B. Analisa Perhitungan
EQUATION :
AASHTO 1993
(Dari Tabel Analisa Structural Number (SN) Flexible Pavement, maka didapat :
AC - WC 3 cm
AC - BC 0 cm
BASE 15 cm
38 cm
SUBBASE 20 cm
993 hal. I-62)
TABEL PERHITUNGAN
1 2 3 4 5
3,760 3.58 1.00 -0.513 0.301
Standar Normal Deviasi (Zr) -1.28 1.50 -0.513 0.398
Standar Deviasi (So) 0.40 2.00 -0.513 0.477
Initial Serviceability Index (Pi) 4.50 2.50 -0.513 0.544
Terminal serviceability Index (pt) 2.00 3.00 -0.513 0.602
Serviceability Loss (ΔPSI) 2.50 3.50 -0.513 0.653
Nilai CBR (%) 6% 4.00 -0.513 0.699
Modulus Resilient (Mr)/Psi 9000.00 4.50 -0.513 0.740
Modulus of Subgrade Reaction (k)/Pci 463.92 5.00 -0.513 0.778
Koofesien Draenase (Cd) 1.13 5.50 -0.513 0.813
6.00 -0.513 0.845
Tebal plat rigid pavement (D), In. 6.50 -0.513 0.875
Tebal plat rigid pavement (D), cm. 7.00 -0.513 0.903
Cek equation 7.50 -0.513 0.929
kg/cm2 ke Psi 8.00 -0.513 0.954
14.22 8.50 -0.513 0.978
9.00 -0.513 1.000
9.50 -0.513 1.021
10.00 -0.513 1.041
KETERANGAN :
X 3.50
3.00
X=
1 inch = 2.54 cm
HITUNGAN FLEXIBLE PAVEMENT
6 7 8 9 10 11 12
2.618 0.926 36.50 29.969 -0.001 3.95 1.104
3.525 0.926 116.23 9.413 -0.003 3.95 1.104
4.266 0.926 299.41 3.654 -0.008 3.95 1.104
4.892 0.926 666.37 1.642 -0.016 3.95 1.104
5.435 0.926 1332.57 0.821 -0.027 3.95 1.104
5.914 0.926 2455.69 0.445 -0.040 3.95 1.104
6.342 0.926 4242.82 0.258 -0.051 3.95 1.104
6.730 0.926 6957.97 0.157 -0.060 3.95 1.104
7.083 0.926 10929.62 0.100 -0.067 3.95 1.104
7.409 0.926 16558.47 0.066 -0.072 3.95 1.104
7.710 0.926 24325.33 0.045 -0.075 3.95 1.104
7.991 0.926 34799.10 0.031 -0.077 3.95 1.104
8.253 0.926 48644.87 0.022 -0.079 3.95 1.104
8.499 0.926 66632.21 0.016 -0.080 3.95 1.104
8.732 0.926 89643.46 0.012 -0.081 3.95 1.104
8.951 0.926 118682.18 0.009 -0.082 3.95 1.104
9.160 0.926 154881.66 0.007 -0.082 3.95 1.104
9.358 0.926 199513.58 0.005 -0.082 3.95 1.104
9.547 0.926 253996.68 0.004 -0.083 3.95 1.104
0.40
14.00 Cm
9.00 Cm
TOTAL = (V+Q+R+S)
13
3.21
4.11
4.85
5.47
6.00
6.47
6.88
7.26
7.61
7.93
8.23
8.50
8.76
9.01
9.24
9.46
9.67
9.87
10.06
PERHITUNGAN STRUKTUR KOLOM DAN BALOK
Spesifikasi DATA :
h Tinggi Balok = 400 mm fc' = 1869000 kg/m2 18.69
b Lebar Balok = 250 mm fy BJTD = 24022600 kg/m2 240.23
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2 240
Diameter Tulangan Utama = 13 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 9.7 mm
Tinggi Efektif
rumus:
d = 333.8
= 0.8
30673613.91
= 1.38
22284488
m = 240.226 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 3.2387 )
240.23 = 0.01348
= 0.98652 0.006764
akar = 0.00575
0.00575
Pmin = 0.0058
Pmax = 0.0403
a = = 127478.32916 = 32.10
3971.625
Mn = = 36945518.6605
Penulangan Geser
Vn = = 95363.33375 N
Vs = Vn - Vc
= 95363.33375 - 1248.8716907673 = 94114.4620592327 N
9.7 =
= 73.86065
Av = 73.861 x 2= 147.7213
= 0.8
61347228
= 2.75
22284488
m = 240.23 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 6.4774 )
240.23 = 0.02696
= 0.97304 0.013574
akar = 0.01154
0.01154
Pmax = 0.0403
Di gunakan tulanagn 2 D 22 2 D 13
a = = 246282.09746 = 62.01
3971.625
Mn = = 70036535.6104
Penulangan Geser
Vu = 76290.667
1559680.5
Vc = = 1248.8716907673 208.1452817946
Vn = = 95363.33375 N
Vs = Vn - Vc
= 95363.33375 - 208.1452817946 = 95155.1884682054 N
9.7 =
= 73.86065
Av = 73.861 x 2= 147.7213
76290.667
484.01
mm
962.84
mm
PERHITUNGAN STRUKTUR KOLOM DAN BALOK
Spesifikasi DATA :
h Tinggi Balok = 400 mm fc' = 1869000 kg/m2 18.69
b Lebar Balok = 250 mm fy BJTD = 24022600 kg/m2 240.23
