Abstract of Cost
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Abstract of Cost
Name of works :- Site Development works of Health Post Building
Place :- Thalajung, Gorkha FY- 070/71
Quantity
Amount
Item No. Description of Work Unit Landscaping & Rate Rs. Remarks
Retaining Wall
(NRs.)
CIVIL WORKS
1 SITE PREPARATION & DISMANTLING WORKS
1.1 Site Clearance & layout
1.1.4
Earthwork in excavation in hard soil using machine and M3 1,065.21 1,886.00 2,008,986.06
removing out of site all complete.
2 EXCAVATION AND FILLING
2.1 Earthwork in excavation for foundation in all kind of soil M3 37.29 28.29 1,054.93
including necessary lead and lift.
3 MASONRY WORK
3.1 Soling Works
3.1.2 Providing & laying boulder stone soling in foundation & floor
including voids filling with sand all complete as per instruction M3 13.97 2,710.56 37,866.52
of the site engineer.
3.6 Providing, laying and curing stone masonry works in cement,
sand mortar (1:6) in substructure & compound wall finished in
perfect lines & level as per specification, drawings & M3 47.42 9,330.19 442,437.61
instructions of the site engineer.
4 CEMENT CONCRETE WORKS
4.1 Providing, laying, compacting and curing plain cement
concrete M10 (1:3:6) in foundation with cement, sand and
stone ballast 20mm gauge finishing to approved level, lines M3 4.31 2,710.56 11,682.51
and dimensions all complete as per drawings, specifications
and instruction of the site engineer.
4.2 Providing, laying, compacting and curing plain cement
concrete M15 (1:2:4) in Solid Floor with cement, sand and
stone ballast 20mm gauge finishing to approved level, lines M3 6.57 2,710.56 17,808.38
and dimensions using all complete as per drawings,
specifications and instruction of the site engineer.
4.3 Providing, laying, compacting and curing M20 (1:1.5:3) plain cement
concrete for column, slab, beams, tie beam Lintel Sill and all kinds of
R.C.C. works with cement sand and stone ballast 20mm down
finishing to approved level, line and dimensions using mixer machine
M3 4.88 16,711.19 81,550.61
& vibrator all complete as per specifications, drawings and
instructions of the site engineer, all complete.
5 REINFORCEMENT
5.1 Reinforcement bars (Fe 500 TMT) work including
straightening, cleaning, cutting, bending, binding with 20 SWG
annealed wire & fixing in position as per drawing, bar bending
schedule for raft foundation column, beam, wall, stair, slab in Kg 382.75 111.36 42,623.04
all R.C.C. works as per specification, drawing & instruction of
site engineer. Approved brands: Himal Iron, Panchakanya or
equivalent.
Quantity
Amount
Item No. Description of Work Unit Landscaping & Rate Rs. Remarks
Retaining Wall
(NRs.)
7.2 Providing, laying & curing 12.5 mm thick cement sand (1:4)
Plastering on outside wall to perfect plumb, lines & level
including band (pani patti) for preventing the flow of rain
water from slab edges during rain fall all complete as per M2 7.20 321.96 2,318.11
design drawings, specifications and instruction of the site
engineer all complete:
7.4 Providing and pointing in perfect line, level and groove depth
with 1:3 cement sand mortar for joints of stone masonry
works above ground level in compound wall including raking
the joints, scafolding, curing the works all complete as per M2 163.50 218.77 35,768.90
specifications and instruction of the site engineer.
11 MISCELLANEOUS WORKS
Providing, fabricating & fixing iron gate using 40mm dia.
Medium Black pipe frame with 25mm dia. Medium black pipe
sub gate frame, 25x25x 2mm thick square pipe, 18 guage MS
sheet, 20x4.5 mm grill plate on top of gate and other
11.09 necessary hinges, tower bolt, aldrops and plates with one coat Kg 190.19 1,886.00 358,698.34
of metal primer & enamel paint as per design drawing,
specifications and instructions of site engineer all complete.
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Bill of Quantity
Name of works :- Construction of Health Post Building
Place :- Thalajung, Gorkha
A. The Rate quoted here under shall be inclusive of :
1. Supplying the materials along with accessories to the site
2. Fixing and erecting them in position as per general practices, specifications and instructions of Site Engineer
3. Tests and Maintenance up to the period, specified in the agreement
4. Necessary water for sprinkling, mixing, curing etc all complete.
B. The itemwise rate should be quoted without VAT
Clearing the site of all the vegetation, roots and other unuseful materials
including excavation of top soil to a depth of 15 cm, removing bushes, trees
and leveling the Site for stacking the useful items in specified space and
1.1.1 L.S. 1.00
disposing other item before commencing the construction work & Placing
project description sign board as per instruction of the site engineer all
complete including layout of buildings, roads and ancillary services.
Clearing the site of all the unuseful materials including removing all them from
1.1.2 site and leveling the Site after completing the works as per instruction of the L.S. 1.00
site engineer all complete.
Providing and maintaning site office (room of about 12 sq m) during the project
1.1.3 month 15.00
period including necessary furniture for the personnel of the office staff.
Earthwork in excavation in hard soil using machine and removing out of site all
1.1.4 complete. M3 1,065.21
2.3 Sand filling in floor including supply of filling materials, watering, consolidation
in layers of 15 cm and ramming as per instruction of site engineer. M3 37.42
2.4 Brick ballast filling in soak pit including supply of filling materials as per
instruction of site engineer. m3 5.65
3 MASONRY WORK
3.1 Soling Works
3.1.1 Providing & laying flat brick soling in foundation & floor including voids filling
with sand all complete as per instruction of the site engineer. m2 27.53
3.1.2 Providing & laying boulder stone soling in foundation & floor including voids
filling with sand all complete as per instruction of the site engineer. M3 96.23
3.2 Providing, laying and curing first class brick masonry works in cement, sand
mortar (1:6) in substructure, ground floor & soak pit finished in perfect lines &
level as per specification, drawings & instructions of the site engineer. M3 100.89
3.3 Providing, laying and curing first class brick masonry works in cement, sand
mortar (1:6) above ground floor finished in perfect lines & level as per M3 81.46
specification, drawings & instructions of the site engineer.
3.4 Providing, laying and curing first class brick masonry works in cement, sand
mortar (1:4) in substructure & ground floor for partation wall finished in perfect
lines & level as per specification, drawings & instructions of the site engineer. M3 27.23
3.5 Providing, laying and curing first class brick masonry works in cement, sand
mortar (1:4) above ground floor for partation wall finished in perfect lines & level
as per specification, drawings & instructions of the site engineer. M3 2.93
3.6 Providing, laying and curing stone masonry works in cement, sand mortar (1:6)
in substructure & compound wall finished in perfect lines & level as per M3 101.14
specification, drawings & instructions of the site engineer.
4 CEMENT CONCRETE WORKS
4.1 Providing, laying, compacting and curing plain cement concrete M10 (1:3:6) in
foundation with cement, sand and stone ballast 20mm gauge finishing to
approved level, lines and dimensions all complete as per drawings, M3 25.85
specifications and instruction of the site engineer.
4.4 Providing, laying, compacting and curing M20 (1:1.5:3) plain cement concrete
with silica cement admixture @ 5% for top floor slab, beams and water tank of
R.C.C. works with cement sand and stone ballast 20mm down finishing to
approved level, line and dimensions using mixer machine & vibrator all m3 6.93
complete as per specifications, drawings and instructions of the site engineer,
all complete.
5 REINFORCEMENT
5.1 Reinforcement bars (Fe 500 TMT) work including straightening, cleaning,
cutting, bending, binding with 20 SWG annealed wire & fixing in position as per
drawing, bar bending schedule for raft foundation column, beam, wall, stair,
slab in all R.C.C. works as per specification, drawing & instruction of site Kg 29,309.04
engineer. Approved brands: Himal Iron, Panchakanya or equivalent.
6 FORMWORKS
6.1 Centering and shuttering with approved waterproof plywood for all kinds of
R.C.C. work including all necessary steel propping, scaffolding, staging,
supporting, dismantling and clearing from the site, including shuttering of M2 1,771.91
circular column up to 2 m dia etc. all complete as per design drawings,
specifications and instruction of the site engineer .
7 PLASTERING & POINTING WORKS
7.1 Providing, laying & curing 20 mm thick cement sand (1:4) Plastering on inside
wall and floor to perfect plumb, lines & level all complete as per design
drawings, specifications and instruction of the site engineer all complete: M2 1,375.76
7.2 Providing, laying & curing 12.5 mm thick cement sand (1:4) Plastering on
outside wall to perfect plumb, lines & level including band (pani patti) for
preventing the flow of rain water from slab edges during rain fall all complete as M2 1,135.80
per design drawings, specifications and instruction of the site engineer all
complete:
7.3 Providing, laying & curing 12.5 mm thick cement sand (1:3) plastering in ceiling,
beams surfaces including chipping & wetting the concrete surfaces finished in
perfect plumb, lines and level as per drawings, specifications and instructions M2 611.05
of the site engineer.
10.10 Making & fixing MS door for pump house with locking arrangement of approved
pattern and manufacture finished with one coat of metal primer paint and two
coat of enamel paint with approved colour as per design, drawing and L.S. 2.00
instruction all complete.
11 MISCELLANEOUS WORKS
Providing 26 gauge (0.41mm) Colour CGI sheet for roof including fixing in
11.01 proper shape & size with all necessary rails, screws, bolts & nuts washers, J & M2 77.85
L hocks etc as per drawing & instruction all complete.
Providing and fitting 26 gauge (0.41mm) Colour G.I plane sheet for ridge in
11.02 proper shape and size with all necessary screws, bolts and nuts as per drawing Rm 8.00
and instruction all complete
Providing M.S. blackpipe Truss, Rafter, purlin, Post with I.S. or B.S. section
including jointting , fixing, erection and primer & enamel painting with all
11.03 necessary M.S. bed plates, shoe angles, anchor bolts leas sheeting or cement Kg 1,006.36
grouting as per drawing and instructions all complete .
