Revised Estimate
Revised Estimate
Pile Cap
length width area depth volume V
PLC-1 16 units 4 2.8 11.2 1.15 12.88 206.08
PLC-2 6 units 4 4 16 1.15 18.4 110.4
PLC-3 45 units 2.8 2.8 7.84 1.15 9.016 405.72
PLC-4 1 units 16 1.15 18.4 18.4
PLC-5 2 units 2.8 4 11.2 1.15 12.88 25.76
Total V concrete 766.36
Pedestal
length width area depth volume V
alternative!
70 units 0.9 0.9 0.81 2 1.62 113.4 30 pcs
10mm
lef
15 @ 100
Tie beam beam size cont. Top cont. Bot web stiffen hoops
TB-1 length b d pcs pcs
GL-1 9 units 9 0.7 0.8 4 4 1-12mm
GL-2 9 units 9 0.7 0.8 4 4
GL-3 9 units 9 0.7 0.8 4 4
GL-4 9 units 9 0.7 0.8 4 4
GL-5 9 units 9 0.7 0.8 4 4
GL-6 1 unit 11.5 0.7 0.8 4 4
1 unit 6.5 0.7 0.8 4 4
7 units 9 0.7 0.8 4 4
GL-7 1 unit 11.5 0.7 0.8 4 4
1 unit 6.5 0.7 0.8 4 4
7 units 9 0.7 0.8 4 4
TB-2
GL-a to jù 60 units 9 0.7 0.8 4 4
mid right
@150 15 @ 100
hoops