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2 240
Diameter Tulangan Utama = 16 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 9.7 mm
Tinggi Efektif
rumus:
d = 332.3
= 0.8
19606008.95
= 0.89
22084658
m = 240.226 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 2.0889 )
240.23 = 0.00870
= 0.99130 0.004357
akar = 0.00370
0.00370
Pmin = 0.0058
Pmax = 0.0403
= 132.665 + 0 = 132.665
a = = 127478.32916 = 32.10
3971.625
Mn = = 36605872.3158
Penulangan Geser
Vn = = 62316.70375 N
Vs = Vn - Vc
= 62316.70375 - 1246.0624984326 = 61070.6412515674 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
= 0.8
39212018
= 1.78
22084658
m = 240.23 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 4.1777 )
240.23 = 0.01739
= 0.98261 0.008734
akar = 0.00742
0.00742
Pmax = 0.0403
Di gunakan tulanagn 2 D 16 2 D 13
a = = 160290.7985 = 40.36
3971.625
Mn = = 46240420.8426
Penulangan Geser
Vu = 49853.363
1552671.75
Vc = = 1246.0624984326 207.6770830721
Vn = = 62316.70375 N
Vs = Vn - Vc
= 62316.70375 - 207.6770830721 = 62109.0266669279 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
49853.363
481.84
mm
616.71
mm
PERHITUNGAN STRUKTUR KOLOM DAN BALOK
Spesifikasi DATA :
h Tinggi Balok = 350 mm fc' = 1869000 kg/m2 18.69
b Lebar Balok = 200 mm fy BJTD = 24022600 kg/m2 240.23
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2 240
Diameter Tulangan Utama = 13 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 7.7 mm
Tinggi Efektif
rumus:
d = 285.8
= 0.8
17015193.21
= 1.30
13069062.4
m = 240.226 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 3.0634 )
240.23 = 0.01275
= 0.98725 0.006397
akar = 0.00544
0.00544
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn 3 D 13
= 132.665
a = = 95608.74687 = 30.09
3177.3
Mn = = 21563326.1827
Penulangan Geser
Vn = = 65815.69875 N
Vs = Vn - Vc
= 65815.69875 - 1033.5958591248 = 64782.1028908752 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
= 0.8
34030386
= 2.60
13069062.4
m = 240.23 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 6.1268 )
240.23 = 0.02550
= 0.97450 0.012835
akar = 0.01091
0.01091
Pmax = 0.0403
Di gunakan tulanagn 4 D 16
= 200.96
a = = 193103.26784 = 60.78
3177.3
Mn = = 45955978.8691
Penulangan Geser
Vu = 52652.559
1068320.4
Vc = = 1033.5958591248 172.2659765208
Vn = = 65815.69875 N
Vs = Vn - Vc
= 65815.69875 - 172.2659765208 = 65643.4327734792 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
52652.559
331.53
mm
749.00
mm
PERHITUNGAN STRUKTUR KOLOM DAN BALOK
Spesifikasi DATA :
h Tinggi Balok = 300 mm fc' = 1869000 kg/m2 18.69
b Lebar Balok = 200 mm fy BJTD = 24022600 kg/m2 240.23
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2 240
Diameter Tulangan Utama = 16 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 7.7 mm
Tinggi Efektif
rumus:
d = 234.3
= 0.8
13731008.89
= 1.56
8783438.4
m = 240.226 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 3.6783 )
240.23 = 0.01531
= 0.98469 0.007685
akar = 0.00653
0.00653
Pmax = 0.0403
Di gunakan tulanagn 3 D 13
= 132.665
a = = 95608.74687 = 30.09
3177.3
Mn = = 16123547.1957
Penulangan Geser
Vn = = 41760.6875 N
Vs = Vn - Vc
= 41760.6875 - 935.8490262858 = 40824.8384737142 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
= 0.8
27462017.8
= 3.13
8783438.4
m = 240.23 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 7.3566 )
240.23 = 0.03062
= 0.96938 0.015431
akar = 0.01312
0.01312
Pmax = 0.0403
Di gunakan tulanagn 4 D 16
= 200.96
a = = 193103.26784 = 60.78
3177.3