Providing & fixing 2" dia stainless steel pipe hand rail fixing on parapet wall
11.06 including painting as per design drawing and specifications and instructions of Rm 198.16
site engineer.
Providing & fixing metal monkey ladder using rectangular hollow section of
50x25x2 mm size with 450 mm wide with one coat of metal primer & enamel
11.07 paint as per design, specification & instructions of Site Engineer all complete kg 30.10
Providing and fitting 26 gauge Colour G.I plane sheet gutter in proper shape
11.08 and size with all necessary brackets, screws, bolts and nuts as per drawing and Rm 31.50
instruction all complete.
Providing, fabricating & fixing iron gate using 40mm dia. Medium Black pipe
frame with 25mm dia. Medium black pipe sub gate frame, 25x25x 2mm thick
square pipe, 18 guage MS sheet, 20x4.5 mm grill plate on top of gate and other
11.09 necessary hinges, tower bolt, aldrops and plates with one coat of metal primer Kg 190.19
& enamel paint as per design drawing, specifications and instructions of site
engineer all complete.
Providing and paving heavy duty concrete interlocking block 60mm thk siddhico
11.10 or equivalent in walk way as per drawing, design and instruction of site M2 198.00
engineer all complete..
Supplying & Fixing 0.075x0.125 m size, 2.10m height concrete (1:2:4) post with
11.11 reinforcement for fencing at 2.00 m interval as per design, drawing, No 126.00
specifications and instructions of site engineer.
Supplying & Fixing GI Barbed wire fencing work (5 layer horizontal & 2 layer
11.12 diagonal) as per design, drawing, specifications and instructions of site Rm 1,867.50
engineer.
Providing and laying 2 coats of water proofing materials for terrace roof
(elastocrate cementious elastrometric water proofing coating two components)
11.13 capacity per Kg 6 sq ft as per specification and direction complete works. M2 348.45
Making & fixing 3mm thick MS sheet manhole cover (.60cmx.60cm) as per
11.14 design drawing, specifications and instructions of site engineer all complete. Set 2.00
12.1.2 Wall lamp with CFL lamp decorative etc all complete. Set 8.00
12.1.3 Wall lamp with GLS lamp decorative etc all complete. Set 9.00
12.1.4 Down light (concealed ) with CFL etc all complete. Set 6.00
12.1.5 Hanging light with CFL lamp decorative etc all complete. Set 1.00
12.1.6 1X40watt Tube light box type Wipro /Ge or eqvt. etc all complete. Set 24.00
12.1.7 2x40 watt tube light box type Wipro/Ge or eqvt.etc all complete. Set 4.00
12.1.8 2x40 watt tube light box mirror optic Wipro/Ge or eqvt.etc all complete. Set 4.00
12.1.9 Mirror light with CFL lamp decorativeor eqvt etc all complete. Set 9.00
12.2.2 9"exhaust fan Almonard /Bajaj or eqvt.etc all complete. Set 10.00
12.2.3 16'' wall fan Almonard/Bajaj or eqvt.etc all complete. Set 1.00
12.3 SOCKET,SWITCH ,JUNCTION BOX (Flush type)
12.3.0 Accessories: metal box ,screws ,gripes, flexible wire etc all complete.
12.3.1 Dimmer switch for ceiling fan etc all complete. Set 16.00
12.3.2 Bell push switch Anchor or eqvt etc all complete. Set 2.00
16/6 Amps combined S/socket flush type with child lock Anchor or eqvt.etc all
12.3.3 Set 65.00
complete.
12.3.4 1 gang 1,2 way switch Anchor or eqvt.etc all complete. Set 22.00
12.3.5 2gang one way switch Anchor or eqvt.etc all complete. Set 18.00
12.3.6 3 gang one way switch Anchor or eqvt.etc all complete. Set 12.00
12.3.7 4 gang one way switch Anchor or eqvt.etc all complete. Set 14.00
12.3.8 6 gang one way switch Anchoror eqvt. etc all complete. Set 2.00
12.3.9 Junction box made of metal with cover size 6"X4" etc. all complete. Set 20.00
12.4 MAIN SWITCH / DISTRIBUTION BOARD
Accessories ;screws, gripes, nut bolt,cu bus bar,earth bus bar, neutral bus
12.4.0 bar,fuse, porcelin base ,cu. Strip for connection, cable shoe ,phase bar,pvc
tape etc all complete.
60 Amps Panel board made of mild steel sheet with cu. busbar double cover
12.4.1 floor mount suitable size & color push type lock for housing the following Set 1.00
items all complete.(space for 4 no. MCCB).
12.4.1.1 40- 50 Amps TP MCCB Siemens ,Ge or eqvt. for incoming. No 1.00
12.4.1.2 20-30 Amps TP MCCB Siemens, Geor eqvt. for outgoing. No 3.00
12.4.1.3 10 Amps DP MCB Siemens Ge,Merlin gerain or eqvt. for main . No 2.00
Distribution board 6 way TPN made of mild steel sheet double cover lockable
12.4.2 Set 3.00
Geco,Standard,Nepal made flush type etc all complete.
12.4.2.1 25-32 Amps TP MCB Siemens Ge,Merlin gerain or eqvt. for main.(1x3=3) No 3.00
6,16,25 Amps. SP MCB Siemens,Ge,Merlin gerain or eqvt. for light & power
12.4.2.2 No 54.00
circuit.(18x3=54)
Distribution board 12 way SPN made of mild steel sheet double cover lockable
12.4.3 Set 2.00
Geco,Standard, Nepal made flush type etc all complete.
12.4.3.1 20 Amps DP MCB Siemens Ge,Merlin gerain or eqvt. for main .(1x2=2) No 2.00
6,16,25 Amps. SP MCB Siemens,Ge,Merlin gerain or eqvt. for light , power &
12.4.3.2 No 24.00
A/C circuit.(2x12=24)
Distribution board 6 way SPN made of mild steel sheet double cover lockable
12.4.4 Set 1.00
Geco,Standard, Nepal made flush type etc all complete.
12.4.4.1 10 Amps DP MCB Siemens Ge,Merlin gerain or eqvt. for main . No 1.00
6 Amps. SP MCB Siemens,Ge,Merlin gerain or eqvt. for light , power & A/C
12.4.4.2 No 2.00
circuit.
12.5 POINT WIRING / WIRES/CABLES (concealed wiring )
Accessories:HDPE polythene pipe,screws,pvc tape, grips, circular box etc all
12.5.0
complete.
2x2.50 sq mm multi strand flexible cu .wire for light & fan point in 1/2"HDPE
12.5.1 Point 166.00
polythene pipe etc all complete.
2x4.0+1x1.50 sq.mm multi strand flexible cu wire for power point in 3/4" HDPE
12.5.2 Point 65.00
polythene pipe etc all complete.
10 sq.mm 4 core unarmoured copper cable for main panel board to DB,
12.5.3 Rm 65.00
through polythene pipe etc all complete.
2x6.0+1.50 sq.mm copper cable from panel board to( toilet block) DB-3, DB-4
12.5.4 Rm 60.00
to DB-5,DB -6 through 1" HDPE polythene pipe etc all complete.
8 swg copper wire for earth continuity from panel board to DB,main switch &
12.5.5 Rm 75.00
earthing site in 1/2"HDPE polythene pipe etc all complete.
12.6 EARTHING
12.6.0 Accessories :salt, coal, cu plate, HDPE polythene pipe., etc all complete.
Earthing with cu plate size 65 cmx65cmx3.15mm with 8 swg copper wire for
earth continuity from panel board to earthing site including excavation of 6 ft
12.6.1 Set 1.00
deep trench in moist area and refilling the tranch with cubical salt and charcoal
in alternet layer with watering arrangement etc all complete.
13.4.1 Stainless steel Scrub sink 1.5mt length,deep 500mm+150mm splash set 1.00
Supplying and Fixing Indian pattern C.P. valves with wall flange Including c.p.
13.5
nipple all complete set.
13.5.1 15mm C.P. concealed stop cock with sliding flange Nos 9.00
13.5.2 Chrome plate shower rose 7.5 cm dia.with wall flange all complete set. nos 3.00
13.5.3 15mm dia C.P. bath spout with wall flange. Nos 3.00
13.5.4 C.P. Bibcock 15mm dia long neck type with wall flange nos 8.00
13.5.5 15mm dia Angle valve with wall flange. nos 34.00
13.5.7 15 mm CP water spray with 1.2mt. Long flexiable pipe. set 2.00
13.5.8 15mm dia. Urinal Auto Closing Valve with built in Control Cock nos 2.00
13.6 Supplying and Fixing Indian pattern bathroom accessories all complete set.
13.6.1 Chrome plated toilet paper holder flap type(cover type). nos 2.00
13.6.4 Looking Mirror Modi guard 450x600mm (18"x 24") nos 8.00
13.6.5 European pattern Stainless steel 45cm long with bend type Grab Bar . Set 2.00
Indian pattern Electric water heater (Geyser) with built up check valve, pressure
13.7
relief valve all complete set.(Crompton,bajaj,Jaquar or equivalent.)
Supplying and Fixing Pvc roof water tank With screw type cover including drain
13.8
hole ,inlet outlet, over flow etc.all complete set .Hill take, Roof top or equivalent
13.9.3 Pressure sensor switch for pump auto switch off all complete set. Set 2.00
13.11.2 25 mm dia PPR Brass Gate Valve all complete. Nos 10.00
13.11.3 32 mm dia PPR Brass Gate Valve all complete. Nos 7.00
13.11.4 40 mm dia PPR Brass Gate Valve all complete. Nos 2.00
Supplying and Fixing Gun metal gate valve/check valve full way medium all
13.12
complete set as per specification and instruction.
