Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Mastermind Engineering Consultancy Pvt.

Ltd
Bagbazar , Yeti-Plaza, Kathmandu,Nepal
PH: 01-4248199

4-1
Contents

1 Introduction
2 Create a Concrete Box Girder Bridge
2.1 Example Project

2.2 Start the Model

2.3 Bridge Wizard

2.4 Layout Line

2.5 Deck Section

2.6 Bridge Object

2.7 Parametric Variation

2.8 Bridge Object Assignments

2.8.1 Spans

2.8.2 Abutments

2.8.3 Bents

2.8.4 Diaphragms

2.8.5 Prestress Tendons

2.9 Update the Linked Bridge Model

3 Load the Bridge Model


3.1 Lanes

3.2 Vehicles

3.3 Vehicle Classes

3.4 Load Patterns

3.5 Load Cases

4-2
Mastermind Engineering Consultancy Pvt. Ltd
Bagbazar , Yeti-Plaza, Kathmandu,Nepal
PH: 01-4248199

3.5.1 Moving Load Case

3.5.2 Other Load Cases

3.6 Additional Loads

4 Analysis and Results of a Bridge Model


4.1 Bridge Responses

4.2 Run Analysis

4.3 Display Results

4.3.1 Graphical Displays

4.3.2 Output Tables

Cost Estimate

1. Training on Csi-Bridge design 2017 Rs. 10,000.00 (Pre Person)


(Note: At least 6 students should be in a group. 13% Vat will be charges extra)
(Note: Class duration will be 15 days and Class will be 1 Hr. in a day )

4-3

You might also like