AL-JOMAIH PACKAGING PLANTS

THIS REVISION IS NOT TO BE USED


FOR CONSTRUCTION UNTIL
CERTIFIED AND DATED
ISSUED FOR 90% DESIGN REVIEW
INSTRUMENT SPECIFICATION SHEET ROTARY METERS (TOTALIZER)
1 TAG NUMBER FQI-101 FQI-201
2 FUEL GAS FUEL GAS
REVISION DESCRIPTION

3 SERVICE MAIN HDR LINE ALUMINUM PLANT


4 LINE NUMBER

GENERAL
5 P & ID NUMBER - -
6 MANUFACTURER * *
7 MODEL NUMBER * *
8 .REQUISITION NO
MATERIAL SOURECE
9 .SAMS STOCK NO
Mar-18

10 FLUID DRY GAS A-120 DRY GAS A-120


DATE

QT-521

11 TEMPERATURE OPER. | MAX. °F 96.7 150 96.7 150


12 PRESSURE OPER. | MAX. PSI(ga) 30 350 35 350
CONTRACT NO.

13 DENSITY AT FLOW CONDITIONS lb/ft³ 0.244564 0.244564


REV. NO.

14 VISCOSITY AT FLOW CONDITIONS cp 0.0131 0.0131


A

PROCESS DATA

15 FLOW RATE MIN. | MAX.

16 FLOW RATE NORMAL | DESIGN 230 110


BY/DATE
OTHER

17 FLOW UNITS SCFM SCFM


18 CORROSIVE COMPOUNDS NONE NONE
19 COEFFICIENT OF EXPANSION

20 MAXIMUM ALLOWABLE ∆P kPa(ga) (PSIG)


OPERATIONS/DATE

21 LINE SIZE & SCHEDULE NUMBER inch 6 3


22 HAZARDOUS AREA CLASSIFICATION CL 1 DIV1 CL 1 DIV1
REVIEW FOR KEY DRAWINGS

23 BODY CONNECTION SIZE inch 6 3


24 CONNECTION RATING FACING 150# RF 150# RF
REQUIRED (BY CLIENT)

25 TYPE OF ELEMENT (ROTATING VALVE, BI-ROTOR, ETC) BI-ROTOR BI-ROTOR


26 TEMPERATURE & PRESSURE RATING * *
CONST. AGENCY/DATE

27 FLOW RATE RANGE (NOTE-2) SCFM 0 ~ 400 0 ~ 200


28 BI-DIRECTIONAL USE (YES / NO) NO NO
29 TOTALIZED UNITS CF CF
30 OUTER HOUSING ALUMINUM ALUMINUM
METER

31 MAIN BODY COVER ALUMINUM ALUMINUM


MATERIALS

32 ROTATING ELEMENT ALUMINUM ALUMINUM


33 SHAFT ST. STEEL ST. STEEL
CERTIFIED/DATE

34 BLADES
Mar-18

35 PULSE PICKUPS (YES / NO) YES YES


RCJ

36 BEARING TYPE & MATERIAL * *


DESIGN CERTIFICATION
(DESIGN AGENCY)

37 TYPE OF COUPLING * *
38 ENCLOSURE RATING NEMA 7 NEMA 7
39 POWER SUPPLY EXTERNAL EXTERNAL
40 ELECTRICAL CONNECTION SIZE & TYPE * *
ENGG./DATE

41 PULSE GENERATOR DRIVEN MAIN SHAFT (YES / NO) YES YES


Mar-18
RBT

42 ZERO SET REGISTER (YES / NO) NO. OF DIGITS YES * YES *


COUNTER

43 NON-RESET TOTALIZER (YES / NO) NO. OF DIGITS YES * YES *


44 PRINTING MECHANISM (YES / NO) NO NO
45 SET-STOP (YES / NO) NO NO
46

47 VOLUME CORRECTOR (NOTE-4) (YES / NO) YES YES


AND CERTIFICATION REQUIREMENTS, UNDER DRAWING COMPLETION
IS COVERED, FOR ALL APPROVAL

48 COMMUNICATION INTERFACE SERIAL SERIAL


49 COMMUNICATION PROTOCOL MODBUS TCP/IP MODBUS TCP/IP
50 DATA COLLECTION SOFTWARE (YES / NO) YES YES
OPTIONS

51 INTRINSICALLY SAFE BARRIER/POWER SUPPLY (YES / NO) YES YES


52 AUTOMATIC BYPASS VALVE INTEGRAL INTEGRAL
REVISION VALIDATION

53 SHUT-OFF VALVE (YES / NO)

54 STRAINER SIZE & MESH NONE NONE


55

NOTES:
1. FLOW METER/TOTALIZER ACCURACY OVER NORMAL FLOW RANGE SHALL BE ±1.0% OR BETTER.
A

2. FLOW METER/TOTALIZER SHALL BE SIZED TO OPERATE BETWEEN 30% AND 80% OF THE UPPER RANGE VALUE OF THE NAMEPLATE RATING. VENDOR TO CHECK CALCULATION
AND SELECTION AND RETURN COPY OF COMPLETED OR CORRECTED SHEET TO BUYER.
3. COPPER OR COPPER ALLOYS SHALL NOT BE USED FOR METER INTERNALS.
THIS REVISION NO.

4. VOLUME CORRECTOR TO BE SUPPLIED PRE-INSTALLED AND SHALL INCLUDE PRESSURE TRANSDUCER AND TEMPERATURE PROBE WITH COMPLETE SET OF MOUNTING
CERTIFICATE NO.

BRACKETS, CABLES, 3-WAY BALL VALVE, TUBINGS AND FITTINGS.

ISS FOR: FQI - 101 / 201 DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT NO. REV NO.

GAS DETECTION SYSTEM ISS


CID #19
AL-JOMAIH PACKAGING PLANTS J PA4-J-697010 001 A
RIYADH SAUDI ARABIA