singapore

Erection of 1 block of 26-storey & 2 blocks of


Kingsford Development 12-storey condominium comprising 512 units at Kingsford
- - 38,958 Residential Feb-2013 Sep-2015 ST 26/3/13 P & T Consultants
Pte Ltd Hillview Avenue Construction
(Kingsford . Hillview Peak)

Erection of 3 blocks of 24-storey condominium


S P Setia International (S) BT & ST ADDP Architects Tiong Seng
135.4 - 43,198 Residential comprising 483 units at Chestnut Avenue Mar-2013 Nov-2015
Pte Ltd 26/3/13 LLP Contractors
(Eco Sanctuary)

Erection of 114 units of 3-storey terrace houses


Kallang Development Pte BT & ST ADDP Architects Tiong Seng
88 - 27,844 Residential with attic at Jalan Ulu Seletar/Sembawang Road Apr-2013 Jan-2015
Ltd 26/3/13 LLP Contractors
(The Springside Phases 11A, 11B, 12 & 13)

Page 79
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Construction of a multi-purpose sports facility at


Ang Mo Kio Town Council 1.5 - - Recreational Buangkok Crescent - 1st half of 2015 ST 28/3/13 - -
(Jalan Kayu Sports Hub)

Erection of a 5-storey building with a basement


Pollux Treasures Pte Ltd comprising 93 commercial units & mechanised
Commercial/ BT 24/12/11 Metaphor Design +
(Subsidiary of Pollux - - 1,933 carpark and an 8-storey apartment building 2013 2016 -
Residential & 28/3/13 Architecture
Properties Ltd) behind comprising 42 residential units at 345
Geylang Road (Pavilion Square)

Wealth Development Pte


Ltd, Kim Seng Heng Realty
Pte Ltd & Development 16
Commercial redevelopment of AIA Changi at 160
Pte Ltd (Subsidiaries of - 1,670 - Commercial - - BT 29/3/13 - -
Changi Road
Lian Beng Group Ltd, KSH
Holdings Ltd & Tee
International Ltd)

Erection of a 6-storey Buddhist college,


Kong Meng San Phor Kark Lee Coo Consultant Ang Cheng Guan
- - 12,618 Institutional a 4-storey multi-storey carpark & a 4-storey joss Dec-2012 Oct-2014 ST 30/3/13
See Monastery Associates Construction
paper burner at 88 Bright Hill Road

Erection of a single-storey building with a


Kim Seng Heng
basement, landscaped park, carpark, storage
JTC Corporation 59.9 - - Building Others Apr-2013 Jan-2015 BT 3/4/13 CPG Consultants Engineering
space & shell space for a district cooling system
Construction
plant at Ayer Rajah Avenue

Page 80
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of a block of 5-storey commercial


building comprising 9 units of restaurant, 108 Lim Wen Heng
RP East Pte Ltd - - 7,761 Commercial May-2012 May-2014 ST 4/4/13 JGP Architecture
units of shops & 75 units of office Construction
at 80 Changi Road (Centropod@Changi)

Installation of closed-circuit television (CCTV)


Housing & Development Civil cameras near service roads & loading bays
- - - 2Q 2013 Dec-2013 ST 4/4/13 - -
Board Engineering around HDB carparks at 55 locations including
Bedok, Toa Payoh & Sengkang

BT 9/2/13 &
Boilermaster Holdings Pte Industrial development at Plot 10, Tuas South
- 3,036 - Industrial - - JTC tender - -
Ltd Street 8
result 21/3/13

BT 9/2/13 &
Soon Hock Group Pte Ltd - 39,616 - Industrial Industrial development at Tuas South Avenue 10 - - JTC tender - -
result 21/3/13

Erection of a 6-storey multi-user research &


JTC Corporation 49.9 - 22,300 Industrial development building at Cleantech Nov-2012 Jul-2014 BT 16/2/13 Jurong Consultants Sanchoon Builders
View/Cleantech Loop (CleanTech Two)

Page 81
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of an 18-storey Tower A & an 11-storey


BT&ST
Tower B of research buildings at Fusionopolis GS Engineering &
JTC Corporation 216.9 - 84,215 Industrial Nov-2011 Mar-2014 16/2/11; BT P & T Consultants
Way/Ayer Rajah Avenue (Fusionopolis Phase Construction Corp
16/2/13
2A)

Erection of a block of 5-storey Tower C research


GS Engineering &
JTC Corporation 169.9 - 19,419 Industrial building at Fusionopolis Way/Ayer Rajah Dec-2011 Mar-2015 BT 16/2/13 P & T Consultants
Construction Corp
Avenue (Fusionopolis Phase 2A)

Oxley Blossom Pte Ltd RSP Architects


Erection of a 20-storey office building at 144
(Subsidiary of Oxley - - 4,755 Commercial Jul-2012 Sep-2014 ST 23/2/13 Planners & Boustead Projects
Robinson Road (Robinson Square)
Holdings) Engineers

Sparkland Holdings Pte Erection of 97 units of 2-storey terrace houses at


BT 28/7/12 & ADDP Architects Tiong Seng
Ltd (City Developments & - - 29,140 Residential Serangoon Garden Way Dec-2012 Jun-2015
ST 1/3/13 LLP Contractors
Hong Realty JV) (Haus@Serangoon Garden)

a) Erection of 5 Regional Sports Centres in phases


over the next 20 years with the first one at
Tampines Town Hub BT & ST
Singapore Sports Council - - - Recreational - - - -
b) Redevelopment of existing sports centres in 16/3/13
various HDB estates into Town Sports and
Recreation Centres

