EPC Execution of Borealis Ethane Tank Project TGE en
EPC Execution of Borealis Ethane Tank Project TGE en
EPC Execution of Borealis Ethane Tank Project TGE en
Construction Phase
Time Schedule
0
Overall LNG Ethylene / Propylene,
capacity Ethane LPG, etc.
Business Plan for Capital Investments and Operations Operation and Maintenance Services
Basic Engineering and Front End Engineering Design Life-Cycle Engineering Studies and Plant
(FEED) Life-Cycle Optimisation
Screw Compressors
Preheating of Cold Ethane Vapour
Shell & Tube Heater
Usage of Hot Compressor Discharge
Preheating to -40°C
Compressor Inlet Temperature controlled via Bypass
Safety System
Stop Compressor at low Temperature
Start Half a Year in Advance with first Commissioning Tank Purging with Nitrogen
Meetings (Scope, Interfaces, Organization)
Tank Gassing-up & Start-up Compressors
Operator Training Support
Tank Cool Down
Dedicated Commissioning Team Full Time on Site
Start of In-tank Pumps
Start of Sendout
Performance Tests
Taking Over
Obrigado
多谢
STORAGE TANKS
Tanks installed with capacities from
3,000 - 120,000 m³
up to