13.13.1 15mm dia.6mm wall thickness insulation for hot water pipe all complete. Rm 6.00
13.13.2 20mm dia,6mm thick wall thickness insulation for hot water pipe Rm 42.00
Supplying and Fixing solar water heater with 3.0 k.w. electric booster with
thermostat all complete set. Technical spe.:-Inside boiler M.S sheet 4.0 mm thick
13.14
with Expansion joint(over lap joint) in cover and bottom with 25x25x3 mm angle
welded,4.0 kg/sq
13.14.1 300 lit. 3 panel solar heater fixing with electric booster all complete. Set 1.00
Supplying and Fixing uPVC pipe 6kg/sqcm all complete set as per specification
13.15
and instruction. (Dwv,Panchakanya,SN-4, Prince,Supreme )
13.16.23 5 kg fire extinguiser with pressure guage type all complete set. set 6.00
13.16.25 C I Cover round type 60x60cm, with locking arrangement (16kg) complete set. Set 1.00
Supplying and Fixing HDP Pipe 4 kg/sq.cm all complete set as per specification
13.17
and instruction. (Panchakanya or equivalent(N.S. )
13.17.2 10 kg/cm2 (20 mm) HDP pipe including fittings & layings Rm 200.00
Providing and laying non-pressure NP2 class (light duty) RCC pipes with collars
13.18 jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2
find sand) including testing of joints etc. complete.
13.18.1 150 mm dia NP2 RCC Hume pipe including collar with all complete. Rm 39.00
Telephone : Mobile :
Signature : E-mail :
Date :
Government of Nepal
Ministry of Urban Development
ban Development & Building Construction
Division Office
Gorkha
ll of Quantity
FY- 070/71
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Total Amount
(NRs.)
Abstract of Cost
Name of works :- Construction of Health Post Building
Place :- Thalajung, Gorkha FY- 070/71
Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity Quantity
Landscaping Inspection Pump Total Amount
Item No. Description of Work Unit Main Septic Soakpit Water Placenta Waste Rate Rs. Remarks
Toilet & Retaining Tank 19 House 2 Quantity (NRs.)
Building Wall Tank 2 Nos Tank Pit Burner
Nos Nos
CIVIL WORKS
1 SITE PREPARATION & DISMANTLING WORKS
1.1 Site Clearance & layout
Clearing the site of all the vegetation, roots and other unuseful
materials including excavation of top soil to a depth of 15 cm,
removing bushes, trees and leveling the Site for stacking the
useful items in specified space and disposing other item
1.1.1 L.S. 1.00 - - - - - - - - - 1.00 10,000.00 10,000.00
before commencing the construction work & Placing project
description sign board as per instruction of the site engineer
all complete including layout of buildings, roads and ancillary
services.
1.1.4
Earthwork in excavation in hard soil using machine and M3 - - 1,065.21 - - - - - - - 1,065.21 1,886.00 2,008,986.06
removing out of site all complete.
2 EXCAVATION AND FILLING
2.1 Earthwork in excavation for foundation in all kind of soil M3 232.00 30.39 37.29 17.19 13.63 11.54 0.55 25.47 6.11 0.26 374.43 28.29 10,592.62
including necessary lead and lift.
2.2 Earthwork in filling in trench of foundation & floor including
consolidation in layers of 15 cm and watering as per M3 143.33 15.44 - - - - - - - - 158.77 237.47 37,703.11
instruction of site engineer.
2.3 Sand filling in floor including supply of filling materials,
watering, consolidation in layers of 15 cm and ramming as per M3 32.66 4.76 - - - - - - - - 37.42 5,584.40 208,968.25
instruction of site engineer.
2.4 Brick ballast filling in soak pit including supply of filling m3 - - - - 5.65 - - - - - 5.65 3,422.40 19,336.56
materials as per instruction of site engineer.
3.3 Providing, laying and curing first class brick masonry works in
cement, sand mortar (1:6) above ground floor finished in
perfect lines & level as per specification, drawings & M3 81.46 - - - - - - - - - 81.46 15,926.87 1,297,402.83
instructions of the site engineer.
3.4 Providing, laying and curing first class brick masonry works in
cement, sand mortar (1:4) in substructure & ground floor for
partation wall finished in perfect lines & level as per M3 3.13 4.44 - 5.06 - 5.31 1.12 3.34 4.10 0.73 27.23 16,133.87 439,325.28
specification, drawings & instructions of the site engineer.
3.5 Providing, laying and curing first class brick masonry works in
cement, sand mortar (1:4) above ground floor for partation
wall finished in perfect lines & level as per specification, M3 2.93 - - - - - - - - - 2.93 16,376.70 47,983.73
drawings & instructions of the site engineer.
3.6 Providing, laying and curing stone masonry works in cement,
sand mortar (1:6) in substructure & compound wall finished in
perfect lines & level as per specification, drawings & M3 46.69 7.03 47.42 - - - - - - - 101.14 9,330.19 943,655.42
instructions of the site engineer.
4 CEMENT CONCRETE WORKS
4.1 Providing, laying, compacting and curing plain cement
concrete M10 (1:3:6) in foundation with cement, sand and
stone ballast 20mm gauge finishing to approved level, lines M3 19.24 1.80 4.31 - - - - 0.50 - - 25.85 2,710.56 70,067.98
and dimensions all complete as per drawings, specifications
and instruction of the site engineer.
4.2 Providing, laying, compacting and curing plain cement
concrete M15 (1:2:4) in Solid Floor with cement, sand and
stone ballast 20mm gauge finishing to approved level, lines M3 17.06 2.99 6.57 0.78 - 1.54 0.25 - - 0.02 29.21 2,710.56 79,175.46
and dimensions using all complete as per drawings,
specifications and instruction of the site engineer.
4.3 Providing, laying, compacting and curing M20 (1:1.5:3) plain cement
concrete for column, slab, beams, tie beam Lintel Sill and all kinds of
R.C.C. works with cement sand and stone ballast 20mm down
finishing to approved level, line and dimensions using mixer machine
M3 181.90 20.20 4.88 0.66 0.43 - 0.36 - 0.59 0.38 209.40 16,711.19 3,499,323.19
& vibrator all complete as per specifications, drawings and
instructions of the site engineer, all complete.
5 REINFORCEMENT
5.1 Reinforcement bars (Fe 500 TMT) work including
straightening, cleaning, cutting, bending, binding with 20 SWG
annealed wire & fixing in position as per drawing, bar bending
schedule for raft foundation column, beam, wall, stair, slab in Kg 24,988.51 2,774.98 382.75 66.40 44.00 - 27.34 914.02 58.81 52.23 29,309.04 111.36 3,263,854.69
all R.C.C. works as per specification, drawing & instruction of
site engineer. Approved brands: Himal Iron, Panchakanya or
equivalent.
6 FORMWORKS
6.1 Centering and shuttering with approved waterproof plywood
for all kinds of R.C.C. work including all necessary steel
propping, scaffolding, staging, supporting, dismantling and
clearing from the site, including shuttering of circular column M2 1,556.04 165.83 - 6.59 3.30 - 3.54 29.00 4.72 2.89 1,771.91 111.36 197,319.90
up to 2 m dia etc. all complete as per design drawings,
specifications and instruction of the site engineer .
Ceiling ligh/Dome light 8" heavy carrier with CFL etc all
12.1.1 Set 66.00 66.00 4,511.45 297,755.70
complete.
12.1.2 Wall lamp with CFL lamp decorative etc all complete. Set 8.00 8.00 612.37 4,898.96
12.1.3 Wall lamp with GLS lamp decorative etc all complete. Set 9.00 9.00 353.62 3,182.58
12.1.4 Down light (concealed ) with CFL etc all complete. Set 6.00 6.00 1,175.87 7,055.22
12.1.5 Hanging light with CFL lamp decorative etc all complete. Set 1.00 1.00 2,134.40 2,134.40
1X40watt Tube light box type Wipro /Ge or eqvt. etc all
12.1.6 Set 24.00 24.00 1,564.57 37,549.68
complete.
2x40 watt tube light box type Wipro/Ge or eqvt.etc all
12.1.7 Set 4.00 4.00 2,336.22 9,344.88
complete.
2x40 watt tube light box mirror optic Wipro/Ge or eqvt.etc all
12.1.8 Set 4.00 4.00 5,269.30 21,077.20
complete.
12.1.9 Mirror light with CFL lamp decorativeor eqvt etc all complete. Set 9.00 9.00 612.37 5,511.33
12.1.10 Electrical bell musical type. Set 2.00 2.00 34.50 69.00
12.2 FAN / EXHAUST FAN
Accssories:as per sn A +nut, bolt, hook,clamp, regulator,
12.2.0
flexible wire etc all complete.
12.2.1 42'' ceiling fan Almonard/Bajaj or eqvt.etc all complete. Set 16.00 16.00 3,305.10 52,881.60
12.2.2 9"exhaust fan Almonard /Bajaj or eqvt.etc all complete. Set 10.00 10.00 3,390.20 33,902.00
12.2.3 16'' wall fan Almonard/Bajaj or eqvt.etc all complete. Set 1.00 1.00 3,473.57 3,473.57
12.4.1.1 40- 50 Amps TP MCCB Siemens ,Ge or eqvt. for incoming. No 1.00 1.00 5,270.45 5,270.45
12.4.1.2 20-30 Amps TP MCCB Siemens, Geor eqvt. for outgoing. No 3.00 3.00 5,270.45 15,811.35
10 Amps DP MCB Siemens Ge,Merlin gerain or eqvt. for
12.4.1.3 No 2.00 2.00 1,530.65 3,061.30
main .
12.4.1.4 Ammeter 0-500A No 1.00 1.00 1,092.50 1,092.50
12.4.1.5 Voltmeter 0-500 v No 1.00 1.00 1,141.95 1,141.95
12.4.1.6 Selector switch No 2.00 2.00 793.50 1,587.00
12.4.1.7 CT coil of suitable ratio for panel board. No 3.00 3.00 1,598.50 4,795.50
12.4.1.8 Indicator with fuse No 3.00 3.00 264.50 793.50
Distribution board 6 way TPN made of mild steel sheet
12.4.2 double cover lockable Geco,Standard,Nepal made flush type Set 3.00 3.00 4,096.87 12,290.61
etc all complete.