Page 82
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT&ST
Changi Airport Group Civil Construction of the third runway at Changi 18/7/12; ST
- - - - 2020 - -
(Singapore) Pte Ltd Engineering Airport 14/3/13 &
18/3/13

Hong Realty (Private)


Erection of 12 blocks of 11 to 13-storey
Limited [Hong Realty, City
- - 86,677 Residential condominium comprising 912 units 2013 2017 BT 19/3/13 Architects 61 -
Developments & Hong
at Pasir Ris Grove (d'Nest)
Leong Holdings JV]

Upgrading & redevelopment of the existing


Downtown East at Pasir Ris Close comprising
Phase 1 - Expansion of the Costa Sands Resort &
Wild Wild Wet water theme park; BT/ST
NTUC Club 200 - - Recreational Phase 2 - Addition of a meeting & convention 3Q 2013 2017 20/7/12 & DP Architects -
facility involving a multi-purpose hall and an 19/3/13
amphitheatre;
Phase 3 - Upgrading of the retail, dining &
entertainment areas

Evonik Methionine SEA 250 Million Construction of Evonik's 3rd plant at Jurong ST 14/11/12
- - Industrial - - - -
Pte Ltd Euro Island & BT 19/3/13

Erection of 1 block of 22-storey & 2 blocks of


23-storey condominium comprising 546 units
Sim Lian JV (BP) Pte Ltd &
Residential & with a 4-storey podium comprising basement BT 21/3/13 & Design Link Sim Lian
Sim Lian (BP Retail) Pte - - 62,176 Jan-2013 May-2016
Commercial carparks, retail space & upper levels carparks ST 22/3/13 Architects Construction Co
Ltd
integrated with a bus interchange at Petir
Road/Jelebu Road (Hillion Residences)

Page 83
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Expansion of the National Skin Centre with a new


annex building including construction of a
Ministry of Health - - - Institutional - - ST 23/3/13 - -
temporary carpark & upgrading of the existing
skin centre at Mandalay Road

Reconstruction of the Grace Assembly of God


Grace Assembly of God - - - Institutional 2013 - ST 25/3/13 - -
church at 355 Tanglin Road

Mount V Development Pte


Ltd (Hong Leong Erection of 8 blocks of 18-storey & 1 block of
ST 23/3/13 & ADDP Architects Lian Beng
Holdings, City 220 - 72,838 Residential 19-storey condominium comprising 868 units at Mar-2013 May-2016
BT 26/3/13 LLP Construction (1988)
Developments & TID Pte Mount Vernon Road (Bartley Ridge)
Ltd JV)

Newfort Alliance (Kismis)


Residential redevelopment on the site of Kismis BT & ST
Pte Ltd [linked to Newfort - - - Residential - - - -
Lodge at Lorong Kismis, off Toh Tuck Road 26/3/13
Realty Pte Ltd]

Building & contingency works at Kallang


Housing & Development BT & ST ADDP Architects Singapore Piling &
102.8 - 86,220 Residential Whampoa Contract 28B comprising 755 dwelling Mar-2013 Apr-2016
Board 26/3/13 LLP Civil Engineering
units (Tenteram Peak)

Page 84
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

CEL Property Investment


Redevelopment of San Centre into a 20-storey
Pte Ltd (Subsidiary of Chip - 2,668 - Commercial - - BT 27/3/13 - -
commercial building at Chin Swee Road
Eng Seng Corporation)

BT/ST
Erection of a 13-storey hotel tower perched atop
22/1/13; BT
CEL-Alexandra Pte Ltd of a 6-storey podium comprising 3-storey of retail
28/1/13, Keong Hong
(Subsidiary of Chip Eng - - 22,249 Commercial space & 3-storey of carparks at Alexandra Mar-2013 Mar-2015 DP Architects
20/2/13 & Construction
Seng Corporation) Road/Jalan Bukit Merah
19/3/13; ST
(Park Hotel Alexandra and Alexandra Central)
27/3/13

BT 9/2/13 &
BP-Ubi Industrial Pte Ltd
JTC tender
(Part of Boustead - 3,504 - Industrial Industrial development at Ubi Avenue 4 - - - -
reault
Singapore)
11/3/13

China Construction
HDB Building & contingency works at Bedok
Housing & Development ADDP Architects (South Pacific)
180 - 119,247 Residential Neighbourhood 3 Contract 20 comprising 1,058 Mar-2013 Mar-2018 ST 18/3/13
Board LLP Development Co
units (Fengshan Greenville)
Pte Ltd

HDB Building & contingency works at Punggol Surbana


Housing & Development Thong Huat
72.8 - 34,405 Residential West Contract 30 comprising 526 units Feb-2013 Jul-2015 ST 18/3/13 International
Board Brothers Pte Ltd
(Punggol Opal) Consultants Pte Ltd

Page 85
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

HDB Building & contingency works at Geylang Surbana


Housing & Development
33.8 - 25,163 Residential Contract 28 comprising 338 units Nov-2012 May-2015 ST 18/3/13 International Debenho Pte Ltd
Board
(GreenTops @ Sims Place) Consultants Pte Ltd

Erection of a 13-storey hotel tower perched atop


CEL-Alexandra Pte Ltd of a 6-storey podium comprising 3-storey of retail BT 16/8/12,
Keong Hong
(Subsidiary of Chip Eng - - 22,249 Commercial space & 3-storey of carparks at Alexandra Mar-2013 Mar-2015 20/2/13 & DP Architects
Construction
Seng Corporation) Road/Jalan Bukit Merah 19/3/13
(Park Hotel Alexandra)

Installation & operation of Close Circuit Phase 1 (2Q 2013);