Mn = = 36163200.1936
Penulangan Geser
Vu = 33408.55
875813.4
Vc = = 935.8490262858 155.9748377143
Vn = = 41760.6875 N
Vs = Vn - Vc
= 41760.6875 - 155.9748377143 = 41604.7126622857 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
33408.55
306.12
mm
738.25
mm
PERHITUNGAN STRUKTUR KOLOM DAN BALOK
Spesifikasi DATA :
h Tinggi Balok = 400 mm fc' = 1869000 kg/m2 18.69
b Lebar Balok = 250 mm fy BJTD = 24022600 kg/m2 240.23
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2 240
Diameter Tulangan Utama = 13 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 7.7 mm
Tinggi Efektif
rumus:
d = 335.8
= 0.8
14364290.88
= 0.64
22552328
m = 240.226 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 1.4987 )
240.23 = 0.00624
= 0.99376 0.003124
akar = 0.00266
0.00266
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn 4 D 13
= 132.665
a = = 127478.32916 = 32.10
3971.625
Mn = = 37400818.7473
Penulangan Geser
Vn = = 47880.97 N
Vs = Vn - Vc
= 47880.97 - 1252.6074804184 = 46628.3625195817 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
= 0.8
28728581.8
= 1.27
22552328
m = 240.23 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 2.9973 )
240.23 = 0.01248
= 0.98752 0.006258
akar = 0.00532
0.00532
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn 4 D 13
= 132.665
a = = 127478.32916 = 32.10
3971.625
Mn = = 37400818.7473
Penulangan Geser
Vu = 38304.776
1569025.5
Vc = = 1252.6074804184 208.7679134031
Vn = = 47880.97 N
Vs = Vn - Vc
= 47880.97 - 208.7679134031 = 47672.2020865969 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
Spesifikasi DATA :
h Tinggi Kolom = 400 mm fc' = 1869000 kg/m2 18.69
b Lebar Kolom = 250 mm fy BJTD = 24022600 kg/m2 240.23
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2 240
Diameter Tulangan Utama = 13 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 7.7 mm
Tinggi Efektif
rumus:
d = 335.8
= 0.8
146959.128
= 0.0065
22552328
1.46959128
m = 240.226 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 0.0153 )
240.23 = 0.00006
= 0.99994 0.000032
akar = 0.00003
0.00003
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn 12 D 13
1107.75
= 132.665
a = = 382434.98748 = 96.29
3971.625
Mn = = 33646450.823
Penulangan Geser
Vn = = 41825.05375 N
Vs = Vn - Vc
= 41825.05375 - 1252.6074804184 = 40572.4462695816 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
= 0.8
5038126
= 0.22
22552328
m = 240.23 = 1.17647059
204.1921
Pperlu =
= 1 ( 1 - 1 0.5256 )
240.23 = 0.00219
= 0.99781 0.001095
akar = 0.00093
0.00093
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn 5 D 13
= 132.665
a = = 159347.91145 = 40.12
3971.625
Mn = = 36931522.7568
Penulangan Geser
Vu = 33460.043
1569025.5
Vc = = 1252.6074804184 208.7679134031
Vn = = 41825.05375 N
Vs = Vn - Vc
= 41825.05375 - 208.7679134031 = 41616.2858365969 N
7.7 =
= 46.54265
Av = 46.543 x 2= 93.0853
Spesifikasi DATA :
h Tinggi Balok = 450 mm fc' = 2640000 kg/m2
b Lebar Balok = 200 mm fy BJTD = 40000000 kg/m2
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2
Diameter Tulangan Utama = 22 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 10 mm
Tinggi Efektif
rumus:
d = 379
= 0.8
131173920.76
= 5.71
22982560
m = 400 = 1.17647059
340
Pperlu =
= 1 ( 1 - 1 13.43 )
400 = 0.03357
= 0.96643 0.016930
akar = 0.01439
0.01439
Pmin = 0.02878135
Pmax = 0.01439
Di gunakan tulanagn D 22
= 379.94
a = = 1745300.80794 = 388.88
4488
Mn = = 322111284.485
Spesifikasi DATA :
h Tinggi Balok = 450 mm fc' = 2640000 kg/m2
b Lebar Balok = 200 mm fy BJTD = 40000000 kg/m2
