PERFORMANCE MANAGEMENT SYSTEM

KEY RESULT AREAS

Assessment year: 2017-2018

Bhilai Coal & Coke Oven


KPA CODE KPA DESCRIPTION
3716 Inspection of equipment for BSP 7.0Mt expansion, BSL& NMDC project
3714 Coordination & review meeting with client & contractor
4819 Certification of payments of sub-contractor
5302 Heating up and post commissioning of COB#07, BSL
5311 PG test of COB#06, RSP
3715 Engineering and preparation of drawings as per site requirements
3717 Inspection of Refractory for BSP 7.0Mt expansion, COB #9 & NMDC project
5289 PAC defect lists liquidation and Post Commissioning activities of COB#09,
3711 Site Supervision for EPC job of COB #9
3712 Designer supervision for turnkey packages of 7.0 MT Expansion