Civil BT & ST
Land Transport Authority - - - Television Cameras (CCTVs) at 30 locations Phase 2 (4Q 2013); 2014 - -
Engineering 19/3/13
islandwide Phase 3 (1Q 2014)

Main Contract - Additions & alterations to an


GP Hotel Heritage Pte Ltd existing 2-storey conserved building & a
Buildtech
(Subsidiary of Global - - 6,950 Commercial single-storey conserved structure including Oct-2012 Dec-2013 ST 20/3/13 Team Design
Construction
Premium Hotels Limited) erection of a 6-storey hotel comprising 270 rooms
at 165 & 167 Tyrwhitt Road

Construction of a new infectious disease hospital


Ministry of Health - - 95,995 Institutional at Jalan Tan Tock Seng - 2018 ST 21/3/13 CPG Consultants -
(National Centre for Infectious Disease)

Page 86
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 3,898 Build-to-Order (BTO) flats at


Housing & Development Bukit Batok (SkyPeak @ Bukit Batok), BT & ST
- - - Residential - - - -
Board Punggol (Matilda Portico) and Sengkang 22/3/13
(Compassvale Cape & Compassvale Helm)

Redevelopment of The Pines Club into 2 blocks of


Oxley Gem Pte Ltd
8-storey hotel, 2 blocks of 2-storey commercial ST 6/9/12 &
(Subsidiary of Oxley - - - Commercial - - - -
buildings & 1 block of 4-storey clubhouse with 22/3/13
Holdings Limited)
basement at 30 Stevens Road

Additions & alterations to the existing row of


2-storey shophouses including a rear 5-storey
Commercial & extension with an attic comprising 31 units of Buildtech
Fragrance Realty Pte Ltd - - 6,168 Mar-2013 Mar-2015 ST 9/3/13 HUAY Architects
Residential shops/restaurants at 1st & 2nd storey and 18 Construction
residential units from 3rd to 5th storey at Pasir
Panjang Road (Icon @ Pasir Panjang)

Bayfront Realty Pte Ltd Erection of 11 blocks of 14/15/16-storey


(Fragrance Group Ltd & condominium comprising 582 residential units & ST 12/1/13 &
- - 39,196 Residential 2013 4Q 2015 SAA Architects -
World Class Land Pte Ltd 3 shop units at Tanah Merah Kechil Link 9/3/13
JV) (Urban Vista)

Erection of a 4-storey commercial building with 5


The Seletar Mall Pte Ltd BT&ST
basements comprising a cineplex, retail space & Kajima Overseas
(Singapore Press Holdings - - 26,371 Commercial Feb-2013 Oct-2014 22/8/12; DP Architects
carparks at Fernvale Road/Sengkang West Asia
& United Engineers JV) BT 11/3/13
Avenue (The Seletar Mall)

Page 87
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

317 (including Design & build of the second neodymium BT&ST


Foster Wheeler Asia
Lanxess Butyl Pte Ltd investment - - Industrial polybutadiene rubber (Nd-PBR) plant at Nov-2012 Sep-2014 12/9/12 & Steen Consultants
Pacific
cost) Tembusu Road/Tembusu Drive, Jurong Island 12/3/13

Phase 1 - Installation of 8km of noise barriers on


BT&ST
the plain line tracks along the eastern & western
Land Transport Authority - - - Building Others 2014 2016 25/1/13; - -
sections of the East-West Line and the Woodlands
ST 13/3/13
section of the North-South Line

Phase 2 - Installation of the remaining 12km of BT&ST


Land Transport Authority - - - Building Others noise barriers along selected stretches of elevated 2017 2020 25/1/13; - -
train tracks ST 13/3/13

Sim Lian JV (Vision) Pte BT & URA


Commercial development at Venture Avenue in
Ltd [Part of Sim Lian - 11,529 - Commercial - - tender result - -
Jurong East
Group] 13/3/13

Construction of an air logistics hub comprising a


4-storey ramp-up warehouse with automated
Keppel Logistics Pte Ltd - - - Industrial - early 2015 BT 13/3/13 - -
storage, tracking & handling systems at Tampines
Logistics Park

Page 88
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Construction of a 260-bed nursing home at Bishan ST 25/9/12 & RSP Architects


Ministry of Health - - - Institutional 4Q 2013 end 2014 -
Street 13 (Lions Home for the Elders) 14/3/13 Planner & Engineers

Civil Construction of 210km of cycling paths in 16 HDB


Land Transport Authority - - - - 2020 ST 14/3/13 - -
Engineering towns by 2020

National Environment Civil Development & construction of Phase 2 of the ST 12/6/12 &
- - - Jan-2014 1Q 2015 Jurong Consultants -
Agency Engineering Pulau Semakau landfill BT 13/3/13

Construction of a new waste-to-energy (WTE)


National Environment
- - - Industrial incineration plant to replace the Tuas Incineration - - BT 13/3/13 - -
Agency
Plant

Deep Tunnel Sewerage System (DTSS) Phase 2 -


Civil BT 13/3/13 &
Public Utilities Board 3,000 - - Construction of the 18km long underground 2016 2022 - -
Engineering ST 14/3/13
tunnel in the West of Singapore

Page 89
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT 13/3/13 &
Public Utilities Board - - - Industrial Construction of the Tuas Water Reclamation Plant - 2022 - -
ST 14/3/13

BT 27/2/13 &
Fragrance Group Limited - 11,607 - Commercial Food & Beverage development at Punggol Point - - URA tender - -
result 7/3/13

BT & ST RSP Architects


Erection of a 5-storey campus
Essec Business School 40 5,340 - Institutional 2013 Dec-2014 1/11/12; Planners and -
at Nepal Hill/One-North
27/2/13 Engineers

