Professional Documents
Culture Documents
Faizan Ee
Faizan Ee
Faizan Ee
OBJECTIVE____________________________________________________________________
Looking to align my career in an organization where I can apply my skill set of specialization in Energy Systems
supported by Industrial Engineering back ground.
WORK EXPERIENCE______________________________________________________________
Working as Assistant Manager in Plant Engineering Division at Indus Motor Company Limited from 2008 till date
in the Production Engineering Department.
JOB RESPONSIBILITIES___________________________________________________________
• Project Initiation (Making the Feasibility covering both aspects Technical as well as Financial)
• Preparation of Proposal Paper and Approval Paper
• Identify energy conservation opportunities and make cost/benefit report for management approval
• Preparation of WBS, CPM, Schedule, Budgets and Cost Control Systems.
• To interact extensively within the organization and also with foreign members (TMC, TMAP) during planning
phase of the project in order to gather complete technical info / set a concrete path for the project.
• Negotiation with the contractors regarding the contract awards.
• Implementation of plans based on Technical and Mechanical Drawings.
• On SITE Monitoring of the work rate of the project with special focus on Quality and Meeting Timelines.
• Proper Closing, Handing Over and Taking Over of the Project.
CORE EXPERTISE______________________________________________________________________
• Understanding of Drawings, Structure, Fabrication, Pneumatic, Hydraulic & Mechanical Const. Diagrams
• Planning, Engineering Estimation, Budgeting, Negotiation & Cost Controlling..
• Spare parts Inventory Control through SAP.
MAJOR PROJECTS_____________________________________________________________________
TRAINING_____________________________________________________________________
.
• Completed a two day workshop on the Energy saving strategies in Pneumatic Equipments given by SMC
• Completed a two day workshop on working of pneumatic valves from CKD.
• Have attended a week long in-house training of SAP (R3P) mainly in Material Management..
• Have attended a two day in house training on Toyota way and Toyota Production system.
• Have attended the project management workshop held in NED by Ind. & Manfg Department.
To design a heat recovery system for “pre-heat furnace of a bar rolling mill “in People Steel mills. In this project
we have to study heat recovery options from flue gas of furnace .We have decided to design a heat exchanger which
utilize exhaust energy of flue gas to increase temperature of combustion air coming in the burner .
COMPUTER EXPERTISE___________________________________________________________
PERSONAL INFORMATION_________________________________________________________