25-32 Amps TP MCB Siemens Ge,Merlin gerain or eqvt. for
12.4.2.1 No 3.00 3.00 1,808.95 5,426.85
main.(1x3=3)
6,16,25 Amps. SP MCB Siemens,Ge,Merlin gerain or eqvt.
12.4.2.2 No 54.00 54.00 333.50 18,009.00
for light & power circuit.(18x3=54)
Distribution board 12 way SPN made of mild steel sheet
12.4.3 double cover lockable Geco,Standard, Nepal made flush type Set 2.00 2.00 2,624.87 5,249.74
etc all complete.
20 Amps DP MCB Siemens Ge,Merlin gerain or eqvt. for
12.4.3.1 No 2.00 2.00 1,530.65 3,061.30
main .(1x2=2)
6,16,25 Amps. SP MCB Siemens,Ge,Merlin gerain or eqvt.
12.4.3.2 No 24.00 24.00 333.50 8,004.00
for light , power & A/C circuit.(2x12=24)
13 SANITARY WORKS
Supplying and Fixing White glazed earthenware Indian pattern
Orissa Pan with low level Pvc flushing cistern ,trap,pipe
13.01 connector with complete accessories including bracket, flushing
pipe,pipe connector etc. all complete set. (Hindware, Parryware,
Classi
Indian pattern W C 530mm Orissa Pan with PVC low level
13.1.1 set 8.00 8.00 8,843.50 70,748.00
flushing cistern all complete set.
Supplying and Fixing Porcelain clay Indian Pattern Comode P or
S trap, Pvc Cistern and Plastic seat cover with pipe connector
13.02
all complete set (Hindware, Parryware, Classica, bolan or
equivalent.)
Indian pattern Comode with PVC low level flushing cistern
13.2.1 set 2.00 2.00 8,547.95 17,095.90
and seat cover all complete set.
Supplying and Fixing Gun metal gate valve/check valve full way
13.12
medium all complete set as per specification and instruction.
13.12.1 (G.M.) check valve 25mm dia nos 2.00 2.00 1,942.35 3,884.70
13.16.1 50 mm dia UPVC 90 degree bend nos 63.00 - 63.00 164.45 10,360.35
13.16.2 50 mm dia UPVC 45 degree bend. nos 21.00 21.00 163.30 3,429.30
13.16.3 50 mm dia UPVC plain Y-Tee. nos 3.00 3.00 189.75 569.25
13.16.4 75 mm dia UPVC vent cowl nos 5.00 5.00 194.35 971.75
13.16.5 75 mm dia UPVC plain. nos 5.00 5.00 304.75 1,523.75
13.16.6 75 mm dia UPVC door tee. nos 8.00 8.00 339.25 2,714.00
13.16.7 75 mm dia UPVC 90 degree bend. nos 18.00 18.00 263.35 4,740.30
13.16.8 75 mm dia UPVC door bend. nos 8.00 8.00 301.30 2,410.40
13.16.9 75 mm dia UPVC 45 degree bend. nos 12.00 12.00 235.75 2,829.00
13.16.10 75 mm dia UPVC Y branch. nos 3.00 3.00 324.30 972.90
13.16.11 75 mm dia UPVC pipe clip. nos 14.00 14.00 33.35 466.90
13.16.12 110 mm dia UPVC vent cowl. nos 3.00 3.00 319.70 959.10
13.16.13 110 mm dia UPVC plain . nos 2.00 2.00 520.95 1,041.90
13.16.14 110 mm dia UPVC Door Tee nos 4.00 4.00 572.70 2,290.80
13.16.15 110 mm dia UPVC 90 degree bend. nos 33.00 33.00 435.85 14,383.05
13.16.16 110 mm dia UPVC Door bend. nos 6.00 6.00 485.30 2,911.80
13.16.17 110 mm dia UPVC 45 degree bend nos 25.00 25.00 396.75 9,918.75
13.16.18 110 mm dia UPVC Y branch nos 6.00 6.00 592.25 3,553.50
13.16.19 110 mm dia UPVC pipe clip nos 40.00 40.00 44.85 1,794.00
Rate as
13.16.20 75x75mm dia.Pvc p-trap Nos 10.00 10.00 317.40 3,174.00 provided by
dudbc
13.16.21 110x110mm dia.Pvc p-trap Nos 10.00 10.00 526.70 5,267.00
13.16.23 5 kg fire extinguiser with pressure guage type all complete set. set 6.00 6.00 8,889.50 53,337.00
13.16.24 CI cover 45x45 cm size (medium).Round type set. nos 18.00 18.00 2,846.25 51,232.50
C I Cover round type 60x60cm, with locking arrangement Rate as
13.16.25 Set 1.00 1.00 2,750.11 2,750.11 provided by
(16kg) complete set. dudbc
Supplying and Fixing HDP Pipe 4 kg/sq.cm all complete set as
13.17 per specification and instruction. (Panchakanya or
equivalent(N.S. )
13.17.1 4 kg/cm2 (110 mm) HDP pipe. Rm 42.00 42.00 646.38 27,147.96
13.17.2 10 kg/cm2 (20 mm) HDP pipe including fittings & layings Rm 200.00 200.00 36.19 7,237.30
Providing and laying non-pressure NP2 class (light duty) RCC
pipes with collars jointed with stiff mixture of cement mortar in
13.18
the proportion of 1:2 (1 cement : 2 find sand) including testing of
joints etc. complete.
150 mm dia NP2 RCC Hume pipe including collar with all
13.18.1 Rm 39.00 39.00 888.20 34,639.80
complete.
Hiring & maintain 4WD vehicle to the project staff as
14 specified in special specification with 300lt. diesel Per month 2.00 2.00 127,276.40 254,552.81
month
Provisional cost for the expenses such as performance
bond commission, insurances (project period+
maintenance period+1 months), consultancy fees, cost of
preparation of as built drawings, cost of quality not to be
15
assurance tests, registration tax for town development job 1.00 1.00 409,888.46 409,888.46
filled by
committee before execution of work etc as per written contractor
instruction of the engineer. (The payment of this item will s
be done according to submitted original copy of related
invoices.)
Provisional Sum
Project Name:- Construction of Thalajung Health Post Building.
Location:- Thalajung, Gorkha FY: 070/71
Remark
Insurance Provision
Project Name:- Construction of Thalajung Health Post Building.
Location:- Thalajung, Gorkha FY: 070/71
1 Insurance premium for the work, plant and materials damage for contract work for all risk including
Riot,Strike, Damage,Malicious damage and Terrorism for contract work of 4 crores for 2 years + 1 year
Maintenance period.
Insurance with value 2,42,80,346.37 Rs. 3.03 per thousand Rs 147,332.72
do for Terrorism Rs. 1.49 per thousand Rs 72,450.74
Premium Rs 219,783.46
for stamp duty Rs 5.00
Premium with stamp duty Rs 219,788.46
VAT 13.00% of premium with stamp duty Rs 28,572.50
Total Amount with VAT Rs 248,360.96
2 Insurance premium for the insurance of owner and consultant staff (named) Rs. 10,00,000.00 per person
for 10 persons with unlimited number of occurances per annum
Personnel accident of 10,00,000.00 for 10 Rs.2.00 per thousand Rs 20,000.00
Do for Terrorism Rs.0.50 per thousand Rs 10,000.00
Premium Rs 30,000.00
For stamp duty Rs 5.00
Premium with stamp duty Rs 30,005.00
VAT 13.00% of premium with stamp duty Rs 3,900.65
Total Amount with VAT Rs 33,905.65 Per Annum
3 Insurance Premium for construction equipments and machines with value of Rs.20,00,000.00 for 2 years
Insurance premium of Rs. 20,00,000.00 Rs.2.03 per thousand Rs 4060.00
Do for Terrorism Rs.1.49 per thousand Rs 2980.00
Premium Rs 7040.00
For stamp duty Rs 5.00
Premium with stamp duty Rs 7045.00
VAT 13.00% of premium with stamp duty Rs 915.85
Total Amount with VAT Rs 7960.85
4 Insurance Premium for third party liability personal only per person Rs.2,00,000.00 for 10 persons for 2
years