Civil Extension of the Singapore Botanic Gardens at


National Parks Board - - - 2013 2015 ST 4/3/13 - -
Engineering Tyersall Avenue (Learning Forest)

Erection of 6 blocks of 5-storey condominium


BT 1/2/12 & Singapore Piling &
BBR Kovan Pte Ltd - - 14,029 Residential comprising 140 units at Simon Lane Jul-2012 Sep-2014 Look Architects
5/3/13 Civil Engineering
(Bliss@Kovan)

Page 90
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Building and contingency works at Bukit Merah


Housing & Development Housing & Logistics
59.5 - 43,086 Residential Contract 19C & 19D comprising 418 dwelling Apr-2013 May-2016 ST 5/3/13
Board Development Board Construction
units

Fantasia (Novena) Pte Ltd


Residential redevelopment on the site of Ultra
[Subsidiary of Hong Kong - 4,228 - Residential - - BT 6/3/13 - -
Mansion at 4 Derbyshire Road
listed Fantasia Holdings]

Piling works for a block of 31-storey office tower


Far East Opus Pte Ltd (Far with an 8-storey podium of medical centre cum BT 20/11/12,
East Organization & Far - - - Commercial F&B/retail space and 2 basement carparks at Feb-2013 Aug-2013 7/12/12 & DP Architects Zap Piling
East Orchard Limited JV) Robinson Road/Cecil Street 7/3/13
(SBF Center)

Design & construction of a 5.2 kilometre


Jurong Island-Pioneer undersea cable tunnel
Civil
SP PowerAssets Limited - - - comprising Singapore's next-generation 400 KV 2013 2017/2018 BT 7/3/13 - -
Engineering
transmission cables and sub-stations at Jurong
Island & Pioneer Road

Erection of a 3-storey building, a 5-storey


Dulwich College building, a 1-storey building with 2 basements & ST 8/2/13 &
- - - Institutional Feb-2013 May-2014 DP Architects Singa Development
(Singapore) Pte Ltd a 2-storey administration building at Bukit Batok BT 22/2/13
West Avenue 8 (Dulwich College)

Page 91
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Phase 3 - Additions & alterations to Shaw Centre


ST 26/5/12;
Shaw Brothers Limited & (basement to 13th storey) & Shaw House Shimizu
- - 45,015 Commercial Nov-2012 Nov-2013 BT & ST DP Architects
Shaw House Pte Ltd (basement to 4th storey & 10th storey) at Scotts Corporation
22/2/13
Road/Orchard Road

Addition of two circulating fluidised bed (CFB)


boiler, a gas boiler, two steam turbines, waste
Tuas Power Ltd - - - Industrial - 2017 ST 23/2/13 - -
water treatment and desalination facilities at
Tembusu Sector, Jurong Island

Majlis Ugama Islam Construction of a new mosque at Jalan ST 9/3/12 &


- - - Insitutional 1Q 2015 2Q 2016 - -
Singapura (MUIS) Bahar/Jurong West Avenue 2 24/2/13

Majlis Ugama Islam Construction of a new mosque at Woodlands ST 9/3/12 &


- - - Insitutional 1Q 2014 2Q 2015 - -
Singapura (MUIS) Drive 17 24/2/13

Majlis Ugama Islam Construction of the Punggol Mosque at Punggol Formwerkz


17 to 19 - - Insitutional 3Q 2013 1Q 2015 ST 24/2/13 -
Singapura (MUIS) Field/Punggol Place Architects

Page 92
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Upgrading of 3 existing markets/hawker centres ST 10/1/13,


National Environment Yong Xing
11.5 - 9,478 Commercial at Block 6 Tanjong Pagar Plaza, Block 112 Jalan Mar-2013 Nov-2013 22/2/13 & Architects Team 3
Agency Construction
Bukit Merah & Block 44 Holland Drive 28/2/13

Erection of a 6-storey Pre-Employment Training


building for Republic Polytechnic and a 9-storey
Lian Soon
Republic Polytechnic 69.6 - 23,230 Institutional Singapore Institute of Technology (SIT) building Dec-2012 Jun-2014 ST 31/1/13 DP Architects
Construction
at Woodlands Avenue 9
(SIT - Republic Polytechnic)

NTUC Income Insurance Upgrading of the existing Eastpoint Mall Avid Architects Pte
- - 29,020 Commercial 2Q 2013 2014 ST 5/2/13 -
Co-Operative Ltd at 3 Simei Street 6 Ltd

BT&ST
Changi Airport Group Construction of Changi Airport's Terminal 4 on
600 - - Building Others 4Q 2013 2017 1/3/12; - -
(Singapore) Pte Ltd the site of the former Budget Terminal
2/3/12; 9/2/13

Construction of supporting infrastructure


Civil
Changi Airport Group comprising aircraft parking stands, ancillary BT & ST
680 - - Engineering & - 2017 - -
(Singapore) Pte Ltd buildings, road & drainage works and airport 9/2/2013
Building Others
systems for Changi Airport's Terminal 4

Page 93
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 8 blocks of 13-storey condominium


TG Master Pte Ltd (TG Surbana Lian Beng
comprising 410 units and 1 block of 3-storey BT 8/10/12 &
Development & Master 117 - 35,490 Residential Mar-2013 Nov-2015 International Construction (1988)
townhouses comprising 10 units at Miltonia 19/2/13
Contract Services JV) Consultants Pte Ltd Pte Ltd
Close/Yishun Avenue 1 (Skies Miltonia)

