Fpso

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MODEC leads the FPSO/FSO market in

capability, reliability and dedication.

WHY MODEC?
 SEQ FOCUS: MODEC is the first floating production
• H •  EOPLE AND CONTINUITY OF EXPERTISE: MODEC has
P
facilities company to have its Corporate HSE available resources with experience and expertise that has
Management System obtain integrated certification developed over 28 projects.
against all three international codes: ISM Code, ISO
• RELATIONSHIPS: MODEC has developed long-term
14001:2004, and OHSAS 18001:1999. Certification
international relationships with clients, engineering
was received for corporate office environments in
companies and fabricators.
Tokyo, Houston and Macaé and also for the FPSO
Cidade do Rio de Janeiro MV14, a working vessel. • NEW TECHNOLOGIES: MODEC is involved in a joint
All future facilities will comply with these international venture with Velocys and Toyo Engineering which will
HSE standards. bring proven GTL (gas to liquids) micro-technology on
board Floating Production Storage and Offloading units
•  LEXIBILITY: Lease, sale, operations, local content
F
(FPSOs). In addition, MODEC is introducing vessels
capability, commitment to the community – we meet the
designed to monetize gas including Floating Liquefied
needs of our clients– it’s part of our culture.
Natural Gas (FLNG), Floating Storage and Regasification
•  ROVEN EXPERIENCE: MODEC has delivered more
P Units (FSRU) and Floating Liquefied Petroleum Gas units
than 24 FPSO/FSO projects, and currently has five (FLPG) and vessels to enhance economics in gas
more under construction. We have time charter transportation link such as Floating Storage and
contracts on 16 vessels around the globe. Four TLPs Regasification Units (FSRU).
have been delivered and a fifth is soon to be installed
and a tested, patented semisubmersible design is
project-ready.
FPSO Cidade do Rio de Janeiro MV14 FPSO Stybarrow Venture MV16
MODEC was responsible for the engineering, procurement, MODEC executed the design, engineering, construction,
construction, installation and commissioning of the FPSO, transportation and installation of the FPSO. MODEC’s
including topsides processing equipment, hull and hull subsidiary, SOFEC, designed and built the disconnectable
systems, riser hang-offs and the SOFEC spread mooring internal turret. The disconnectable turret allows the FPSO to
system. MODEC will operate the FPSO for Petrobras for the easily evacuate when a cyclone approaches and then easily
next eight years, with four additional one-year option periods. reconnect when the storm has passed.

General Description General Description


Client: Petróleo Brasileiro S.A. (Petrobras) Client: BHP Billiton Petroleum
Operator: MODEC Operator: MODEC
Contract Award: July 2005 Contract Award: March 2006
Location: Espadarte Sul field, Brazil Location: Stybarrow Field, Australia
First Oil: January 2007 First Oil: November 2007

Project Specifications Project Specifications


Project Type: Conversion Project Type: New Build
Shipyard: Jurong Shipyard, Singapore Shipyard: Jurong Shipyard, Singapore
Tanker Size: 264,148 dwt Tanker Size: 160,000 dwt
Mooring System: SOFEC Spread Mooring Mooring System: SOFEC Disconnectable Internal
# of Risers: 34 Turret
Water Depth: 1,350 meters # of Risers: 9 + 3 future
Storage Capacity: 1,600,000 bbls Water Depth: 825 meters
Oil Production Capacity: 100,000 bopd Storage Capacity: 900,000 bbls
Gas Production Capacity: 87 mmscfd Oil Production Capacity: 80,000 bopd
Water Injection: 113,000 bwpd Gas Production Capacity: 45 mmscfd
Water Injection: 110,000 bwpd
Comments
The FPSO Cidade do Rio de Janeiro MV14 is 322 meters long, Comments
58 meters wide and 29.5 meters tall. The FPSO has been The FPSO Stybarrow MV16 is installed in Australia’s deepest
connected to nine subsea wells, five of which produce oil and oil field development. J. Michael Yeager, BHP Billiton
natural gas while the other four are used for water injection. Petroleum’s Chief Executive, said the Stybarrow development
is exceeding expectations. “The wells have ramped up to full
capacity in record time and the processing capability on the
vessel has been highly reliable,” he said. “We are very pleased
with the overall performance.”

Profit from our experience

Tokyo • Houston • Singapore • Macaé • www.modec.com

You might also like