P.A. of third party 10 per.=20,00,000.00 Rs. 3.03 per thousand Rs 6060.00
Do for Terrorism Rs. 1.49 per thousand Rs 2980.00
Premium Rs 9040.00
For stamp duty Rs 5.00
Premium with stamp duty Rs 9045.00
VAT 13.00% of premium with stamp duty Rs 1175.85
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
CIVIL WORKS
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
steps 1 2.75 2.75 0.90 0.675 1.67
1 2.45 2.45 0.90 0.675 1.49
1 1.00 1.00 0.90 0.675 0.61
1 1.00 1.00 1.50 0.675 1.01
Appron 1 67.25 67.25 0.505 0.175 5.94
drain 1 72.50 72.50 0.80 0.425 24.65
2.1 Total E/W = 232.00
5 2.3 Sand filling with necessary compaction areas of floor = 217.71 0.150 32.66
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
1 1.00 1.00 1.50 0.15 0.23
Appron 1 67.25 67.25 0.505 0.15 5.09
drain 1 72.50 72.50 0.800 0.15 8.70
Floor area – areas of floor = 217.71 0.15 32.66
ramp 1 5.40 5.40 1.80 0.15 1.46
3.1.2 Total stone soling = 70.89
7 Masonary works : -
7.1 Stone masonry in 1:6 c/s mortar in sub structure
Foundation
Toe wall 1 161.85 161.85 0.35 0.60 33.99
veranda 1 17.60 17.60 0.35 0.975 6.01
Ramp side wall 1 5.40 5.40 0.35 0.675 1.28
steps 1 6.20 6.20 0.90 0.600 3.35
1 6.20 6.20 0.60 0.15 0.56
1 6.20 6.20 0.30 0.15 0.28
1 1.00 1.00 1.50 0.600 0.90
1 1.00 1.00 1.20 0.15 0.18
1 1.00 1.00 0.90 0.15 0.14
3.6 Total = 46.69
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
7.3 1st class B/W in 1:6 c/s mortar above ground floor -
Grid wall 11 3.25 35.75 0.23 2.85 23.39
11 3.85 42.35 0.23 2.85 27.71
2 2.05 4.10 0.23 2.85 2.68
1 1.925 1.93 0.23 2.85 1.26
living / kitchen partation 3 3.36 10.08 0.23 3.075 7.13
multipurpose hall wall 1 6.96 6.96 0.23 3.075 4.92
Top floor 2 3.25 6.50 0.23 2.85 4.25
2 3.85 7.70 0.23 2.85 5.04
2 2.05 4.10 0.23 2.85 2.68
119.47
Deduction : -
D1A 2 1.20 2.40 0.23 2.60 -1.44
D2A 2 1.00 2.00 0.23 2.60 -1.20
D3 4 0.90 3.60 0.23 2.60 -2.15
D3A 1 0.90 0.90 0.23 2.10 -0.43
D4A 3 0.75 2.25 0.23 2.60 -1.35
W1A 8 1.80 14.40 0.23 1.70 -5.63
W1B 1 1.80 1.80 0.23 1.20 -0.50
W2B 3 1.20 3.60 0.23 1.70 -1.41
W3 3 0.60 1.80 0.23 1.40 -0.58
V1 2 1.80 3.60 0.23 0.60 -0.50
DW 1 0.975 0.975 0.23 2.60 -0.58
1 1.225 1.225 0.23 1.70 -0.48
DW1 1 0.975 0.975 0.23 2.60 -0.58
1 1.225 1.225 0.23 1.70 -0.48
1st floor parapet wall at veranda 1 20.23 20.23 0.23 0.80 3.72
brick pillar on terrace 15 0.35 5.25 0.35 1.10 2.02
parapet wall at terrace 1 53.20 53.20 0.23 0.80 9.79
brick pillar on top terrace 6 0.35 2.10 0.35 1.10 0.81
parapet wall at top terrace 1 18.30 18.30 0.23 0.80 3.37
3.3 Net B/W in 1st and second floor = 81.46
7.4 1st class B/W in 1:4 c/s mortar in ground floor
super structure
auto clave partation 1 3.36 3.36 0.115 3.075 1.19
sluice partation 1 3.96 3.96 0.115 3.075 1.40
toilet 1 3.00 3.00 0.115 3.075 1.06
Deduction :-
D2B 1 1.00 1.00 0.115 2.60 -0.30
D4A 1 0.75 0.75 0.115 2.60 -0.22
3.4 Net B/W = 3.13
7.5 1st class B/W in 1:4 c/s mortar above ground floor -
toilet/kitchen partation 3 2.76 8.28 0.115 3.075 2.93
3.5 Net B/W = 2.93
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
Ramp side wall 1 5.40 5.40 0.35 0.075 0.14
steps 1 2.75 2.75 0.90 0.075 0.19
1 2.45 2.45 0.90 0.075 0.17
1 1.00 1.00 0.90 0.075 0.07
1 1.00 1.00 1.50 0.075 0.11
Appron 1 67.25 67.25 0.505 0.10 3.40
Drain 1 72.50 72.50 0.800 0.075 4.35
4.1 Total p.c.c. 1:3:6 = 19.24
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
in dispensary 1 2.25 2.25 0.60 0.075 0.10
waiting 1 4.50 4.50 0.60 0.075 0.20
FF Kitchen sink slab area 2 4.32 8.64 0.60 0.075 0.39
FF pantry sink slab area 1 4.32 4.32 0.60 0.075 0.19
GF Sill band (wall length-opening) 1 118.40 118.40 0.325 0.075 2.89
FF Sill band 1 108.32 108.32 0.325 0.075 2.64
GF lintel band (wall length) 1 135.70 135.70 0.23 0.150 4.68
FF Lintel band (wall length) 1 119.47 119.47 0.23 0.150 4.12
Copping of parapet wall at top terrace
1 20.40 20.40 0.40 0.075 0.61
Copping of parapet wall at lower
terrace 1 78.68 78.68 0.40 0.075 2.36
4.3 Net R.C.C. Work = 181.90
13 Form work -
Column -
F1 8 6.00 48.00 – 0.15 7.20
F2 9 6.80 61.20 – 0.15 9.18
F3 3 7.60 22.80 – 0.15 3.42
F4 4 8.00 32.00 – 0.175 5.60
F5 2 9.20 18.40 – 0.175 3.22
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
4 1.350 5.40 1.20 – 6.48
Steps side 0.5x42 21 0.300 6.30 – 0.150 0.95
Slab for sink
sink slab of Dressing, auto clave, Delivery 3 3.36 10.08 0.675 – 6.80
Sluice 1 3.00 3.00 0.675 – 2.03
counter slab in registration 1 2.00 2.00 0.675 – 1.35
in dispensary 1 2.25 2.25 0.675 – 1.52
waiting 1 4.50 4.50 0.675 – 3.04
FF Kitchen sink slab area 2 4.32 8.64 0.675 – 5.83
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
FF pantry sink slab area 1 4.32 4.32 0.675 – 2.92
GF Sill band (wall length-opening) 2 118.400 236.80 – 0.075 17.76
1 118.400 118.40 0.095 – 11.25
FF Sill band 2 108.320 216.64 – 0.075 16.25
1 108.320 108.32 0.095 – 10.29
GF lintel band (wall length) 2 135.700 271.40 – 0.150 40.71
FF Lintel band (wall length-partation) 2 119.470 238.94 – 0.150 35.84
parapet wall copping side bar 2 20.40 40.80 – 0.150 6.12
2 78.68 157.36 – 0.150 23.60
top floor column 17 1.40 23.80 – 1.200 28.56
6 1.40 8.40 – 1.200 10.08
6.1 Total Formwork = 1556.04
14 Plaster work :-
a 20 mm thick c/s plaster (1:4)
Inside
Ground floor
Dressing (3.36+3.96)*2 1 14.64 14.64 – 3.075 45.02
EPI/MCH (3.36+3.96)*2 1 14.64 14.64 – 3.075 45.02
Examination (3.36+2.76)*2 1 12.24 12.24 – 3.075 37.64
lobby (3.60+1.74)*2-1.74 1 8.94 8.94 – 3.075 27.49
Blood store (3.36+1.98)*2 1 10.68 10.68 – 3.075 32.84
DOTS clinic (3.36+2.155)*2 1 11.03 11.03 – 3.075 33.92
Dispensary (3.36+2.155)*2 1 11.03 11.03 – 3.075 33.92
Administration (3.36+3.96)*2 1 14.64 14.64 – 3.075 45.02
Registration partation 2 2.56 5.12 – 1.800 9.22
Waiting 1 16.19 16.19 – 3.075 49.78
lobby (1.82+5.695)*2-1.44 1 13.59 13.59 – 3.075 41.79
store (1.86+3.12)*2 1 9.96 9.96 – 3.075 30.63
scrub + lobby area (5.155+2.351)*2 1 15.01 15.01 – 3.075 46.16
stair case area (3.36+4.62)*2 1 15.96 15.96 – 3.075 49.08
pre/post delivery (5.345+3.96)*2 1 18.61 18.61 – 3.075 57.23
staff utility area (3.36+2.59)*2 1 11.90 11.90 – 3.075 36.59
delivery (3.36+3.96)*2 1 14.64 14.64 – 3.075 45.02
sluice (1.495+3.96)*2 1 10.91 10.91 – 3.075 33.55
beam 2*2 4 3.36 13.44 – 0.230 3.09
1*2 2 1.685 3.37 – 0.230 0.78
1*2 2 1.44 2.88 – 0.230 0.66
1*2 2 1.20 2.40 – 0.230 0.55
1*2 2 3.85 7.70 – 0.230 1.77
First floor
living cum dining (3.36+5.16)*2 2 17.04 34.08 – 3.075 104.80
kitchen (2.16+2.76)*2 2 9.84 19.68 – 3.075 60.52
toilet (1.08+2.76)*2 2 7.68 15.36 – 3.075 47.23