Erection of a 13-storey hotel tower perched atop


CEL-Alexandra Pte Ltd of a 6-storey podium comprising 3-storey of retail
BT 16/8/12 &
(Subsidiary of Chip Eng - - 22,249 Commercial space & 3-storey of carparks at Alexandra 2013 2015 DP Architects -
20/2/13
Seng Corporation) Road/Jalan Bukit Merah
(Park Hotel Alexandra)

Koh Brothers
Phase 2 - Improvement to Bukit Timah First
Civil CH2M Hill Building & Civil
Public Utilities Board 99.8 - - Diversion Canal Contract 2 Feb-2013 Feb-2016 BT 21/2/13
Engineering Singapore Engineering
(Bukit Timah Road to Holland Green)
Contractor

CEL Pasir Panjang Pte Ltd Erection of an 8-storey multiple-user light


CES Engineering &
(Subsidiary of Chip Eng - - 12,544 Industrial industrial building & a block of substation May-2012 Mar-2014 BT 22/2/13 AC Consortium
Construction
Seng Group) at 98 & 100 Pasir Panjang Road

Expansion of the existing hangar comprising


Jet Aviation Singapore - - - Building Others a 2-storey office & backshop space at Seletar 2013 1Q 2014 ST 22/1/13 - -
Aerospace Park

Page 94
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

AIMS AMP Capital 25 (including


Design & build of a 6-storey single-user industrial HA Architects Pte Boustead Projects
Property Management Pte investment - 18,853 Industrial Mar-2013 May-2014 BT 29/1/13
building at 103 Defu Lane 10 Ltd Pte Ltd
Ltd cost)

Intrepid Investments Pte


Ltd, Verwood Holdings Pte
Ltd & Hong Realty (Pte)
BT 6/2/13 &
Ltd [A consortium Residential development at Commonwealth
- 12,087 - Residential - - HDB tender - -
comprising Hong Leong Avenue
award 7/2/13
Holdings, City
Developments & Hong
Realty]

Koh Brothers Building & BT 4/1/13 &


Industrial development at Plot 30, Tuas South
Civil Engineering - 8,597 - Industrial - - JTC tender - -
Street 6
Contractor (Pte) Ltd result 1/2/13

BT 4/1/13 &
Industrial development at Plot 32, Tuas South
SH Design & Build Pte Ltd - 8,732 - Industrial - - JTC tender - -
Street 6
result 1/2/13

Erection of 13 blocks of 15-storey condominium


EL Development Place Architects and Evan Lim &
- - 67,493 Residential comprising 810 units at Sengkang Square Mar-2013 Jul-2016 ST 21/1/13
(Sengkang) Pte Ltd Design Company
(La Fiesta)

Page 95
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

BT 25/1/13 &
CEL Property Pte Ltd
Commercial & Mixed commercial and residential development HDB tender
(Subsidiary of Chip Eng - 8,858 - - - - -
Residential at Yishun Ring Road/Yishun Avenue 9 award
Seng Corporation)
31/1/13

BT 29/1/13 &
Erection of 9 blocks of 14/15-storey Executive 14/12/12; Keong Hong
Keong Hong Holdings Ltd Design Link
149.9 21,718 60,812 Residential Condominium at Sembawang 4Q 2013 - HDB tender Construction Pte
& JBE Holdings Pte Ltd JV Architects
Crescent/Sembawang Drive award Ltd
17/12/12

BT 30/1/13 &
MCL Land (Prestige) Pte
- 22,357 - Residential Residential development at Jurong West Street 41 - - URA tender - -
Ltd
result 31/1/13

Engineering, procurement & construction of the


300 petroleum & hydrocarbon storage and related Rotary Engineering
PB Tankers Ltd - - Industrial Jan-2013 Nov-2014 BT 1/2/13 -
(approximate) facilities at Pulau Busing Ltd
(Phase 6 Storage Tanks Development)

Ministry of Social and Construction of the Adult Disability Home at


13 - 5,400 Insitutional 2014 1Q 2016 ST 2/2/13 - -
Family Development Sembawang Walk

Page 96
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

ST 25/8/12,
Civil Construction of cycling paths at Pasir Ris, Yishun,
Land Transport Authority - - - 2Q 2013 4Q 2015 11/9/12 & - -
Engineering Taman Jurong, Changi-Simei & Bedok
4/2/13

Xin Ming Hua Pte Ltd


(Subsidiary of XMH 51 - 15,184 Industrial Industrial development at Tuas Bay Drive - - BT 5/2/13 - -
Holdings Ltd)

Refurbishment of Albert Court Village Hotel at


180 Albert Street, Changi Village Hotel at 1 BT & ST
Far East Hospitality Trust - - - Commercial 2013 - - -
Netheravon Road and Regency House at 121 7/2/13
Penang Road

Erection of a part 13/10-storey multiple light


Chiu Teng @ Kallang Pte Industrial & industrial building & an 18-storey office building ADDP Architects Chiu Teng
- - 42,822 Oct-2012 Oct-2014 BT 28/9/12
Ltd Commercial at Lavender Street LLP Enterprises
(CT Hub2)

Erection of a 9-storey multiple-user factory


building comprising 293 units with a 7-storey Hock Lian Seng
HLS Development Pte Ltd - - 53,549 Industrial Nov-2012 Jun-2014 BT 28/9/12 AC Consortium
ancillary building at Gambas Avenue/Gambas Infrastructure
Crescent (Ark@Gambas)

Page 97
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of a 9-storey multi-user industrial


Alexis Development Pte Buildtech
- - 19,382 Industrial building at 201 Henderson Road Oct-2012 Aug-2014 BT 28/9/12 Kyoob Architects
Ltd Construction
(Apex@Henderson)

