Mine Pit Service Activity on Week 5, December 2017


Out Pit Service :
1. Construct Settling Pond- at Void P8500 Bk.1 NB.

Timber Management :
1. Land Clearing P4000 Bk34 SB2
2. Land Clearing P4200 Bk.14 SB2
3. Land Clearing P7000 Bk.14 SB2 ( Plan Channel )- wait grapple
4. Continue hauling log from TPK Hutan Bk.4 SB1 to Port Bunyut

Mine Dewatering :
1. MF290-05 Standby Ready at P3000 SB1 – MAP
2. MF290-04 and MF420-07 Support PT. BEK-Tenaik
3. MF385-02 & MF385-03 (breakdown)
4. MF420-06, MF420-08 and MF420-09 at Warehouse Dewatering- Keladi Office (Parking)
PROBLEM WEEK # 5 December 2017

• OUT PIT SERVICE


1. 2x Excavator breakdown ( engine) since date 22 Dec 2017 at Void P8500 Bk1A NB
2. Plan Settling Pond Void P8500 Bk.1A base mud/ soft material.
3. Predominantly area sand material.

• TIMBER MANAGEMENT
1. 1x Bulldozer 309 breakdown since date 21 December at P4000 Bk.34 SB2
2. Stop activity LC P7000 Bk.14 SB2 date 24 Dec 2017 ; 08.30 wita by civilian ( Mr.Seludin )
3. Steep condition at P4000 Bk34 SB2 so lately to progress LC
4. Lack of support units for LC activities because use for logging activity (2 x excavator/grapple)

• DEWATERING

1. MF385-02 Breakdown (plan overhaul) and MF385-03 Breakdown (repair of the pontoon)

4
PLAN AREA -SETTLING POND VOID P8500 BK1A NB

Void P3000 Bk.1 A


AREA SETTLING POND VOID P8500 BK1A NB

Construct Levee Settling Pond

6
Cut area
Construct Levee Settling Pond

7
SUMMARY PLAN LAND CLEARING DECEMBER 2017
BOUNDARY LC -P.4000 BK34 SB2
PRIORITY- 2
PROGRESS LC -PIT 4000 BK34 SB 2 PAMA

Activity collect Log & grub

PROBLEM

Remain area for LC ( swamp )

Activity collect Log & grub


BOUNDARY LC- P.7000 BK14 SB2
PROGRESS LC P.7000 BK.14 SB2 ( PLAN CHANNEL )

LC completion, activity loading grub not yet

12
BOUNDARY LC P4200 BK.14 SB2

13
PROGRESS LC P4200 BK.14 SB2

Activity LC plan access & levee

14
Logging activity TPK Antara to Log yard

Logging activity completed


on December 23, 2017 with
an estimated 1800 cubic
meters.
Update condition of pump units

MF290-05

MF385-02

1. MF420-06,08, and 09 parking


at MPS warehouse Keladi

2. MF290-04 and MF420-07


support BEK at Tenaik site

3. MF290-05 standby ready at


P3000 SB1 MAP

4. MF385-03 breakdown >>Plan


overhaul

5. MF385-02 waiting pontoon


install