Bed room (3.36+3.96)*2 2 14.64 29.28 – 3.075 90.04
pantry (2.08+2.555)*2 1 9.27 9.27 – 3.075 28.51
toilet (1.08+2.555)*2 1 7.27 7.27 – 3.075 22.36
Open area (3.36+3.076)*2-1.2 1 11.67 11.67 – 3.075 35.89
stair case area 1 15.96 15.96 – 3.075 49.08
multi purpose hall (6.96+5.94)*2 1 25.80 25.80 – 3.075 79.34
beam 5*2 10 3.36 33.60 – 0.230 7.73
1*2 2 3.85 7.70 – 0.230 1.77
1*2 2 1.685 3.37 – 0.230 0.78
Top floor
stair case area 1 19.54 19.54 – 3.075 60.09
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
Total inside plaster = 1294.91
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
Deduction
GF DW1 0.5 1.80 0.90 – 2.60 -2.34
0.5 1.15 0.58 – 1.45 -0.83
D1 1 1.20 1.20 – 2.60 -3.12
D1A 3 1.20 3.60 – 2.60 -9.36
D1B 1 1.20 1.20 – 2.60 -3.12
D2 3.5 1.00 3.50 – 2.60 -9.10
D2A 3.5 1.00 3.50 – 2.60 -9.10
D2B 2 1.00 2.00 – 2.60 -5.20
D2C 1 1.00 1.00 – 2.60 -2.60
D2D 0 1.00 0.00 – 2.60 0.00
D3 6 0.90 5.40 – 2.60 -14.04
D3A 0.5 0.90 0.45 – 2.10 -0.95
D4 0 0.75 0.00 – 1.80 0.00
D4A 4 0.75 3.00 – 2.60 -7.80
W1 4 1.80 7.20 – 1.40 -10.08
W1A 4 1.80 7.20 – 1.70 -12.24
W1B 1 1.80 1.80 – 1.20 -2.16
W2 1.5 1.20 1.80 – 1.40 -2.52
W2A 1.5 1.20 1.80 – 1.40 -2.52
W2B 1.5 1.20 1.80 – 1.70 -3.06
W3 1.5 0.60 0.90 – 1.40 -1.26
V1 1 1.80 1.80 – 0.60 -1.08
V2 5 1.20 6.00 – 0.60 -3.60
V2A 3 1.20 3.60 – 0.60 -2.16
V3 0.5 0.60 0.30 – 0.80 -0.24
DW 0.5 0.975 0.488 – 2.60 -1.27
0.5 1.225 0.613 – 1.70 -1.04
DW1 0.5 0.975 0.488 – 2.60 -1.27
0.5 1.225 0.613 – 1.70 -1.04
Total Deduction -113.10
7.1 Total 20mm wall plaster = 1181.81
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
0.5 1.15 0.58 – 1.45 -0.83
D1A 1 1.20 1.20 – 2.60 -3.12
D2 0.5 1.00 0.50 – 2.60 -1.30
D2A 0.5 1.00 0.50 – 2.60 -1.30
D3 1 0.90 0.90 – 2.60 -2.34
D3A 0.5 0.90 0.45 – 2.10 -0.95
W1 4 1.80 7.20 – 1.40 -10.08
W1A 4 1.80 7.20 – 1.70 -12.24
W1B 1 1.80 1.80 – 1.20 -2.16
W2 0.5 1.20 0.60 – 1.40 -0.84
W2A 0.5 1.20 0.60 – 1.40 -0.84
W2B 1.5 1.20 1.80 – 1.70 -3.06
W3 1.5 0.60 0.90 – 1.40 -1.26
V1 1 1.80 1.80 – 0.60 -1.08
V2 3 1.20 3.60 – 0.60 -2.16
V3 0.5 0.60 0.30 – 0.80 -0.24
DW 0.5 0.975 0.488 – 2.60 -1.27
0.5 1.225 0.613 – 1.70 -1.04
DW1 0.5 0.975 0.488 – 2.60 -1.27
0.5 1.225 0.613 – 1.70 -1.04
Total outside plaster = 899.31
FF wall skirting 1 63.36 63.36 – 0.20 12.67
7.2 Total 12.5mm plaster = 911.98
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
stair cover slab 1 3.36 3.36 6.41 – 21.54
Total inside ceiling 361.66
Outside ceiling
GF & FF slab projection 2 69.79 139.58 0.90 – 125.62
FF veranda ceiling 1 10.855 10.86 2.45 – 26.61
1 7.255 7.26 2.275 – 16.52
TF slab projection 1 25.12 25.12 0.900 – 22.61
beam 5*2 10 3.36 33.60 – 0.230 7.73
2*2 4 2.045 8.18 – 0.230 1.88
Total outside ceiling 200.97
7.3 Total ceiling plaster = 562.63
16 3mm cement punning in (1:1) Same as below plinth & step plaster 175.50
FF wall skirting 1 63.36 63.36 – 0.20 12.67
Copping of parapet wall FF+SF 1 78.68 78.68 0.400 – 31.47
Copping of parapet wall TF 1 20.40 20.40 0.40 – 8.16
8.2 Total punning = 227.80
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
kitchen skirting 2 9.84 19.68 – 0.150 2.95
pantry skirting 1 9.27 9.27 – 0.150 1.39
FF Kitchen sink slab area 2 4.32 8.64 0.675 – 5.83
FF pantry sink slab area 1 4.32 4.32 0.675 – 2.92
GF toilet 1 1.20 1.20 1.68 – 2.02
FF toilet 2 1.080 2.160 2.76 – 5.96
1 1.080 1.080 2.555 – 2.76
8.4 Total floor tile = 41.06
20 Painting work
a 2 coats readymade enamel paints over one coats primer factor
Door GF DW1 1 1.80 1.80 2.25 2.60 10.53
DW1 1 0.975 0.98 2.25 2.60 5.70
DW 1 0.975 0.98 2.25 2.60 5.70
D1 1 1.20 1.20 2.25 2.60 7.02
D1A 4 1.20 4.80 2.25 2.60 28.08
D1B 1 1.20 1.20 2.25 2.60 7.02
D2 4 1.00 4.00 2.25 2.60 23.40
D2A 4 1.00 4.00 2.25 2.60 23.40
D2B 2 1.00 2.00 2.25 2.60 11.70
D2C 1 1.00 1.00 2.25 2.60 5.85
D3 7 0.90 6.30 2.25 2.60 36.86
D3A 1 0.90 0.90 2.25 2.10 4.25
D4A 4 0.75 3.00 2.25 2.60 17.55
W1 8 1.80 14.40 1.125 1.40 22.68
W1A 8 1.80 14.40 1.125 1.70 27.54
W1B 2 1.80 3.60 1.125 1.20 4.86
W2 2 1.20 2.40 1.125 1.40 3.78
W2A 2 1.20 2.40 1.125 1.40 3.78
W2B 3 1.20 3.60 1.125 1.70 6.89
W3 3 0.60 1.80 1.125 1.40 2.84
V1 2 1.80 3.60 1.125 0.60 2.43
V2 8 1.20 9.60 1.125 0.60 6.48
V2A 3 1.20 0.60 1.125 0.60 0.41
V3 1 0.60 0.60 1.125 0.80 0.54
Window GF DW1 1 1.15 1.15 1.125 1.45 1.88
DW1 1 1.225 1.225 1.125 1.70 2.34
DW 1 1.225 1.23 1.125 1.70 2.34
on eaves board both side 2 area 6.95 13.90
same as area of grill 62.07 62.07
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
GF inside wall upto 1.2 m ht. 1 229.73 229.73 1.20 275.68
9.1 Total enamel paint = 627.50
b Two coat Distemper paint In inner ceiling & inner walls 1656.57
Deduction opening -113.10
deduction wall tile area -54.18
9.2 Total distemper paint 1489.29
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
D1 1 1.075 1.075 2.04 2.19
D1A 1 1.075 1.075 2.04 2.19
D1B 1 1.075 1.075 2.04 2.19
D2 3 0.875 2.625 2.04 5.35
D2A 3 0.875 2.625 2.04 5.35
D2C 1 0.875 0.875 2.04 1.78
D3 5 0.775 3.875 2.04 7.90
D3A 1 0.775 0.775 2.04 1.58
D4A 3 0.625 1.875 2.04 3.82
10.03 Total 32.35
e Glazed shutter
W1 8 1.625 13.000 1.275 16.58
W1A 8 1.625 13.000 1.275 16.58
W1B 2 1.625 3.250 1.275 4.14
W2B 3 1.075 3.225 1.525 4.92
W2 2 1.075 2.150 1.275 2.74
W3 3 0.475 1.425 1.275 1.82
W2A 2 1.075 2.150 1.275 2.74
V1 2 1.625 3.250 0.475 1.54
V2 8 1.075 8.600 0.475 4.09
V2A 3 1.075 3.225 0.475 1.53
V3 1 0.475 0.600 0.675 0.41
Window GF DW1 1 1.100 1.100 1.275 1.40
DW1 1 1.175 1.175 1.525 1.79
DW 1 1.175 1.175 1.525 1.79
10.05 Total 62.07
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
GF veranda 1 20.30 20.30 – 0.20 4.06
1 6.02 6.02 – 0.20 1.20
1 5.58 5.58 – 0.20 1.12
1 2.83 2.83 – 0.20 0.57
10.08 Total 6.95
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
24 26 Guage (0.41 mm ) Colour C.G.I. sheet roofing work.
1 20.30 20.30 3.00 – 60.90
1 3.22 3.22 3.00 – 9.66
1 2.43 2.43 3.00 – 7.29
11.01 Total = 77.85
26 Black pipe iron work of medium class for rafter, purlin, post
80 mm dia. Post 11 3.90 42.90 8.48 kg/m 363.79
50 mm dia. Rafter 9 2.90 26.10 5.10 kg/m 133.11
2 4.00 8.00 5.10 kg/m 40.80
40 mm dia. Purlin 4 17.50 70.00 3.61 kg/m 252.70
4 4.62 18.48 3.61 kg/m 66.71
4 4.00 16.00 3.61 kg/m 57.76
nutbolt, plate @ 10% = 91.49
11.03 Total = 1006.36
Item Total
S.N. Description No Length Breadth Height Quantity
No Length
11.06 Total = 198.16
Government of Nepal
Ministry of Urban Development
Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Remarks
L.S.
L.S.
