SL No. OBSERVATIONS OK NOT OK REMARKS
1 Brake
2 Front Light
3 Back Light
4 Front Horn
5 Auto-reverse Horn
6 Condition of Tyres
7 Hydraulic leakage
8 Seat Belt
9 Reflective Tape around cabin
10 Fire Extinguisher
11 Front glass & window
12 Both Side Indicator
13 Both Side Morror
14 All documents are with JCB
15 Registration Date
16 Vehicle Fitness Validity
17 Insurance Validity
18 Road Tax Validity
19 PUC Validity
Vehicle Pass Number (SEZ Pass
20
Holder)
Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
EX1050 CONCERTE (MIXTURE) INSPECTION CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT No.
AIC
Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
CONCRETE PUMP INSPECTION CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT No.
AIC
Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
VIBRATOR INSPECTION CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT No.
AIC
Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
HILTI MACHINE CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT N
AIC
Name & Signature of Agency Supervisor Name & Signature of SSL-Shift I/c
BAR CUTTING MACHINE CHECKLIST
DATE SERIAL No.
TIME AGENCY
AREA EQUIPMENT N
AIC