Day 1
Reading on Tank
160 cm
Equivalent Height of Water in the Tank
4.547 m
Beaker, Water Level Elevation
40 cm
Date of Reading
Apr. 18, 2018
Time of Reading
9:00 AM
Weather Condition
Day 2
Reading on Tank
159.8 cm
Equivalent Height of Water in the Tank
4.545 m
Beaker, Water Level Elevation
39.7 cm
Date of Reading
Apr. 19, 2018
Time of Reading
9:00 AM
Weather Condition
Day 3
Reading on Tank
Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant :
Owner : Maynilad Water Services, Inc. Contractor :
Structure
WATER LEVEL MEASUREMENT RECORDS Location
Date
159.6 cm
Equivalent Height of Water in the Tank
4.543 m
Beaker, Water Level Elevation
39.6 cm
Date of Reading
Apr. 20, 2018
Time of Reading
1:00 PM
Weather Condition
Day 5
Reading on Tank
159 cm
Equivalent Height of Water in the Tank
4.537 m
Beaker, Water Level Elevation
39 cm
Date of Reading
Apr. 22, 2018
Time of Reading
11:00 AM
Weather Condition
Equivalent
Reading on Reading on
Day of Observation Date Time Water Level in
Tank, cm Beaker, cm
Tank, m
End of Stabilization Apr. 17, 2018 9:00 AM 160 4.55 40
Day 1 Apr. 18, 2018 9:00 AM 160 4.547 40
Day 2 Apr. 19, 2018 9:00 AM 159.8 4.545 39.7
Day 3 Apr. 20, 2018 1:00 PM 159.6 4.543 39.6
Day 4 Apr. 21, 2018 9:00 AM 159.4 4.541 39.4
Day 5 Apr. 22, 2018 11:00 AM 159 4.537 39
6 PM
39.7
159.8 159.6 39.8 39.6
159.6 159.4 39.6
159.4 39.4
159.2 159 39.2
159 39
158.8 38.8
158.6 38.6
158.4 38.4
1 2 3 4 5 1 2 3
Day (s) Day(s)
12 MN
6 PM 6 AM
12 NN
Record on Beaker
40.240
Reading on Beaker (cm)
40
39.7
39.8 39.6
39.6 39.4
39.4
39.2 39
39
38.8
38.6
38.4
1 2 3 4 5
Day(s)
Verified by:
Arup Representative
Project : Design and Construction of Putatan Water Treatment Plant 2 Consultant : Arup
Owner : Maynilad Water Services, Inc. Contractor : AJF Consortium
Structure BAF AREA
LEAK REPAIR Location GL 1-17/C-D
Date April 18, 2018 - April 22, 2018
Incipit:
Leak repair were already done way before the water filling period. Weve repaired the area several times and the repair were by Gabb and Nich. The picture below was
the only picture taken at the duration of water filling.
Water Level at Container Final Water Level, cm Err:509 Err:509 Err:509 Difference of Water Level (B), mm
Initial Water Level, cm 40.000
=4.547/500 x
Allowable Drop in Level (Ht/500), mm 9.094
1000
Remarks: The structure is considered water-tight.