M3
,,
,,
,,
,,
M3
,,
,,
Remarks
,,
,,
,,
,,
,,
,,
M3
M3
M3
M3
,,
,,
,,
,,
M3
,,
,,
,,
,,
,,
Remarks
,,
,,
,,
,,
,,
M3
M3
,,
,,
,,
,,
,,
,,
,,
,,
M3
M3
,,
,,
,,
,,
,,
,,
,,
,,
M3
M3
M3
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M3
Remarks
M3
,,
,,
,,
,,
,,
,,
,,
,,
M3
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M3
M3
,,
,,
M3
,,
M3
M3
M3
M3
,,
,,
,,
,,
,,
,,
Remarks
,,
,,
,,
,,
,,
,,
,,
M3
M3
,,
M3
M3
,,
,,
,,
,,
,,
,,
,,
,,
,,
M3
,,
,,
,,
,,
M3
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M3
,,
,,
Remarks
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M3
Kg
Mt
M2
,,
,,
,,
,,
M2
,,
,,
M2
,,
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
Remarks
,,
,,
M2
,,
,,
,,
,,
,,
Remarks
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
Remarks
M2
Remarks
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
Remarks
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
,,
,,
,,
,,
,,
,,
,,
,,
Remarks
,,
M2
M2
,,
,,
,,
,,
,,
M2
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
M2
M2
,,
,,
,,
M2
,,
,,
,,
,,
,,
M2
M2
,,
Remarks
,,
,,
,,
,,
,,
,,
,,
M2
M2
,,
,,
M2
M2
,,
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
Remarks
,,
M2
M2
,,
,,
M2
M2
,,
,,
M2
M3
M3
M2
,,
,,
,,
,,
,,
M2
Remarks
M2
,,
,,
,,
,,
,,
,,
,,
,,
M2
M2
,,
,,
,,
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
M2
,,
M2
M2
,,
,,
,,
,,
,,
,,
,,
,,
,,
,,
M2
Remarks
M2
,,
,,
,,
M2
M2
Kg
Remarks
M2
,,
,,
M2
Rm
Rm
Kg
,,
,,
,,
,,
,,
,,
Kg
M2
M2
Kg
Kg
Kg
Kg
Kg
Remarks
Rm
kg
Rm
M2
,,
,,
,,
,,
,,
M2
month
job
month
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
No Length
1 E/W in excavation in foundation -
column foundation - F1 6 1.30 7.80 1.30 1.725 17.49 M3
wall foundation -
Grid A-A, B-B, C-C 3 3.32 9.96
Grid 1-1, 2-2 2 4.86 9.72
19.68 0.60 0.825 9.74 M3
Ramp side wall 2 5.40 10.80 0.35 0.675 2.55 ,,
steps 1 1.50 1.50 0.60 0.675 0.61 ,,
2.1 Total E/W = 30.39 M3
3 2.3 Sand filling with necessary compaction areas of floor = 31.74 0.150 4.76 M3
4 Stone soling
column foundation - F1 6 1.30 7.80 1.30 0.150 1.52 M3
Below beam
Grid A-A, B-B, C-C 3 4.27 12.81
Grid 1-1, 2-2 2 6.76 13.52
26.33 0.35 0.150 1.38 M3
Ramp side wall 2 5.40 10.80 0.35 0.150 0.57 ,,
steps 1 1.50 1.50 0.60 0.150 0.14 ,,
Floor area area = 31.74 0.150 4.76 ,,
ramp 1 5.40 5.40 0.80 0.150 0.65 ,,
3.1.2 Total soling = 9.02 M3
5 Masonary works : -
5.1 Stone masonry in 1:6 c/s mortar in sub structure
Foundation wall 1 26.33 26.33 0.35 0.45 4.15 M3
Ramp side wall 2 5.40 10.80 0.35 0.600 2.27 ,,
steps 1 1.50 1.50 0.60 0.600 0.54 ,,
1 1.50 1.50 0.30 0.150 0.07 ,,
3.6 Total = 7.03 M3
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
No Length
wall 3 4.27 12.81 0.23 2.845 8.38 M3
2 2.91 5.82 0.23 2.845 3.81 ,,
2 3.85 7.70 0.23 2.845 5.04 ,,
Deduction for opening
D2A 2 1.00 2.00 0.23 2.60 -1.20 M3
D2D 1 1.00 1.00 0.23 2.60 -0.60 ,,
W2 2 1.20 2.40 0.23 1.40 -0.77 ,,
V2 1 1.20 1.20 0.23 0.60 -0.17 ,,
V3 5 0.60 3.00 0.23 0.80 -0.55 ,,
parapet wall at terrace 1 24.60 24.60 0.23 0.80 4.53 ,,
3.2 Total brick masonry 1:6 = 18.47 M3
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
No Length
9 5.1 Steel reinforcement for R.C.C. work - 1.75% of Total R.C.C. = 2774.98 Kg
2.77 Mt
10 Form work -
Column base - F1 6 5.20 31.20 0.15 4.68 M2
Column upto plinth F1 column 6 1.40 8.40 1.60 13.44 ,,
Foundation beam 2 26.33 52.66 0.30 15.80 ,,
Tie beam 2 26.33 52.66 0.30 15.80 ,,
Ground floor Column 6 1.40 8.40 3.075 25.83 ,,
Floor beam :- GF 2 26.33 52.66 0.230 12.11 ,,
Slab :- Ground floor - 1 9.01 9.01 6.170 – 55.59 ,,
Slab side bar 1 30.36 30.36 – 0.125 3.80 ,,
Sill band 2 23.33 46.66 0.075 3.50 ,,
Lintel band 2 26.33 52.66 0.150 7.90 ,,
parapet wall copping side bar 2 24.60 49.20 0.150 7.38 ,,
6.1 Total Formwork = 165.83 M2
11 Plaster work :-
a 20 mm thick c/s plaster (1:4)
Inside female toilet 1 15.12 15.12 – 3.075 46.49 M2
2 3.07 6.14 – 1.800 11.05 ,,
4 1.50 6.00 – 1.800 10.80 ,,
Inside male toilet 1 11.20 11.20 – 3.075 34.44 ,,
1 7.54 7.54 – 3.075 23.19 ,,
1 1.65 1.65 – 1.800 2.97 ,,
disabled toilet 1 7.78 7.78 – 3.075 23.92 ,,
urinal partation 4 0.75 3.00 – 1.500 4.50 ,,
outside corridor 1 6.76 6.76 – 3.075 20.79 ,,
beam 1*2 2 1.20 2.40 – 0.230 0.55 ,,
Deduction
D2A 2 1.00 2.00 – 2.60 -5.20 M2
D2D 0.5 1.00 0.50 – 2.60 -1.30 ,,
D4 5 0.75 3.75 – 1.80 -6.75 ,,
W2 1 1.20 1.20 – 1.40 -1.68 ,,
V2 0.5 1.20 0.60 – 0.60 -0.36 ,,
V3 2.5 0.60 1.50 – 0.80 -1.20 ,,
Floor area – areas of floor = 31.74 31.74 ,,
7.1 Total 20mm plaster = 193.95 M2
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
No Length
Inside ceiling
Female toilet 1 3.07 3.07 4.49 – 13.78 M2
male toilet 1 2.24 2.24 3.36 – 7.53 ,,
1 1.65 1.65 2.12 – 3.50 ,,
disabled toilet 1 1.65 1.65 2.24 – 3.70 ,,
outside corridor 1 2.51 2.51 1.25 3.14 ,,
outside ceiling 2 9.01 18.02 0.60 10.81 ,,
2 4.97 9.94 0.60 5.96 ,,
7.3 Total ceiling plaster = 48.42 M2
12 3mm cement punning in (1:1) Same as below plinth & step plaster 14.83 M2
Copping of parapet wall 1 24.60 24.60 0.40 9.84 ,,
8.2 Total punning = 24.67 M2
15 Painting work
a 2 coats readymade enamel paints over one coats primer factor
D2A 2 1.00 2.00 2.25 2.60 11.70 M2
D2A1 1 1.00 1.00 2.25 2.60 5.85 ,,
D4 5 0.75 3.75 2.25 2.10 17.72 ,,
W2 2 1.20 2.40 1.125 1.40 3.78 ,,
V2 1 1.20 1.20 1.125 0.60 0.81 ,,
V3 5 0.60 3.00 1.125 0.80 2.70 ,,
same as area of grill 3.66 3.66 ,,
9.1 Total enamel paint = 46.22 M2
b Two coat Distemper paint Same as inside plaster + inside ceiling area 225.60 M2
Deduction of Inside tile wall area -85.87 ,,
Deduction of Inside tile floor area -28.51 ,,
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
No Length
Deduction of punning area -3.14 ,,
9.2 Total distemper paint 108.08 M2
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
No Length
16 Doors & windows Works
a Salwood Doors chaukhat
D2A 2 7.20 14.40
D2A1 1 7.20 7.20
D4 5 4.95 24.75
W2 2 5.20 10.40
V2 1 3.60 3.60
V3 5 2.80 0.60
60.95 0.125 0.075 0.571 M3
10.01 Total 0.571 M3
c Glazed shutter
W2 2 1.075 2.150 1.275 2.74
V2 1 1.075 1.075 0.475 0.51
V3 5 0.475 0.600 0.675 0.41
10.05 Total 3.66 M2
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N Description No Length Breadth Height Quantity Remarks
no length
1 E/W cutting by machine
Site levelling 1 35.00 35.00 7.50 1.20 315.00
1 22.00 22.00 15.00 1.70 561.00
1 15.00 15.00 5.00 0.75 56.25
1 24.00 24.00 2.70 0.20 12.96
approach road leveling 1 60.00 60.00 4.00 0.50 120.00
1.1.4 Total E/W = 1065.21 M3
4 P.C.C. 1:3:6
Gate pillar 3 0.90 2.70 0.90 0.075 0.18
For flag stone portion 1 area= 60.00 0.05 3.00
Compound wall 1 25.00 25.00 0.60 0.075 1.13
4.1 Total= 4.31 M3
5 P.C.C. 1:2:4
side Retaining Wall 1 19.00 19.00 0.83 0.100 1.57
Retaining Wall top 1 19.00 19.00 0.45 0.05 0.43
For fixing Concrete pole 126 0.30 37.80 0.30 0.450 5.10
deduction 126 0.125 15.75 0.075 0.45 -0.53
4.2 Total= 6.57 M3
Item Total
S.N Description No Length Breadth Height Quantity Remarks
no length
Compound above retaining wall 1 20.00 20.00 0.35 1.500 10.50
3.6 Total stone masonry = 47.42 M3
8 Reinforcement
Footing mesh 12mm dia 14 0.90 12.60 0.89 kg/m 11.21
16 mm dia for gate column 12 3.20 38.40 1.58 kg/m 60.67
8mm dia stirrups 57 1.07 60.99 0.39 kg/m 23.79
16 mm dia for gate column 3 2.60 7.80 1.58 kg/m 12.32
In Kerb stone 1 1% of p.c.c 274.75
5.1 Total Reinforcement = 382.75 kg
Item Total
S.N Description No Length Breadth Height Quantity Remarks
no length
sub gate 1 0.90 0.30 9.80 Kg/m2 2.65
Hinges, tower bolt, aldrops, plates etc. @ 10% of total weight 17.29
11.09 Total= 190.19 Kg
Grou
S.N. Item No Description of Work Quantity Unit Remarks
Indian pattern W C 530mm Orissa Pan with PVC low level flushing
1 13.1.1 8.00 set
cistern all complete set.
Indian pattern Comode with PVC low level flushing cistern and seat
2 13.2.1 2.00 set
cover all complete set. ###
Indian pattern Porcelain clay white glaze 55X40 cm Wash Basin with
3 13.3.1 6.00 set
pedestal and swan type piller cock complete set.