Erection of a block of 8-storey ramp-up industrial


building comprising 238 factory units & 38
AMK Link Development Metaphor Design +
- - 68,882 Industrial warehouse units with an ancillary staff canteen May-2012 Oct-2013 BT 28/9/12 S&L City Builders
Pte Ltd Architecture
and 2 blocks of 3-storey terrace factory buildings
at Ang Mo Kio Street 62 (Link@AMK)

Civil Construction of Sengkang West Road from Yio Shan Young & Tuah Jin Choon Civil
Land Transport Authority 18.6 - - Aug-2011 Jan-2014 ST 15/10/12
Engineering Chu Kang Road to Tampines Expressway (TPE) Consultants Engineering

KTC Civil
Civil Construction of a road between Tampines Mott MacDonald
Land Transport Authority 26.4 - - Aug-2012 Feb-2015 ST 15/10/12 Enginering &
Engineering Expressway (TPE) & Yishun Avenue 6 Singapore
Construction

Civil Widening of Seletar Expressway (SLE) from


Land Transport Authority - - - - - ST 15/10/12 - -
Engineering Woodlands Avenue 2 to Upper Thomson Road

Page 98
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Construction of a new 5-storey building for Metta


Metta Welfare Association - - - Institutional - - ST 21/10/12 - -
School at Simei

Association for Persons Construction of a new campus for Delta Senior


- - - Institutional - - ST 21/10/12 - -
with Special Needs School at Choa Chu Kang Grove

Reconstruction of Robinson Towers with its


Superluck Properties Pte 200 (including Architects 61/Kohn
annex building & International Factors Building BT 28/7/11 &
Ltd (Subsidiary of Tuan development - 23,907 Commercial - 2016 Pedersen Fox -
into an office tower & a retail podium at 1/12/12
Sing Holdings) charges) Associates
Robinson Road/Market Street

Spottiswoode Erection of 1 block of 36-storey residential


Development Pte Ltd (Lian building comprising 183 units at Spottiswoode
- - 10,046 Residential 2013 2016 ST 12/1/13 Ong & Ong Pte Ltd -
Beng Group & Centurion Park Road
Properties JV) (Spottiswoode Suites)

Bayfront Realty Pte Ltd Erection of 11 blocks of condominium comprising


(Fragrance Group & World - - 39,196 Residential 582 units at Tanah Merah Kechil Link 2Q 2013 4Q 2015 ST 12/1/13 SAA Architects -
Class Land JV) (Urban Vista)

Page 99
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Link (THM) Greenleaf Pte Erection of a block of 5-storey apartment building


Ltd [Subsidiary of Link - - 3,676 Residential comprising 52 units at Pasir Panjang Road 2Q 2013 4Q 2014 ST 12/1/13 Universal Akitek -
(THM) Holding Pte Ltd] (SeaSuites)

Amgen Singapore Erection of a biologics plant at Tuas Biomedical BT & ST


246 - - Industrial mid 2013 2016 - -
Manufacturing Pte Ltd Park 18/1/13

Erection of 2 blocks of 20-storey & 28-storey


condominium comprising 320 units, 2 blocks
Boo Han Holdings Pte Ltd China Construction
of 3-storey terrace houses comprising 18 units & 1
(Subsidiary of Far East - - 35,455 Residential Jan-2013 Jul-2015 BT 21/1/13 RDC Architects (South Pacific)
block of 17-storey serviced apartment comprising
Organization) Development Co
116 units at West Coast Link/West Coast
Crescent (Seahill)

Design & build of 8 blocks of 16-storey


Quarry Bay Pte Ltd
condominium comprising 630 units with shops, Kim Seng Heng
(Frasers Centrepoint, Far ADDP Architects
- - 60,368 Residential basement carparks, landscape deck & communal Apr-2013 Jan-2016 BT 22/1/13 Engineering
East Organization & LLP
facilities at Tampines Avenue 10 Construction
Sekisui House JV)
(Q Bay Residences)

Better Sheltered Connectivity to Transport Nodes


Under the Walk2Ride Programme
a) Schools, healthcare facilities, public amenities,
commercial & residential developments within a
400-metre radius from all existing MRT stations
BT & ST
Land Transport Authority 330 - - Building Others will all be linked up via covered walkways. 2014 2018 - -
25/1/13
b) Similar connectivity for developments within a
200-metre radius from all existing LRT stations,
bus interchanges and 100 existing bus shelters.

Page 100
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Installation of 20km of noise barriers along BT & ST


Land Transport Authority 300 - - Building Others 2013 2020 - -
selected stretches of elevated train tracks 25/1/13

Installation of lifts at 6 pedestrian overhead BT & ST Chevalier Singapore


Land Transport Authority 1.3 - - Building Others Nov-2011 Nov-2013 -
bridges near MRT stations 25/1/13 Holdings Pte Ltd

Installation of 40 lifts at pedestrian overhead BT & ST


Land Transport Authority 60 - - Building Others 2014 2018 - -
bridges at various locations 25/1/13

Construction of a 3-storey Family Entertainment


Sentosa Development Centre for an indoor children theme park with ST 6/6/12 &
90 - 11,500 Recreational mid 2013 end 2014 CPG Consultants -
Corporation KidZania Singapore as the sole tenant at Sentosa's 25/1/13
Palawan Beach

CS Amber Development Redevelopment of the site of Amber Towers to a


ST 29/10/12 A.M. Associates
Pte Ltd (China Sonangol - - 13,439 Residential condominium comprising 109 units at Amber 4Q 2013 2Q 2016 -
& 28/1/13 (Singapore)
Land & OKH Holdings JV) Road/Tanjong Katong Road (Amber Skye)

Page 101
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Capital Development Pte BT 4/1/13 &


