List of unfinished work or unmatched item according to DRWG and specifications before Hydro- test.
4)Type of Supports :
Spring support, Hanger support, Dummy support, Shoe, Anchor, Guide and Pick up.
5) Check valve: Designed to permit flow of liquid or gas in a one direction and close if flow reverses.
5) Steam Tracing: To prevent fluid from congealing, forming hydrates, condensing, interfering with operation or
causing any damage to piping, equipment and instrument.
6) Vents: Are needed to let gas usually air in and out of service. Basically to remove air pockets from the line.
h) Pick up support - a support resting small diameter pipe using large diameter pipe instead of steel structure.
b) What is the minimum sized piping that can be installed on pipe racks (1”)
9)How many threads can be visible after seal welding threaded joints?
10) What is the gap requirement for socket welds for new construction?
12) Clearances:
MANZARUL KHAN
PIPING QUESTIONARY
freedom of piping movement. Alternatively, flush grind and NDT can be allowed as long as weld location will not
restrict piping movement
13) Drip legs: Often made from pipe and fittings, the drip leg is an inexpensive means of collecting condensate.
Removal of condensates from steam lines.
14) Piping and Instrument diagram: This drawing is commonly referred to as the P & ID. Its object is to indicate all
process and service lines, instrument and controls, equipment and data necessary for the design group. The process
flow diagram is the primary source of information for developing the P&ID’S.
A mandatory item in the quality plan that guides and assures quality in a Specific type of work in basic sequence of
QC activity steps.
A document that details the specific steps needed to fulfill the QC activity in the ITP.
A specification is a guide line to assure that minimum Quality standards are met.
19) What types of inspection action points are found in the ITP?
20) What are the differences between the 4 types of inspection points?
Piping and instrument diagram will show the piping layout and detailed notes relating to piping and instrumentation.
Safety Instruction Sheet that gives full design details related to a piping system or Line.
ICS1P3 = 150# class, Carbon Steel, 1/16” CA, General hydro carbon.
A detailed piping system / line drawing with reference to construction and material Requirements
MANZARUL KHAN
PIPING QUESTIONARY
27) What things are found in a piping isometric drawing?
Line conditions, references to drawings, materials of construction, elevations, Orientation, piping and drawing details
and notes, revision control and approval Status.
Process Industry Practice details requirements for fabrication an Industry Practice. These are often the basis for SA
standards.
a) How do you verify the material? And mention several items to check.
Mill Certificate, heat number, color coding and PMI, schedule, rating, Carbon equivalent
d) What are the tolerances for physical piping straightness and defects?
Check the ASTM or API piping specification.
Check the Gasket material as per the drawing and specification, size, rating and visual Inspection of surface
damages.
They are located at flanged connections to facilitate maintenance and removal of flange and
Flush Grinding of butt welds of the orifice flange inside and seal welding of orifice tapping Pipes.
35) What are the NDT methods are required during orifice flange installations?
MANZARUL KHAN
PIPING QUESTIONARY
36) Check list for Reinstatement:
# Check that correct bolts and gaskets are installed at all reinstated joints completed and recorded.
# Check that all process blinds and spades have been correctly installed as indicated on the
P & ID.
# Check that correct valves have been installed in the correct ‘Flow’ position.
# Check that specified block valves have locking devices correctly installed.
# Check that all valves are functioning properly and that spindle has been coated with copa-slip
# Check that all pump suction strainers have been correctly installed.
# Check that correct flow through filters, and strainers, traps, check valves and globe valves.
5) Ensure all line listed in test package are identified and test pressure is correct as per LDT.
1) Marked up P&ID and isometric drawings showing the location and type of pipe supports, the boundaries of the test,
valve position and the location of Vents, drains, temporary blinds (size and thickness), the water fill point And
pressure gauges.
39)THE CHECK LIST FOR PIPING WORK COMPLETION NEEDS TO BE CONFIRMED BEFORE THE
MANZARUL KHAN
PIPING QUESTIONARY
1) Piping should be Correct Dimension, Location and Orientation.
2) Welding Completed.
3) NDE Completed.
4) PWHT and Hardness Test Completed.
5) Valve, in line item and line Equipment Completed.
6) Support and Hanger installation Completed.
7) Material Thickness Verification / Color Code
8) P&ID Walk through in accordance with Isometric drawings.
9) All instruments are disconnected or not.
40) BEFORE THE TESTING COMMENCES SOME OF THE GENERAL REQUIREMENT TO BE CHECK AND
REVIEW.
1) Test Pressure to be used shall not less than 1.5 times the design pressure.
2) Water to be used shall be fresh water and free from sediments. The Maximum Chloride
content shall be less than 30 ppm.
3) For Pneumatic testing, the test medium shall be Air or any other non-flammable gas and the test pressure shall
be 110 % of the design pressure. For pneumatic test, the soap solution spray shall be used during leakage detection.
4) The Temporary supports are to be examined to ensure that they will adequately support the line during testing.
6) After the test, the system was drained to minimize standing water in the line. Air blowing to be performed to
remove the remaining water.
a) Shell Test.
b) Back Seat Test.
c) Low Pressure Closure Test.
d) High Pressure Closure Test.
e) Visual Examination of Castings.
44) ACCEPTANCE CRITERIA FOR INSPECTION OF 6” DIA, SCH. 40 BUTT WELD JOINT:
a) Bevel Angle ………………………. 37.5° (tolerance ± 2.5°)
MANZARUL KHAN
PIPING QUESTIONARY
45) TWO REASONS FOR HAVING VENT HOLE ON REINFORCING PAD OF BRANCH
CONNECTION :
fuel gas / oil sea water (water containing Chlorine) Stainless Steel No Iron (Fe)
CS flanges : A105 – forgings / A 216 Gr. WCB – castings / A 515 Gr.70 – Plates.
SS flanges : A 182 Gr.F304 - forgings / A 351 Gr.CF3 - castings / A 240 Gr.304 – Plates.
LTCS flanges : A 350 Gr. LF3 – forgings / A 352 Gr. LC3 – castings / A 203 Gr.E – Plates.
AS flanges : A 182 Gr.F11 CL 2 - forgings / A 217 Gr.WCB - castings / A 387 Gr.11 CL.2 – Plates.
SS 321 as the same chemical composition of SS 304 but in addition to that it contains Ti which is a stabilizer
51) What are the 3 precautions that has to be taken during the welding of Orifice flanges ?
1) Welding nearer to the flanges shall be flush ground to avoid any turbulence.
3) No bends shall be available nearer to the flange it shall be straight for a distance of atleast 5 times the Diameter of
the pipe on the Up stream.
MANZARUL KHAN
PIPING QUESTIONARY
YERP-SAES-L-100 APPLICABLE CODES AND STANDARDS FOR PRESSURE PIPING SYSTEMS
MANZARUL KHAN