Actural

Jan-00 PipeLine Installation Work Progress % Delivery Primer Coat Welding Installation Hydro-Test Painting Outstanding
P Piping Welding Work Installation 79%
P.1. SRC Area 17% 67%
P.1.01 SRC Mogas 21% 84%
P.1.02 SRC Jet Fuel 21% 84%
P.1.03 SRC Diesel 17% 68%
P.1.04 SRC Sea Water 7% 27%
0%
P.2 JIMT 20% 80%
P.2.01 Mogas 15% 60%
焊接记录 安装记录 阀门安装记录
sn PipeLine Type Today Activity Total Da-Inch Qty Today Welding Qty Completed Welding Until Progress Design Length Today Inst Length Accum. Length Progress % Design Valve Valve Install First delivery valve second delivery valve thirdly delivery valve
Today
管线类型 形象进度简要描述 设计焊接量 今日焊接数量 累计焊接量 焊接进度 计划安装管线长度 今日安装长度 累计安装长度 累计安装% 计划安装阀门数量 阀门安装数量 第一批阀门到货数量 第二批阀门到货数量 第三批阀门到货数量

P Piping Welding Work 0 45904 82.5 36164 79% 10100 60 7904 78%
P.1. SRC Area 0 5092 0 3388 67% 1147 0 890 78%
P.1.01 SRC Mogas Shop Fabrication 2090 1754 84% 548 510 93%
P.1.02 SRC Jet Fuel Shop Fabrication 1004 672 67% 207 190 92%
P.1.03 SRC Diesel Shop Fabrication 1023 696 68% 206 190 92%
P.1.04 SRC Sea Water 0 975 266 27% 186 0
0
P.2 JIMT 0 40812 82.5 32776 80% 8953 60 7014 78% 1390 61 392
P.2.01 Mogas Fild Installation & Welding 9809 4 5918 60% 1240 715 58% 395 130
P.2.02 Jet Fulel Fild Installation & Welding 3012 8 1850 61% 948 30 475 50% 203 58
P.2.03 Diesel Fild Installation & Welding 4979 4 3027 61% 764 472 62% 252 51
P.2.04 Fire Fighting / FW 0 15315 24.5 15372 100% 3185 3012 95% 295 61 95
P.2.05 Fire Fighting / FS 0 4512 6 4467 99% 1126 1080 96% 21
P.2.06 Plan Air 0 411 298 73% 391 280 72% 65 40
P.2.07 Potable Wate / UP G /OW 0 1346 16 1344 100% 1299 30 980 75% 42 17
P.2.08 Oily Water / UP G / OW 0 858 236 28% 33
P.2.09 Additive/AD 0 100 34 34% 277 120 43% 63
P.2.10 Vapor/VL 0 470 20 230 49% 21 1