Professional Documents
Culture Documents
DQS282 Constech Assignment (2018) Group
DQS282 Constech Assignment (2018) Group
ASSIGNMENT 2
SEMESTER : 04
GROUP 1 – PILING
1. Introduction
2. Method of driving/boring
3. Load test for piling
4. Problems occurred during piling process
5. Advantages and disadvantages of the piling
6. Conclusion
GROUP 2 – BASEMENT
1. Introduction
2. The types of excavation/method of construction
3. Problems occurred during the construction
4. Advantages and disadvantages of method of construction
5. Conclusion
GROUP 3 – STEEL STRUCTURE
1. Introduction
2. Type of steel frame
3. Method of construction/sequence of construction
4. Fire protections for the structure
5. Problems occurred during the construction
6. Conclusion
GROUP 4 – PILING
1. Introduction
2. Method of driving/boring
3. Load test for piling
4. Problems occurred during piling process
5. Advantages and disadvantages of the piling
6. Conclusion
GROUP 5 – BASEMENT
1. Introduction
2. The types of excavation/method of construction
3. Problems occurred during the construction
4. Advantages and disadvantages of method of construction
5. Conclusion
The report should be explained clearly with diagram or photographs which are taken from your
site visit.
Spacing : 1.5