Al Sahel Hotel & Resort - Bahrain Breakdown No.

7 - Infrastructure Works
Main Works Package (MWP2)

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


BD/FILS

ELEVATED ROAD AND ROAD BRIDGES (cont'd.)

MRB 6 AND ROAD BRIDGE No. 7 (cont'd.)

SUPERSTRUCTURE (cont'd.)

CONCRETE WORKS (cont'd.)

SUNDRIES

Expansion joint as shown in drawing and all as specified

A 20mm wide, RB7 and Roundabout 67 m

B 50mm wide, RB7 75 m

Building paper or other approved debonding membrane


as shown in drawing drawing and all as specified

C generally 45 m

1.6mm thk self adhesive reinforced bituminous sheet


waterproofing membrane as shown in drawing SE-RBA1-
110-01 and all as specified

D to deck slab, Roundabout 1,287 m2

E to deck slab, RB7 880 m2

Compressive filler as shown in drawing and all as


specified

F 25mm thk, RB7 35 m

G 75mm thk, RB7 40 m

To Collection BHD