Porcelain clay white glaze Indian Pattern 55X40 cm size , wash basin
4 13.3.2 with pedestal and central hole Aerator type basin mixer etc all 3.00 Set
complete.
Indian pattern Porcelain clay white glaze Oval Wash Basin 50x40cm
5 13.3.3 with inbuilt hole/over counter/under counter and swan type piller cock 4.00 set
complete set. ###
Indian pattern White glazed porceline clay Urinal 46.5X31.5X26.5cm
6 13.3.4 2.00 Set
with necessary accessories all complete set .
Porcelain clay white glaze Indian Pattern 68X30cm size Urinal
7 13.3.5 1.00 Set
partation all complete set .
Kitchen sink stainless steel 900x450x200mm depth with drain board
8 13.3.6 2.00 Set
1mm thickness with Aerator/swan type sink cock.
10 13.4.1 Stainless steel Scrub sink 1.5mt length,deep 500mm+150mm splash 1.00 set
Supplying and Fixing Indian pattern C.P. valves with wall flange
E 13.5
Including c.p. nipple all complete set.
15mm dia.6mm wall thickness insulation for hot water pipe all
38 13.13.1 6.00 Rm
complete.
39 13.13.2 20mm dia,6mm thick wall thickness insulation for hot water pipe 42.00 Rm
Supplying and Fixing solar water heater with 3.0 k.w. electric
booster with thermostat all complete set. Technical spe.:-Inside
N 13.14
boiler M.S sheet 4.0 mm thick with Expansion joint(over lap joint)
in cover and bottom with 25x25x3 mm angle welded,4.0 kg/sq
40 13.14.1 300 lit. 3 panel solar heater fixing with electric booster all complete. 1.00 Set
Supplying and Fixing uPVC pipe 6kg/sqcm all complete set as per
O 13.15 specification and instruction. (Dwv,Panchakanya,SN-4,
Prince,Supreme )
41 13.15.1 50mm PVC pipe of 6 kg/cm2 42.00 Rm
42 13.15.2 75mm PVC pipe of 6 kg/cm2 92.00 Rm
43 13.15.3 110mm PVC pipe of 6 kg/cm2 193.00 Rm
Supplying and Fixing UPVC specials with O ring rubber
washer,Pvc liquid(Solvent cement), Pvc cream,Pvc pipe clips with
P 13.16
screw,Vent cowl all complete set as per specification and
instruction. (Panchakanya,Prince,Supreme )
44 13.16.1 50 mm dia UPVC 90 degree bend 63.00 nos
45 13.16.2 50 mm dia UPVC 45 degree bend. 21.00 nos
46 13.16.3 50 mm dia UPVC plain Y-Tee. 3.00 nos
47 13.16.4 75 mm dia UPVC vent cowl 5.00 nos
48 13.16.5 75 mm dia UPVC plain. 5.00 nos
49 13.16.6 75 mm dia UPVC door tee. 8.00 nos
50 13.16.7 75 mm dia UPVC 90 degree bend. 18.00 nos
51 13.16.8 75 mm dia UPVC door bend. 8.00 nos
52 13.16.9 75 mm dia UPVC 45 degree bend. 12.00 nos
53 13.16.10 75 mm dia UPVC Y branch. 3.00 nos
54 13.16.11 75 mm dia UPVC pipe clip. 14.00 nos
55 13.16.12 110 mm dia UPVC vent cowl. 3.00 nos
56 13.16.13 110 mm dia UPVC plain . 2.00 nos
57 13.16.14 110 mm dia UPVC Door Tee 4.00 nos
58 13.16.15 110 mm dia UPVC 90 degree bend. 33.00 nos
59 13.16.16 110 mm dia UPVC Door bend. 6.00 nos
60 13.16.17 110 mm dia UPVC 45 degree bend 25.00 nos
61 13.16.18 110 mm dia UPVC Y branch 6.00 nos
62 13.16.19 110 mm dia UPVC pipe clip 40.00 nos
63 13.16.20 75x75mm dia.Pvc p-trap 10.00 Nos
64 13.16.21 110x110mm dia.Pvc p-trap 10.00 Nos
65 13.16.22 110x75 red. Socket 10.00 Nos
66 13.16.23 5 kg fire extinguiser with pressure guage type all complete set. 6.00 set
67 13.16.24 CI cover 45x45 cm size (medium).Round type set. 18.00 nos
C I Cover round type 60x60cm, with locking arrangement (16kg)
68 13.16.25 1.00 Set
complete set.
Supplying and Fixing HDP Pipe 4 kg/sq.cm all complete set as per
Q 13.17
specification and instruction. (Panchakanya or equivalent(N.S. )
69 13.17.1 4 kg/cm2 (110 mm) HDP pipe. 42.00 Rm
70 13.17.2 10 kg/cm2 (20 mm) HDP pipe including fittings & layings 200.00 Rm
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N.
no Description No Length Breadth Height Quantity
length
1 E/w excavation in all kinds of soil.
2.1 Found. 1 4.20 4.20 1.86 2.20 17.19
Item Total
S.N.
no Description No Length Breadth Height Quantity
length
8.2 same as plaster area 27.38
Government of Nepal
Ministry of Urban Development
Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Remarks
m3
m2
m3
m3
kg
m2
m2
m2
Remarks
m2
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
3 PCC (1:2:4)
base 1 0.90 0.90 0.90 0.10 0.08
4.2 Total 0.08 1.54 m3
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
3 PCC (1:2:4)
base 1 1.05 1.05 1.05 0.10 0.11
fixing for pump 1 0.45 0.45 0.45 0.075 0.02
4.2 Total 0.13 0.25
4 RCC works
4.1 PCC (1:1.5:3)
cover 1 1.35 1.35 1.35 0.10 0.18
4.3 Total 0.18 0.36
4.2 5.1 Reinforcement bar works 0.18 75.00 13.67 27.34
Cover(75 kg/m3)
4.3 Form works
cover side 4 1.35 5.40
base ,, 4 1.05 4.20
9.60 0.10 0.96
base 1 0.90 0.90 0.90 0.81
6.1 Total 1.77 3.54
5 Brick works in 1:4 c/s mortar
long wall 2 1.05 2.10
s.w. 2 0.60 1.20
3.30 0.23 0.90 0.68
deduct door 1 0.60 0.60 0.23 0.90 -0.12
3.4 Total 0.56 1.12
Government of Nepal
Ministry of Urban Development
Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Remarks
m3
m3
m3
m3
kg
m2
m3
m2
L.S.
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N. Description No Length Breadth Height Quantity Remarks
no length
1 E/w excavation in all kinds of soil
2.1 Found. 1 3.70 3.70 2.70 2.55 25.47 m3
3 PCC (1:3:6)
4.1 1 3.70 3.70 2.70 0.05 0.50 m3
4 RCC works
PCC (1:1.5:3) for RCC with silica
a
cement admixture
base 1 3.35 3.35 2.35 0.15 1.18
cover 1 3.35 3.35 2.35 0.15 1.18
Side walls 2 3.20 6.40 0.175 2.30 2.58
2 2.20 4.40 0.175 2.30 1.77
Haunching 1 10.80 10.80 area = 0.01 0.12
4 2.15 8.60 area = 0.01 0.10
4.4 Total 6.93 m3
c Form works
Side walls inner 2 3.00 6.00
2 2.00 4.00
10.00 2.30 23.00
cover 1 3.00 3.00 2.00 6.00
6.1 Total 29.00 m2
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N.
no Description No Length Breadth Height Quantity Remarks
length
1 E/w excavation in all kinds of soil.
Found. 0.25 3.14 1.50 1.50 3.00 5.30
(3.14xd2/4xh)
19" wall 0.25 3.14 1.50 1.50 0.450 0.79
0.25 3.14 0.55 0.55 0.450 -0.11 (-)
Steps 1 0.60 0.60 1.05 0.20 0.13
2.1 Total 6.11 m3
5 Rcc works
5.1 PCC (1:1.5:3)
Lower Band 0.25 3.14 1.50 1.50 0.10 0.18
0.25 3.14 0.55 0.55 0.10 -0.02 (-)
Upper Band 0.25 3.14 1.50 1.50 0.10 0.18
0.25 3.14 1.05 1.05 0.10 -0.09 (-)
Beam 0.25 3.14 1.50 1.50 0.175 0.31
Item Total
S.N.
no Description No Length Breadth Height Quantity Remarks
length
0.25 3.14 1.05 1.05 0.175 -0.15 (-)
Cover 0.25 3.14 1.60 1.60 0.10 0.20
Deduction of metal cover 1 0.45 0.45 0.30 0.10 -0.01
4.3 Total 0.59 m3
Government of Nepal
Ministry of Urban Development
Department of Urban Development & Building Construction
Division Office
Gorkha
Detailed Estimate
Item Total
S.N. no Description No Length Breadth Height Quantity Remarks
length
1 E/w excavation in all kinds of soil.
2.1 Found. 1 1.15 1.15 1.15 0.20 0.26 m3
(inner size .45x.45x.45)
3 PCC (1:2:4)
sloping floor in base 1 0.49 0.49 0.72 0.05 0.02
4.2 Total 0.02 m3
4 RCC works
4.1 PCC (1:1.5:3)
base slab 1 1.15 1.15 1.15 0.10 0.13
feed plateform & ring beam 1 0.95 sectional area = 0.13 0.12
deduction center opening 1 0.49 0.49 0.37 0.07 -0.01
ash bar fix 2 0.37 0.74 0.23 0.08 0.01
cap slab with sloping front 1 0.95 sectional area = 0.13 0.12
4.3 Total 0.38 m3
Item Total
S.N. no Description No Length Breadth Height Quantity Remarks
length
6 Cement pointing (1:3)
outside 1 3.31 3.31 1.33 4.40
inside 1 1.93 1.93 1.33 2.57
7.4 Total 6.97 m2
Thirty One
Forty Eight
Seventy Six