Ltd and ZACD - 27,400 - Industrial Industrial development at Buroh Street - - JTC tender - -
Investments Pte Ltd result 29/1/13

Bohai Investments
BT 30/1/13 &
(Sengkang) Pte Ltd & Industrial development off Woodlands Avenue
- 10,705 - Industrial - - JTC tender - -
Punggol Drive Investments 10
result 29/1/13
Pte Ltd

Erection of 3,346 build-to-order (BTO) flats at


Choa Chu Kang Avenue 7 (Keat Hong Colours),
Ang Mo Kio Street 21 (Kebun Baru Court), Upper
Housing & Development BT & ST
- - - Residential Serangoon (Hougang ParkEdge), Lorong Limau - - - -
Board 30/1/13
(Whampoa Dew), Yishun Avenue 1 (Oleander
Breeze @ Yishun) & Tampines Avenue 8
(Tampines GreenForest)

Phase 3 Expansion of the INSEAD's Singapore


RSP Architects
campus comprising a 6-storey Leadership Lend Lease
INSEAD 50 - 10,500 Institutional Mar-2013 Oct-2014 BT 9/11/12 Planners &
Development Centre and additions & alterations Singapore
Engineers
to its existing building at Ayer Rajah Avenue

Implementation of Phase 2 of the Expressway ST Electronics


Civil BT 8/1/13 &
Land Transport Authority 34.5 - - Monitoring & Advisory System (Emas) on major Nov-2012 May-2015 - (Info-Comm
Engineering ST 29/10/12
arterial roads Systems) Pte Ltd

Page 102
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Pinehill Investments Pte


BT 9/1/13 &
Ltd [Subsidiary of Residential development at Ang Mo Kio Avenue
- 18,482 - Residential - - URA tender - -
Wheelock Properties 2
result 9/1/13
(Singapore) Ltd]

Sherwood Development Erection of 9 blocks of 10/11/12-storey


Pte Ltd (Subsidiary of - - 51,011 Residential condominium at New Upper Changi 4Q 2013 3Q 2016 BT 24/1/13 P & T Consultant -
Keppel Land) Road/Bedok Road/Bedok Rise

Keppel Bay Pte Ltd


Condominium development at Keppel Bay
(Subsidiary of Keppel - - 47,380 Residential 2014 2017 BT 24/1/13 DCA Architects -
Drive/Telok Blangah Road
Land)

Expansion of the Singapore Boys' Home


Ministry of Social and comprising 4 residential blocks, a 6-storey
40 - - Institutional 2015 2017 ST 19/10/12 - -
Family Development learning centre & an administration block at
Jurong West Street 25

Cleorodendrum Land Pte


Residential development at Upper Serangoon ST 1/5/12 &
Ltd (Subsidiary of Tuan - - 8,664 Residential - - MKPL Architects -
Road/Pheng Geck Avenue (Sennett Residence) BT 1/11/12
Sing Holdings)

Page 103
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Shelford Properties Pte Ltd Residential redevelopment on the site of Serene


ST 1/5/12 &
(Subsidiary of Tuan Sing - - 6,361 Residential House at 5 Jalan Serene - - SCDA Architects -
BT 1/11/12
Holdings) (Cluny Park Residence)

Erection of the Tampines Town Hub comprising a


People's Association - - 121,600 Recreational mega community club & a HomeTeam clubhouse 2013 2016 ST 5/12/12 DP Architects -
at 25 Tampines Street 82

1,300
(including
Erection of light & general industry factories at
Housing & Development construction, BT & ST
- - Industrial Defu Industrial Estate (Defu Industrial City) 2015 2017 - -
Board land & 6/12/12
infrastructure
cost)

Erection of an amenities centre comprising F&B


Housing & Development outlets, convenience stores, medical clinics & BT & ST
- - - Commercial - - - -
Board childcare centres at Defu Industrial Estate 6/12/12
(Defu City Centre)

Housing & Development Construction of food industry factories at Bedok BT & ST


- - - Industrial 2015 2017 - -
Board North Avenue 4 (Bedok Food City) 6/12/12

Page 104
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Erection of 1 block of 35-storey office tower with


Far East Opus Pte Ltd (Far
an 11-storey podium comprising medical suites, BT 20/11/12
East Organization & Far - - 32,839 Commercial - - DP Architects -
food-and-beverage outlets & multi-storey carpark & 7/12/12
East Orchard Limited JV)
at Robinson Road/Cecil Street (SBF Center)

RH Rochor Pte Ltd


Residential redevelopment at 7, 9, 11, 13 & 15
(Subsidiary of Roxy-Pacific - - - Residential - - ST 4/1/13 - -
Wilkie Terrace
Holdings)

Freshview Developments
Pte Ltd (City Erection of 2 blocks of 43-storey condominium
Developments, Hong - - 52,020 Residential comprising 508 units at Alexandra View 2013 2016 BT 8/1/13 SCDA Architects -
Leong Holdings & Hong (Echelon)
Realty JV)

Erection of a 7-storey Lee Kong Chian Natural


National University of History Museum with a basement and additions Expand
38.9 - 8,536 Insitutional Oct-2012 Apr-2014 ST 12/1/13 W Architects
Singapore & alterations to the existing NUS museum annex Construction
& an adjacent plaza at Kent Ridge Road

Construction of a new Neighbourhood Police


Singapore Police Force - - - Insitutional end 2013 end 2015 ST 13/1/13 CPG Consultants -
Centre/Divisional HQ at Woodlands Avenue 3

Page 105
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Flamegold Pte Ltd Residential redevelopment of St Patrick's Garden


BT 16/1/13 & Consortium 168
(Subsidiary of UOL Group - - 17,892 Residential into 9 blocks of 5-storey condominium at St 2013 - -
16/12/11 Architects
Limited) Patrick's Road