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2
Diameter Tulangan Utama = 22 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 10 mm
Tinggi Efektif
rumus:
d = 379
= 0.8
131173920.76
= 5.71
22982560
m = 400 = 1.17647059
340
Pperlu =
= 1 ( 1 - 1 13.43 )
400 = 0.03357
= 0.96643 0.016930
akar = 0.01439
0.01439
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn D 22
= 379.94
a = = 351712 = 78.37
4488
Mn = = 119517505.426
Spesifikasi DATA :
h Tinggi Balok = 450 mm fc' = 2640000 kg/m2
b Lebar Balok = 200 mm fy BJTD = 40000000 kg/m2
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2
Diameter Tulangan Utama = 22 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 10 mm
Tinggi Efektif
rumus:
d = 379
= 0.8
131173920.76
= 5.71
22982560
m = 400 = 1.17647059
340
Pperlu =
= 1 ( 1 - 1 13.43 )
400 = 0.03357
= 0.96643 0.016930
akar = 0.01439
0.01439
Pmin = 0.02878135
Pmax = 0.01439
Di gunakan tulanagn D 22
= 379.94
a = = 1745300.80794 = 388.88
4488
Mn = = 322111284.485
Spesifikasi DATA :
h Tinggi Balok = 450 mm fc' = 2640000 kg/m2
b Lebar Balok = 200 mm fy BJTD = 40000000 kg/m2
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2
Diameter Tulangan Utama = 22 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 10 mm
Tinggi Efektif
rumus:
d = 379
= 0.8
131173920.76
= 5.71
22982560
m = 400 = 1.17647059
340
Pperlu =
= 1 ( 1 - 1 13.43 )
400 = 0.03357
= 0.96643 0.016930
akar = 0.01439
0.01439
Pmin = 0.02878135
Pmax = 0.01439
Di gunakan tulanagn D 22
= 379.94
a = = 1745300.80794 = 388.88
4488
Mn = = 322111284.485
Spesifikasi DATA :
h Tinggi Balok = 450 mm fc' = 1868000 kg/m2
b Lebar Balok = 250 mm fy BJTD = 40000000 kg/m2
Selimut Beton = 50 mm fy BJTP = 24000000 kg/m2
Diameter Tulangan Utama = 13 mm BJ Btn = 2400 kg/m3
Diameter Tulangan Sengkang = 10 mm
Tinggi Efektif
rumus:
d = 383.5
= 0.8
12742924.43
= 0.43
29414450
m = 400 = 1.17647059
340
Pperlu =
= 1 ( 1 - 1 1.0193 )
400 = 0.00255
= 0.99745 0.001275
akar = 0.00108
0.00108
Pmin = 0.0058
Pmax = 0.0403
Di gunakan tulanagn 4 D 13
= 132.665
a = = 212264 = 53.47
3969.5
Mn = = 126967717.299
y x
3.5 1,484 1,484,407.17 4
3 547 546,886.85 3.75
3 866 865,904.18 4
1.5 1,732 1,731,808.36 3.75
3 577 577,269.45 4
3 1,732 1,731,808.36 4.5
v geser
x 0.47
y 0.66
Portal X Portal Y
1/7.Fix (ton) 1/7.Fiy (ton)
598.65 598.65
35,769.32 35,769.32
- -
36,367.98 36,367.98
2,597.71 2,597.71
Hi Wi Wi*Hi Fix=Fiy Portal x
Lantai (m) (ton) (Lm) (ton) 1/7.Fix (ton)
Atap 8 23446 187568 13668.91 976.3507142857
Lantai 2 4 301968 1207872 88022.97 6287.355
Lantai 1
2053533.6
650.9004761905
216.9668253968
650.9004761905
Portal y
1/7.Fiy (ton)
976.3507142857
6287.355
Hi Wi Wi * Hi Fix=Fiy
Lantai
(m) (ton) (t.m) (ton)
Lantai 10 36.00 392,400.00 14,126,400.00 21,403.64
Lantai 9 32.00 784,800.00 25,113,600.00 76,101.82
Lantai 8 28.00 1,177,200.00 32,961,600.00 149,825.45
Lantai 7 24.00 1,569,600.00 37,670,400.00 228,305.45
Lantai 6 20.00 1,962,000.00 39,240,000.00 297,272.73
Lantai 5 16.00 2,354,400.00 37,670,400.00 342,458.18
Lantai 4 12.00 2,746,800.00 32,961,600.00 349,592.73
Lantai 3 8.00 3,139,200.00 25,113,600.00 304,407.27
Lantai 2 4.00 3,531,600.00 14,126,400.00 192,632.73
Lantai 1 (dsr) - - - -
258,984,000.00 1,962,000.00
Portal X Portal Y
1/5.Fix (ton) 1/6.Fiy (ton)
4,280.73 3,567.27
15,220.36 12,683.64
29,965.09 24,970.91
45,661.09 38,050.91
59,454.55 49,545.45
68,491.64 57,076.36
69,918.55 58,265.45
60,881.45 50,734.55
38,526.55 32,105.45
- -
392,400.00 327,000.00