The Ascott Ltd & $900 m to


CapitaLand Residential $1 billion Redevelopment of Somerset Grand Cairnhill into BT & ST RSP Architects
Commercial &
Singapore Pte Ltd (total - 43,332 a 20-storey serviced residence & a 30-storey 2013 2016 10/7/12; ST Planners & -
Residential
(Subsidiaries of redevelopment high-end residence at Cairnhill Road 2/10/12 Engineers
CapitaLand Limited) cost)

Civil Upgrading works at Choa Chu Kang interchange


Land Transport Authority - - - - - ST 1/11/12 - -
Engineering rail station

Novartis Singapore US $500


Construction of a new biotechnology facility at BT & ST
Pharmaceutical (investment - - Industrial - - - -
Tuas 1/11/12
Manufacturing Pte Ltd cost)

Backfilling of the south end reservoir to provide


Changi Airport Group Civil land parcel for airport development including
- - - 2Q 2013 2014 ST 7/1/13 - -
(Singapore) Pte Ltd Engineering improvement to the drainage system at Singapore
Changi Airport

Page 106
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Piling & earthworks for erection of 1 block of


YTL Westwood Properties
25-storey condominium comprising 77 units on YTL Construction
Pte Ltd (Subsidiary of YTL - - 17,791 Residential Aug-2012 May-2013 BT 9/1/13 DP Architects
the former Westwood Apartments site at Orchard (S) Pte Ltd
Land & Development Bhd)
Boulevard

BT 9/1/13 &
Industrial development at Plot 8,
T. M. Transport Pte Ltd - 3,036 - Industrial - - JTC tender - -
Tuas South Street 8
result 8/1/13

BT 9/1/13 &
Industrial development at Plot 18, Tuas South
LNT Coating Pte Ltd - 4,527 - Industrial - - JTC tender - -
Street 8
result 8/1/13

Upgrading of Tanjong Pagar Plaza Market &


National Environment
- - - Commercial Food Centre under the Hawker Centres 1Q 2013 end 2013 ST 10/1/13 Architects Team 3 -
Agency
Upgrading Programme (HUP)

Aston Properties Pte Ltd Erection of 2 blocks of 24-storey condominium Hyundai


Axis Architects
(Subsidiary of City - - 36,306 Residential comprising 174 units on the former Lucky Tower Jun-2011 Jan-2014 ST 10/1/13 Engineering &
Planners
Developments) site at 57 Grange Road Construction Co

Page 107
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

Menlo Worldwide
US $100m
Logistics Pte Ltd Construction of 2 new warehouse facilities in the BT & ST
(investment - - Industrial - 2016 - -
(Subsidiary of New York- western part of Singapore 10/1/13
cost)
listed Con-way Inc)

Ley Choon
Changi Airport Group Civil Rehabilitation works to aircraft parking stands at
15.3 - - Oct-2012 Dec-2014 BT 7/11/12 - Constructions and
(Singapore) Pte Ltd Engineering Singapore Changi Airport
Engineering Pte Ltd

Chin Kuan
Engineering &
Watermain repairs & other contract work for
Civil Contractors Pte Ltd
Public Utilities Board 9 - - Network Services (East) Division Oct-2012 Oct-2014 BT 7/11/12 -
Engineering (Subsidiary of Ley
for Year 2012-2014
Choon Group
Holdings)

Phase 3 Expansion of the INSEAD's Singapore


INSEAD 50 - 10,000 Institutional campus comprising a 6-storey Leadership - - BT 9/11/12 - -
Development Centre at Ayer Rajah Avenue

Tampines EC Pte Ltd


(Consortium comprising Erection of 9 blocks of 13/14/15-storey Executive BT & ST Surbana
Jia Yi Construction
Amara Holdings, Kay Lim - - 63,912 Residential Condominium comprising 514 units at Tampines Nov-2012 Nov-2015 22/11/12; ST International
Pte Ltd
Holdings & SingXpress Central 7 (CityLife@Tampines) 24/11/12 Consultants
Land)

Page 108
Construction Project Listing*
(Last Updated on 20/12/2013)
*Project details provided may subject to subsequent changes by owner/developer.
Note: Words highlighted in blue refer to the latest updates for projects published before.

Owner/Developer Estimated Site Area Gross Floor Development Description Of Project Date Of Date of Source Consultant Contractor
Construction (sq m) Area Type Commencement Completion
Cost ($million) (sq m)

95 (total ST 15/12/12;
Big Box Pte Ltd (Subsidiary Erection of an 8-storey warehouse cum retail Jian Huang
investment - - Commercial Jun-2012 Jan-2014 BT & ST Jurong Consultants
of TT International) building at Jurong East Street 11 (Big Box) Construction Co
cost) 5/1/12

Batch 8 Estate Upgrading Programme (EUP) for


Goldhill, Mayflower Gardens, Yio Chu Kang
Ministry of National Civil BT & ST
29 - - Gardens, Cashew, Hazel Park Terrace, Greenleaf, - 2016 - -
Development Engineering 27/12/12
Bartley, Carmichael, Haig Road and Limau
Estates

Surbana
Housing & Development Building works at Kallang Whampoa Contract Singapore Piling &
108 - - Residential Dec-2012 Nov-2015 BT 20/12/12 International
Board 23B comprising 808 units Civil Engineering
Consultants

Surbana
Housing & Development Building works at Sengkang Neighbourhood 2
74.9 - - Residential Dec-2012 Apr-2015 BT 20/12/12 International Singa Development
Board Contract 43B comprising 474 units
Consultants

Page 109

You might also like